Michigan building permits

Michigan has one construction code for the whole state, set under the Stille-DeRossett-Hale Single State Construction Code Act (1972 PA 230) and written by the Bureau of Construction Codes in the Department of Licensing and Regulatory Affairs (LARA). A city, village, township or county can take on enforcement by ordinance. Where none has, LARA's Bureau of Construction Codes issues the permits and does the inspections itself. Homes are still built to the 2015-based Michigan Residential Code, because a court-approved agreement has paused the 2021 update while a lawsuit by home builders goes on.

Local profiles
83
Link an online portal
48 (58%)
County office
52
City or town offices
27
State agency
4

How permits work in Michigan

Building codes

Statewide code

The State Construction Code applies everywhere in Michigan. For one- and two-family homes, the Michigan Residential Code is still based on the 2015 International Residential Code (R 408.30500). The state filed rules adopting a 2021-based residential code and residential energy code on May 1, 2025, with an effective date of August 29, 2025. In July 2025, before that date, Judge James Robert Redford of the Michigan Court of Claims signed a stipulated order in a suit brought by the Home Builders Association of Michigan and the Michigan Manufactured Housing Association. Under that order LARA agreed not to implement the 2021 residential and residential energy rules while the case continues, so the 2015 residential code and the residential provisions of the 2015 energy code still apply. Other parts of the code have moved ahead. The Michigan Building Code (2021 IBC) took effect April 9, 2025. The Michigan Electrical Code (2023 NEC, second printing, with Michigan amendments) and the Michigan Plumbing Code (2021 IPC) took effect March 12, 2024. The Michigan Mechanical Code (2021 IMC) took effect March 12, 2024.

Michigan Department of Licensing and Regulatory Affairs (LARA), Bureau of Construction Codes

Outside city limits

Michigan has no unincorporated land in the usual sense. Land outside cities and villages lies in townships. Under the State Construction Code Act (MCL 125.1508b), a city, village, township or county may take on enforcement of the code by ordinance and designate an enforcing agency. Where no local government has done so, the state is responsible, and LARA's Bureau of Construction Codes issues permits and does inspections directly. A local government that drops enforcement must rescind its ordinance, and the change takes effect 12 months later. Some places enforce one trade locally while the state handles another, so check who issues building, electrical, plumbing and mechanical permits for your address. Ask your township, city or village first, then the county, then LARA.

Contractors and owner-builders

Michigan licenses residential builders and residential maintenance and alteration contractors under Article 24 of the Occupational Code (1980 PA 299). A license is needed for residential work where the total contract price for one project, including labor and materials, is $600 or more. Splitting a larger job into smaller contracts to stay under $600 is not allowed. The law exempts several groups, including a property owner working on a structure for the owner's own use and occupancy, an owner of rental property doing maintenance and alteration on that property, and licensed electrical, plumbing and mechanical contractors doing their own trade's work. Homeowners can pull their own permits for a single-family home they occupy or will occupy and can act as their own general contractor. Anyone they hire must hold the right license, and section 23a of the State Construction Code Act (MCL 125.1523a) sets civil fines for conspiring to get around the licensing requirements.

Michigan Department of Licensing and Regulatory Affairs (LARA) · Look up a license

Electrical, plumbing, and HVAC

Electrical, plumbing and mechanical (HVAC) contractors and workers are licensed by the state under the Skilled Trades Regulation Act (2016 PA 407). Each trade has a homeowner exception. The electrical article does not require a license for installation, alteration or repair of electrical equipment by a homeowner in a single-family home and its outbuildings that the homeowner owns and occupies or will occupy (section 737). The mechanical article lets the owner of a single-family home that is or will become their residence install a heating or refrigerating system personally, if the owner affirms this on the permit application, gets the permit and gets the final inspection (section 819). Otherwise, plumbing permits are issued only to licensed plumbing contractors (section 1125). Local plumbing permit forms include a homeowner affidavit for work the owner does personally in a single-family home they live in or are about to occupy. Permits and inspections for all three trades come from the local enforcing agency, or from LARA's Bureau of Construction Codes where no local agency enforces that trade.

