Quick answer
Homes built after June 15, 1976 to HUD's federal construction standards (24 CFR Part 3280) carry a HUD certification label on each section. The building department doesn't review the factory construction. It reviews the installation: the site, footings or foundation, anchoring against wind, utility connections, and any site-built additions. Federal Model Installation Standards (24 CFR Part 3285) set the minimum for new homes, and the manufacturer's instructions must meet or exceed them. Installers are licensed by your state or, in states without their own program, by HUD (24 CFR Part 3286). Zoning decides whether a manufactured home is allowed on your lot at all, and septic, well, and electric service need their own approvals.
What counts as a manufactured home
Federal law defines a manufactured home as “a structure, transportable in one or more sections,” that in traveling mode is “8 body feet or more in width or 40 body feet or more in length,” or is “320 or more square feet” when set up, and is “built on a permanent chassis” (24 CFR 3280.2). HUD notes that a manufactured home is “formerly known as a mobile home.”
Three things on the home tell an inspector what it is and where it can go:
- The certification label (“HUD tag”). HUD says all transportable sections “built in the U.S. after June 15, 1976 must contain a certification label.” It is a small aluminum plate, about 2 by 4 inches, at the taillight end of each section (24 CFR 3280.11). Missing labels are a common problem with used homes.
- The data plate, usually inside near the main electrical panel. It lists the manufacturer, serial number, and date of manufacture, and has maps showing the wind zone and roof load zone the home was designed for, along with its heating and insulation zone (24 CFR 3280.5). HUD advises never placing a home in a more restrictive wind, thermal, or roof load zone than the one it was built for.
- The manufacturer’s installation instructions, which the local office will want to see.
Modular homes are different. They are built in a factory to the building code for site-built houses, not to the HUD Code, and are generally permitted like any new house once set on a foundation. Homes built before June 15, 1976 predate the HUD Code, and many jurisdictions restrict moving them in. Ask your zoning office before buying one.
The federal installation standards
HUD’s Model Manufactured Home Installation Standards (24 CFR Part 3285) “provide minimum requirements for the initial installation of new manufactured homes.” They “serve as the basis for developing the manufacturers’ installation instructions,” which must meet or exceed them. A state that runs its own installation program must set standards at least as protective. The standards don’t relieve anyone of “responsibility for compliance with other applicable ordinances, codes, regulations, and laws,” so local rules still apply.
Part 3285 covers pre-installation considerations, site preparation, foundations, anchorage against wind, ductwork, plumbing and fuel supply connections, electrical connections, and exterior and interior close-up. A few provisions come up often at the permit counter:
- Frost line. “Conventional footings must be placed below the frost line depth for the site” (3285.312). A monolithic slab or insulated foundation can be used above the frost line only if a registered engineer or architect designs it. If the local authority doesn’t publish a frost depth, an engineer, architect, or geologist must determine it.
- Fire separation. Distances to other structures follow NFPA 501A or “the requirements of the LAHJ” (local authority having jurisdiction) (3285.101).
- Flood hazard areas get their own section (3285.102), and local floodplain rules apply on top.
Installers and the installation program
The installation program itself is in 24 CFR Part 3286. HUD regulates installation in every state unless the state has been accepted to run its own program. A state program must have installation standards that meet or exceed HUD’s, training and licensing of installers, and inspection of installations. In states where HUD runs the program, HUD licenses installers and registers their trainers, and installations are inspected under Part 3286. HUD’s installation complaint page lists the contact for every state’s program.
State programs vary. North Carolina’s Office of State Fire Marshal, for example, licenses set-up contractors, and the company’s qualifier must pass a written test on the state’s Regulations for Manufactured Homes. Ask for your installer’s license number and put it on the permit application.
Local permits: setup, foundation, and site work
The county or city building department issues the permit for the installation and the site work around it. Permit Sonoma’s policy for manufactured homes on private property shows what a typical process looks like:
- Two foundation paths. A permanent foundation needs a building permit, with a site plan, approved floor plans, and foundation plans. The foundation must be a state-approved manufactured home foundation system or designed and stamped by a California-licensed engineer or architect. A non-permanent “set-up” support and anchorage system still needs a building permit, and the installation manual must be uploaded.
- Approvals before the permit issues. Zoning and planning, well and septic or sewer, fire, encroachment (driveway access), and grading and stormwater approvals must be in place, and their fees paid.
- Who inspects what. The state housing agency handles alterations to the home’s own structure, plumbing, electrical, and mechanical systems. The county handles the support system, utility connections, and site-built additions such as garages, carports, decks, and stairs.
- Personal or real property. A home on a non-permanent support system stays personal property. A home on a permanent foundation can become real property once state forms are recorded with the county recorder.
Utility and septic hookups
- Electric service. The power company won’t energize a new service until the electrical work passes inspection. Montana’s law, for example, bars power suppliers from connecting an installation until they receive an electrical permit, apart from limited temporary connections.
- Septic. If the lot isn’t on public sewer, you’ll need a septic permit for a new system, or an evaluation showing an existing system can handle the home. EPA notes that in most states local health departments issue these permits.
- Water, gas, and propane. Well permits, gas piping, and propane tank placement have their own permits and setbacks.
- Decks, steps, and porches at the doors are site-built work and usually need their own permit. See our deck permit guide.
Zoning limits
Zoning is usually the first question, and sometimes the end of the project. Local ordinances may:
- allow manufactured homes only in certain districts or in manufactured home parks;
- set design standards, such as roof pitch, eaves, siding, skirting, minimum width, or a permanent foundation;
- limit how old a home may be when it’s moved onto a lot;
- apply ordinary setbacks, lot coverage, and the number of dwellings allowed on a lot.
Some states limit how far local zoning can go. California Government Code §65852.3 requires cities and counties to allow certified manufactured homes on foundation systems on lots “zoned for conventional single-family residential dwellings.” It limits architectural requirements to the home’s “roof overhang, roofing material, and siding material,” and bars standards that have the effect of “precluding manufactured homes from being installed as permanent residences.” It also lets a local government refuse homes where “more than 10 years have elapsed between the date of manufacture” and the permit application.
HOA covenants and deed restrictions often prohibit manufactured homes outright. Check the title documents before you buy the lot.
Temporary placement permits
Many counties allow a manufactured home or RV on a lot temporarily:
- During construction. Sonoma County’s zoning lists the “temporary construction site dwelling” as an allowed use, under a separate temporary permit. Ask whether your county ties a construction-period permit to the building permit for the permanent house, and when the temporary home must leave.
- Medical or caregiver hardship. Clark County, Washington’s code provides for temporary hardship dwellings. The dwelling must be removed within thirty days after the permit expires or the hardship ends, whichever comes first.
- After a disaster, while the main house is rebuilt.
Temporary permits come with conditions: time limits and renewals, septic and utility approval, sometimes a recorded agreement or bond, and removal by a deadline. Ask what happens to the utility connections when the temporary home leaves.
Permits and inspections you can expect
- Zoning approval for the home on the lot, including any design standards.
- Septic or sewer and well approvals.
- Setup or building permit for the foundation or support system and anchoring.
- Footing or pier inspection before the home is set, where required.
- Installation inspection of blocking, anchors, crossover connections, and close-up, by the local office, the state program, or HUD’s inspector depending on your state.
- Electrical, plumbing, and gas connection inspections, followed by release to the utility.
- Permits for decks, steps, garages, or carports.
- Final approval or certificate of occupancy before move-in.
What to prepare
- HUD label numbers and data plate information, including the wind, roof load, and thermal zones.
- The manufacturer’s installation instructions for your model.
- Site plan showing the home, setbacks, driveway, septic and well, utility routes, and any flood zone.
- Foundation or support plan. Engineered plans if you’re using a permanent foundation or building above the frost line.
- Installer’s license number.
- Septic or sewer approval and well records.
- Proof of ownership, and the home’s title if you’re converting it to real property.
Common mistakes
- Buying a used home before checking zoning, then learning it’s too old, too narrow, or not allowed in the district.
- Placing a home in a stronger wind or snow zone than it was built for. Check the data plate first.
- Buying a used home with missing HUD labels without first asking the permit office how it handles them.
- Setting footings above the frost line without an engineered design.
- Moving in before final inspection and utility release.
- Building steps and decks without a permit. These often fail inspection at resale.
Planning a second unit instead? See our accessory dwelling unit guide. If you’re building or setting up the home yourself, read our owner-builder guide.
Common questions
Can I put a manufactured home on my own land?
That depends on local zoning. Some districts allow manufactured homes like any house, some limit them to parks or rural zones, and some add design standards. A few states limit local restrictions. California, for example, requires cities and counties to allow certified manufactured homes on foundation systems on lots zoned for single-family homes. Ask your zoning office before you buy.
Do I need a licensed installer?
In most places, yes. Every state either runs its own installation program, which must include installer training and licensing, or relies on HUD's program, under which HUD licenses installers. Check with your state's manufactured housing agency about who may set up a home there.
What is the difference between a manufactured home and a modular home?
A manufactured home is built on a permanent chassis to the federal HUD Code and carries a HUD label. A modular home is built in sections in a factory to the state or local building code that applies to site-built houses, and is usually regulated as a site-built home once it's set on a foundation.
Can I live in a manufactured home while I build a house?
Many counties allow it with a temporary permit. Sonoma County, California, for example, allows a manufactured home as a temporary construction site dwelling under a temporary permit. Expect a time limit and a deadline for removing the temporary home.
Can I move an older mobile home onto my lot?
Often not. Homes built before June 15, 1976 predate the HUD Code, and many jurisdictions limit them. Some also limit newer homes by age. Under California law, a local government may refuse installation where more than 10 years have passed between the date of manufacture and the permit application. Sonoma County's zoning doesn't allow permanent foundations for manufactured homes over 10 years old.
Check your county’s rules
The rules above are a starting point. Your county, city or state agency decides which rules and code edition apply, what it changed, and what it charges. Look up the permit office that serves your address.
Sources
- 24 CFR 3280.2, definition of manufactured home (LII)www.law.cornell.edu
- 24 CFR 3280.5, data plate (LII)www.law.cornell.edu
- 24 CFR 3280.11, certification label (LII)www.law.cornell.edu
- 24 CFR 3285.1, Model Manufactured Home Installation Standards scope (LII)www.law.cornell.edu
- 24 CFR Part 3285, table of subparts (LII)www.law.cornell.edu
- 24 CFR 3285.101, fire separation (LII)www.law.cornell.edu
- 24 CFR 3285.312, footings and frost line (LII)www.law.cornell.edu
- 24 CFR Part 3286, Manufactured Home Installation Program (LII)www.law.cornell.edu
- HUD: Manufactured Housing Homeowner Resourceswww.hud.gov
- HUD: How and where to file an installation complaint (state and HUD installation program contacts)www.hud.gov
- NC Office of State Fire Marshal: Manufactured Building Divisionwww.ncosfm.gov
- Permit Sonoma Policy 4-0-10: Placement of manufactured homes on private propertypermitsonoma.org
- California Government Code §65852.3, manufactured homes on single-family lotscalifornia.public.law
- Clark County, Washington Code 40.240.210, temporary use hardship dwellingscodepublishing.com
- Montana MCA 50-60-605, power supplier not to energize installation without electrical permitmca.legmt.gov
- U.S. EPA: Frequent questions on septic systemswww.epa.gov
Last reviewed November 2026. Code section numbers such as R105.2 refer to the International Code Council’s model codes; CFR citations refer to the Code of Federal Regulations. We checked the wording against the sources linked above; code adoptions cited there reproduce the model text without amendment unless the source notes a state amendment. Codes take effect only when a state or local government adopts them, and many make amendments. This guide is general information, not legal or engineering advice. Suggest a correction