Quick answer
1. Confirm the work needs a permit. 2. Find the office that serves your address. 3. Check zoning and other approvals. 4. Prepare plans and a site plan. 5. Apply and pay. 6. Answer plan review comments. 7. Post the permit and build. 8. Call for each inspection before covering work. 9. Pass the final and get a certificate of occupancy if one is required. Under the 2024 International Residential Code, a permit becomes invalid if work doesn't start within 180 days of issuance, or if more than 180 days pass between inspections (R105.5). An application is treated as abandoned 180 days after filing unless you're pursuing it in good faith (R105.3.2). Homeowners can usually pull their own permits for a home they live in, but state law decides which trades they can do themselves.
Step 1: Confirm the work needs a permit
The IRC requires a permit to “construct, enlarge, alter, repair, move, demolish or change the occupancy” of a house, or to install or change any electrical, gas, mechanical or plumbing system the code regulates (R105.1). Section R105.2 then lists exempt work, such as small freestanding sheds, low fences, painting and flooring, and some minor trade work. Local codes often change that list.
Our project guides walk through the exemptions for decks, fences, sheds, roofs, water heaters, HVAC, electrical work, solar, pools and ADUs. Exempt work still has to meet the code and zoning rules.
Step 2: Find the office that serves your address
The permit comes from whichever government enforces the building code at your property:
- Inside city or town limits, usually the city or town.
- In unincorporated areas, usually the county. Some rural counties don’t issue building permits at all, though state rules, septic permits or electrical permits may still apply.
- In some states, a state agency for some or all trades. In Michigan, the state’s Statewide Jurisdiction List shows whether each community’s building, electrical, mechanical and plumbing codes are enforced locally, by the county or by the state.
Search our directory by county or browse the state pages, then confirm with the office that it serves your exact address. Near a city boundary, the parcel record usually shows which jurisdiction it’s in.
Step 3: Check zoning and other approvals first
The building permit answers “is it built safely?” Other approvals answer “is it allowed here?” and often have to come first. Montmorency County, Michigan, for example, tells applicants to confirm “whether township zoning, Soil Erosion & Sedimentation Control (SESC), health department, road commission, floodplain/EGLE, or other approvals are required” before applying. Typical ones:
- Zoning: permitted use, setbacks, height, lot coverage, and accessory building or ADU rules.
- Septic and well permits from the health department, for properties without public sewer or water.
- Driveway or right-of-way permits from the road agency.
- Floodplain, wetland and erosion-control permits.
- Historic district or HOA design approval. An HOA approval doesn’t replace a permit, and a permit doesn’t override HOA rules.
For a new house, these approvals decide what you can build, so settle them before paying for final drawings.
Step 4: Prepare plans and documents
The IRC requires construction documents and a site plan, but lets the building official waive drawings when the work is simple enough (R106.1 exception). What you’ll usually need:
- Site plan “showing the size and location of new construction and existing structures on the site,” with distances from lot lines (R106.2).
- Construction drawings showing the work clearly enough for the reviewer to check it against the code: floor plans, framing, foundations, sections and details. A registered design professional is needed only “where required by the statutes of the jurisdiction” (R106.1), or for engineered elements.
- Energy code documents for new houses and additions.
- Product information for items like manufactured trusses, windows in hurricane zones, or equipment.
- Contractor information, or an owner-builder form.
- The project’s value, since many fee schedules are based on it. See building permit costs.
Step 5: Apply and pay
Many offices take applications through an online portal, and others still accept paper or email. The IRC calls for a written application that describes the work, identifies the site, includes the construction documents and states the valuation (R105.3). The permit “shall not be valid until the fees prescribed by law have been paid” (R108.1).
Keep the application moving. Under R105.3.2, an application “shall be deemed to have been abandoned 180 days after the date of filing” unless it’s being pursued in good faith or a permit has been issued.
Step 6: Plan review
A reviewer checks the drawings against the adopted codes and local amendments. Expect written comments asking for corrections or more detail. Answer every item, mark the changes on revised sheets, and resubmit. Approved drawings are stamped. The IRC uses the words “REVIEWED FOR CODE COMPLIANCE” (R106.3.1).
Review times vary widely. Florida is one of the few states that sets them in law: for a complete application for a single-family home under 7,500 square feet, the local government must approve, approve with conditions, or deny within 30 business days, or reduce the permit fee by 10% for each business day it is late (F.S. 553.792).
Step 7: Get the permit and start work
Once fees are paid, the permit is issued. The permit or a copy “shall be kept on the site of the work until the completion of the project” (R105.7), usually posted where it can be seen from the street. Keep the approved plans on site for the inspector.
If you change the design during construction, the changes need approval as an amendment (R106.4). Changing a beam size, moving a wall or adding a window can affect what the inspector will accept.
Step 8: Call for inspections
It’s the permit holder’s job to tell the building official when work is ready for inspection (R109.3). The IRC lists these inspections (R109.1):
- Foundation, after trenches are dug and forms and reinforcing steel are in place, before concrete is placed.
- Plumbing, mechanical, gas and electrical rough-in, before they are concealed.
- Floodplain documentation, where the house is in a flood hazard area.
- Frame and masonry, after the roof, masonry, framing, firestopping, draftstopping and bracing are in place and the rough-ins are approved.
- Other inspections the building official requires, such as fire-resistance-rated construction.
- Final, “after the permitted work is complete and prior to occupancy.”
Small permits may need only a final. Don’t cover anything early: “Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the building official” (R109.4). Failed inspections usually need a reinspection, which often has a fee.
Step 9: Final inspection and certificate of occupancy
A new house, or a change in how a building is used, needs a certificate of occupancy before anyone moves in (R110.1). The building official can issue a temporary certificate “before the completion of the entire work covered by the permit,” if the occupied part is safe (R110.3). For remodels and trade work, the passed final inspection is the record that the job was approved. Utilities also depend on it: a utility connection can’t be made to work that needs a permit “until approved by the building official” (R111.1).
Keep copies of the final inspection and certificate. You’ll want them when you sell, refinance or file an insurance claim. See looking up permit records.
Keep the permit active
The 2024 IRC says a permit becomes invalid unless the work starts within 180 days after it is issued, or if more than 180 days pass between inspections once work has started (R105.5). The commercial code, the 2024 International Building Code, uses older wording in its Section 105.5: work suspended or abandoned for 180 days. Under both, the building official can grant extensions of up to 180 days each, requested in writing with justifiable cause.
Many local codes change these periods, so check the expiration rule printed on your permit. An inspection, even a partial one, is often what keeps the permit alive.
Owner-builder permits
Most states let owners pull permits and do work on a single-family home they own and live in, but the conditions vary:
- Florida lets owners act as their own contractor for a one- or two-family home for their own use. The owner must sign the application in person, sign a state disclosure statement, and supervise the work directly. Selling or leasing within a year of completion creates a legal presumption that it was built for sale (F.S. 489.103(7)).
- Some trades stay licensed. In some places electrical or plumbing work must be done by a licensed contractor even on an owner-builder project, and in Washington, D.C., electrical permits go only to licensed master electricians.
- Hiring help. Owner-builders who hire unlicensed workers may take on employer responsibilities, and some states fine schemes to get around licensing laws.
Each state page summarizes its contractor licensing and owner-builder rules.
Common mistakes
- Applying to the wrong office, especially near city limits.
- Drawing the project before checking setbacks, septic area or easements.
- Starting work before the permit is issued. It usually means added fees: see work done without a permit.
- Covering work before it’s inspected. Insulation or drywall may have to come off.
- Changing the design without approval.
- Letting the permit lapse during a long pause.
- Not getting the final. A permit that never received a final inspection shows up as open or expired when you sell.
Common questions
What is the first thing I need when building a new house?
Before drawings, confirm the lot can be built on the way you plan: zoning (use, setbacks, minimum lot size), road access and driveway approval, and water and sewer, or a well and septic approval from the health department. Many counties won't accept a building permit application until those are cleared. Then find the building department that serves the address and ask for its new-home checklist.
How long does it take to get a building permit?
Simple permits such as a water heater or reroof are often issued the same day or within a few days. Projects that need plan review, such as decks, additions and new houses, commonly take a few weeks, longer in busy areas or if the reviewer asks for corrections. Florida sets legal deadlines: 30 business days for a complete application for a home under 7,500 square feet, and 5 business days for many jobs on an existing house under $15,000 (F.S. 553.792).
Can a homeowner get their own building permit?
Usually, for a single-family home they own and live in or will live in. The rules come from state and local law. Florida's owner-builder exemption, for example, requires the owner to appear in person, sign a state disclosure statement, and directly supervise the work, and the home must not be built for sale or lease (F.S. 489.103(7)). Many states still require licensed electricians or plumbers for some trade work. Check your state page.
Do I need an architect or engineer?
Not for most single-family projects. The IRC requires construction documents to be prepared by a registered design professional only 'where required by the statutes of the jurisdiction' (R106.1). Engineered elements such as long-span beams, retaining walls, and homes in high-wind or seismic areas often need a professional's stamp. The building official can also waive drawings for minor work.
What happens if my permit expires?
Under the model code the permit becomes invalid, and work can't legally continue until it is renewed or replaced. Many offices charge a renewal or reactivation fee: Columbia County, Georgia, charges $75 to reactivate a permit. Ask for an extension in writing before the deadline; the IRC lets the building official grant extensions of up to 180 days each for justifiable cause (R105.5).
Check your county’s rules
The rules above are a starting point. Your county, city or state agency decides which rules and code edition apply, what it changed, and what it charges. Look up the permit office that serves your address.
Sources
- 2024 International Residential Code, Chapter 1 (R105 permits, R106 construction documents, R109 inspections, R110 certificate of occupancy, R111 service utilities), unamended adoption reproduced by UpCodesup.codes
- 2024 International Building Code, Chapter 1 (Section 105.5 expiration), unamended adoption reproduced by UpCodesup.codes
- Florida Statutes § 553.792: Building permit application to local government (review deadlines)www.leg.state.fl.us
- Florida Statutes § 489.103: Exemptions (owner-builder disclosure statement)www.leg.state.fl.us
- Michigan LARA Bureau of Construction Codes: Statewide Jurisdiction Listwww.michigan.gov
- Montmorency County, Michigan: Building Department (before-you-apply approvals)www.montcounty.org
- Columbia County, Georgia: Building Standards Fee Schedule (effective July 8, 2026)columbiacountyga.gov
Last reviewed November 2026. Code section numbers such as R105.2 refer to the International Code Council’s model codes; CFR citations refer to the Code of Federal Regulations. We checked the wording against the sources linked above; code adoptions cited there reproduce the model text without amendment unless the source notes a state amendment. Codes take effect only when a state or local government adopts them, and many make amendments. This guide is general information, not legal or engineering advice. Suggest a correction