State programs that can affect your permit

  • Soil erosion and sedimentation control (Part 91)

    Under Part 91 of the Natural Resources and Environmental Protection Act (1994 PA 451), a soil erosion permit is generally needed for earth changes that disturb more than one acre, or for any earth change within 500 feet of a lake or stream. These permits are separate from building permits. They come from the county enforcing agency, often the drain commissioner, or from a city, village or township that enforces Part 91 itself. Many counties add their own triggers, such as work near county drains, wetlands or steep slopes.

  • Manufactured home installation

    LARA's Bureau of Construction Codes writes the state's manufactured housing rules. Homes must be installed according to the manufacturer's written instructions and anchored. Permits for footings, accessories and the installation of the home come from the enforcing agency under the State Construction Code Act (R 125.1602).

Michigan county directory

83 local profiles

Portal links an online permit portal (48). Fees links a fee schedule (51). Profiles that point to a city, town or state agency are labeled.

A

B

C

D

E

G

H

I

J

K

L

M

N

O

P

R

S

T

V

W

Profiles marked “City or town offices” point to municipal permit offices because the county does not issue general building permits. Profiles marked “State agency” point to a state program that handles permits or oversight there.

Statewide rules for common projects

  • Sheds and accessory buildings

    Under the current Michigan Residential Code rules (R 408.30505), a one-story detached accessory structure with a floor area of 200 square feet or less does not need a building permit. The exemption does not excuse the structure from meeting the code.

    Official source · Sheds and accessory buildings permit guide

  • Fences

    Under R 408.30505, a fence no more than 7 feet high does not need a building permit under the residential code. Local zoning rules on fence height and placement still apply.

    Official source · Fences permit guide

  • Decks

    Under R 408.30505, a deck needs no building permit only if it is 200 square feet or less, no more than 30 inches above grade, not attached to the house, not within 36 inches of the house and does not serve an entry door. Other decks need a permit.

    Official source · Decks permit guide

  • Electrical work

    The Michigan Electrical Code (2023 NEC, second printing, with Michigan amendments, effective March 12, 2024) governs electrical installations statewide. Electrical permits come from the local enforcing agency, or from LARA's Bureau of Construction Codes where no local agency enforces electrical.

    Official source · Electrical work permit guide

Michigan permit questions

Which residential code is in effect in Michigan right now?

The 2015-based Michigan Residential Code. A 2021-based residential code and residential energy code were set to take effect August 29, 2025. A July 2025 Court of Claims order, agreed to by LARA in a suit brought by home builders, put them on hold while the case goes on. Ask your building department which edition your permit will be reviewed under, because the 2021 code could take effect once the case ends.

Who issues building permits if my township doesn't have a building department?

The state does. Under the State Construction Code Act, a township, city, village or county can take on code enforcement by ordinance. Where none has, LARA's Bureau of Construction Codes issues the permits and does the inspections. In some areas a county or the state handles one trade, such as electrical, while the township handles another, so confirm for each permit.

Can I do my own electrical, plumbing or furnace work in Michigan?

Yes, on a single-family home you own and live in or will live in. The Skilled Trades Regulation Act exempts a homeowner doing electrical work in their own single-family home and outbuildings, and it lets an owner-occupant install their own heating or cooling system. Local plumbing permits for homeowners require an affidavit that you will do the work yourself in your own single-family home. You still need the permit and the inspections, and the exemption does not cover rental property or work for others.

Does a contractor need a license for a small home repair job in Michigan?

For residential work, a residential builder or maintenance and alteration contractor license is required once the total contract price for a project reaches $600, counting labor and materials. Breaking one job into several smaller contracts to stay under $600 does not avoid the requirement. Electricians, plumbers and HVAC contractors need their own state trade licenses. You can check any license on LARA's online lookup.

Do I need a separate soil erosion permit to build near a lake?

Usually, yes. Michigan's Part 91 rules generally require a soil erosion permit for earth changes within 500 feet of a lake or stream, or for disturbing more than one acre. You get it from the county enforcing agency or from a local government that enforces Part 91 itself, separately from the building permit.

Permit guides for common projects

What the model codes say, what local offices often change and what to ask; read them with the Michigan rules above.

Sources

Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction