Quick answer

Start with the office that issues permits for the address today: a county, a city or town, or in some states a state agency. Search its online permit portal by street address or parcel number, and look at each permit's status. "Finaled" or "closed" means the work passed its final inspection. An open permit with no recent inspections may have expired: under the 2024 IRC a permit becomes invalid if work doesn't start within 180 days, or if more than 180 days pass between inspections (R105.5). Portals often cover only recent years, so ask the office for older files, or file a public records request. Compare what you find with the assessor's record of the house to spot additions or conversions that have no permit.

Who keeps the records

A permit record lives with the office that issued the permit. That is usually the building department of the county, or of the city or town if the property is inside its limits. In some states a state agency issues some or all permits. Michigan is a good example: its Bureau of Construction Codes publishes a Statewide Jurisdiction List that says, for every city, village and township, whether building, electrical, mechanical and plumbing codes are enforced locally, by the county, or by the state. “If STATE is indicated, the Bureau of Construction Codes is responsible for code enforcement in that unit of government.” The state’s own permits are searchable in its online portal.

Two consequences matter when you search:

  • The issuing office can change. A city may have annexed the land, or a township may have handed enforcement to the county. Records from before the change may still be with the old office.
  • Trades can be split. In some places the building permit came from the city and the electrical permit from the state or county. A complete history may mean searching two or three systems.

Use our state directory or the county search to find the office that serves the address today. Each county profile links the official portal where one exists.

Searching an online permit portal

Many permit offices that publish records online use a commercial permitting system rather than a custom website. Among the county listings in our directory that link to an online portal, the systems we see most often are Accela (126 listings), iWorQ (94), SmartGov (82), Tyler EnerGov (67), OpenGov (56), CitizenServe (26), MGO Connect (25) and Cloudpermit (22). BS&A Online is common in Michigan (16 county listings). The screens differ, but the search works the same way in almost all of them:

  1. Look for a public search. It is often labeled “Search Permits,” “Search Applications,” “Search Records” or “Public Records Search.” You usually don’t need an account to search, only to apply. Sarasota County’s Accela portal, for example, has a search tab for each module (Building, Enforcement, Planning and others).
  2. Search by address first, then parcel number. Enter the house number and street name only, without “Street,” “Rd” or the unit. If that fails, search by the parcel number from the assessor’s record, which doesn’t change when an address is renamed.
  3. Widen the date range. Some portals default to the last few months.
  4. Check every record type. Building, electrical, plumbing, mechanical, roofing, zoning and code enforcement records may be in separate modules or tabs.
  5. Open each permit. The detail page usually shows the description of work, the contractor, the inspection history and the current status.

Watch for a cutoff date. When an office changes software, older records are often left in the old system. Sarasota County’s portal, for example, links separately to “Permits Closed Prior to August 18, 2023.” If a portal shows nothing before a certain year, ask the office where the older records are.

Reading permit statuses

Status names vary by system, but these are the common ones:

  • Issued or active: the permit is valid and work is underway or about to start.
  • Finaled, closed or complete: the work passed its final inspection. This is the status you want to see for finished work.
  • Expired: the permit lapsed before a final inspection. Under the 2024 IRC (R105.5), a permit “shall become invalid” unless the work starts within 180 days of issuance, or if more than 180 days pass between inspections after work begins. The building official may grant extensions in writing.
  • Void, withdrawn or cancelled: the permit was abandoned before work started, or replaced by another permit.
  • Under review or pending: an application that hasn’t been issued yet. The 2024 IRC treats an application as abandoned 180 days after filing unless it is being pursued in good faith (R105.3.2).

A certificate of occupancy (R110) or certificate of completion is usually issued for new houses, additions and changes of use, but not for most repairs or trade permits.

Compare permits with the assessor’s record

The assessor’s or property appraiser’s record describes the house as it is taxed today: living area, year built, number of bedrooms and bathrooms, and often a sketch and a list of improvements. Put it next to the permit history:

  • Living area that grew with no addition permit. A finished basement, enclosed porch or converted garage often shows up as added square footage.
  • More bathrooms or bedrooms than the original plans. These usually involve plumbing, electrical and egress work that needed permits.
  • Outbuildings, pools and decks in the sketch or aerial photos with no matching permit.
  • New systems with no trade permit. A newer roof, furnace, water heater or panel with no permit on file is worth asking about.

A gap isn’t proof of unpermitted work. The work may predate permit requirements in that area, may have been exempt, or may be filed under an old address. But it tells you what to ask about.

Requesting older or missing records

If the portal doesn’t have what you need, ask the permit office first. Many offices pull old permit cards, microfilm or archived plans for walk-in or emailed requests.

If you need a formal request, use your state’s public records law. The federal Freedom of Information Act gives the right to request records “from any federal agency,” so it doesn’t cover a county or city building department. Every state has its own law instead, and the rules differ. Virginia’s, for example, requires a public body to respond “promptly, but in all cases within five working days,” lets it extend that time in some cases, and limits charges to “reasonable charges not to exceed its actual cost” (Va. Code § 2.2-3704). Many county websites have a records-request or freedom of information page.

A good request names the property address and parcel number, the type of records you want (permits, inspection results, certificates of occupancy, approved plans, code enforcement cases), and the date range.

Plans may be gone. The model code only requires the building official to keep approved construction documents “for a period of not less than 180 days from date of completion of the permitted work,” unless state or local law says longer (R106.5). Permit records themselves are usually kept far longer than plans.

Why permit history matters when buying a house

  • Disclosure. Many states require sellers to disclose known problems with a house, and some disclosure forms ask about permits directly. Texas’s seller’s disclosure notice, for example, asks whether the seller is aware of “room additions, structural modifications, or other alterations or repairs made without necessary permits or not in compliance with building codes in effect at that time.”
  • Open permits follow the property. An open or expired permit is a record of work that was never approved. The new owner may be the one asked to finish it.
  • Code enforcement cases can carry fines or orders that the office expects to be resolved before it issues new permits.
  • Future projects. If you plan to remodel, the office may ask about earlier unpermitted work it finds during your review or inspections.

Search before your inspection or due-diligence period ends, so there is time to ask the seller for permits, final inspection records or a credit.

If you find unpermitted work

Don’t assume it has to come out. The usual path is an after-the-fact permit: apply, show what was built, open up what the inspector needs to see, and correct anything that doesn’t meet code. Our guide to work done without a permit covers the process, fees and options. For what a new permit will involve, see how to get a building permit and building permit costs.

Common mistakes

  • Searching only the county portal for a property inside city limits, or the reverse.
  • Searching a full street address with suffixes and unit numbers, when the portal matches on the house number and street name.
  • Stopping at the portal’s earliest year instead of asking about archived records.
  • Missing trade permits filed in a separate module or with a state agency.
  • Treating “issued” as “approved.” Only a final inspection, certificate of occupancy or certificate of completion shows that the work was approved.

Common questions

Can I look up building permits by address for free?

Usually, yes. Most online permit portals let anyone search by address or permit number without an account, and searching is free. Copies of plans or archived files can carry a copying charge. Under Virginia's public records law, for example, a public body may charge only reasonable fees that don't exceed its actual cost (Va. Code § 2.2-3704(F)).

Why can't I find any permits for my house?

The most common reasons are searching the wrong office (a city permit won't show in a county portal), a portal that only covers recent years, an address that changed since the permit was issued, or work done before the area required permits. Search by parcel number as well as address, then ask the permit office directly whether it holds older paper or microfilm records.

What does an open or expired permit mean when I'm buying a house?

An open permit was issued but never received a final inspection. It may be work that was finished but never inspected, or work that was abandoned. Under the model code an inactive permit becomes invalid, so finishing the work may need a new permit and new fees. Ask the seller to close it out, or to get the office's written confirmation of what is still needed, before closing.

Can I get copies of the plans for my house?

Sometimes. The 2024 IRC only requires the building official to keep approved construction documents for at least 180 days after the work is completed, unless state or local law requires longer (R106.5). Many offices keep plans much longer, but some states limit who can copy plans. Ask the permit office what it holds and what its copying rules are.

Do I need a FOIA request to see building permits?

Not usually for basic permit history, which most offices show online or at the counter. The federal FOIA covers federal agencies, not counties or cities. For records the office won't give you informally, use your state's public records law, which may be called a freedom of information act, an open records act or a public information act.

Check your county’s rules

The rules above are a starting point. Your county, city or state agency decides which rules and code edition apply, what it changed, and what it charges. Look up the permit office that serves your address.

Sources

Last reviewed November 2026. Code section numbers such as R105.2 refer to the International Code Council’s model codes; CFR citations refer to the Code of Federal Regulations. We checked the wording against the sources linked above; code adoptions cited there reproduce the model text without amendment unless the source notes a state amendment. Codes take effect only when a state or local government adopts them, and many make amendments. This guide is general information, not legal or engineering advice. Suggest a correction