Quick answer
Every ADU needs permits. A unit with its own kitchen, bathroom, and sleeping space is a dwelling unit, and no model code exemption covers it. Expect two layers of approval. Zoning decides whether an ADU is allowed on your lot, along with its size, height, setbacks, parking, and owner-occupancy rules, and a growing number of state laws limit what cities can require. The building code then governs construction, fire safety, and utilities. The 2024 International Residential Code has an optional ADU appendix (Appendix BC) that applies only where adopted. Utilities, septic approval, and impact fees are often separate steps.
What an ADU is, and why permits are more involved
An accessory dwelling unit, also called a granny flat, accessory apartment, in-law suite, backyard cottage, or second unit, is a complete, independent home on the same lot as a main house. HUD’s case study on ADUs described them as “an inexpensive way to increase their housing supply” for communities facing housing shortages.
ADUs come in three common forms:
- Detached: a separate small house or a unit over a detached garage.
- Attached: an addition to the main house with its own entrance.
- Interior or conversion: a basement, attic, or garage converted into a unit.
Because an ADU is a dwelling, none of the model code’s permit exemptions apply. The International Residential Code’s exemption for small accessory buildings (R105.2) covers only one-story detached structures up to 200 square feet that are used as accessory structures, not as places to live. See our shed permit guide.
What the model code says
Construction of an ADU is regulated like any other house or addition: foundations, framing, fire safety, egress, insulation and energy, plumbing, mechanical, and electrical. Specific points that come up with ADUs:
- The 2024 IRC ADU appendix. ICC’s 2024 IRC includes Appendix BC, which “provides for the design and construction of accessory dwelling units (ADUs), an alternative to two- and multiple-family residential construction that promotes increased housing supply and affordability.” Appendices are optional and take effect only if your state or local government adopts them, so ask whether yours has.
- Tiny houses. Appendix BB of the 2024 IRC gives relaxed provisions “for dwelling units that are 400 square feet (37 m2) or less in floor area, excluding lofts,” mainly for loft ceiling heights and compact stairs and ladders. It is also optional.
- Fire separation. An attached or interior ADU may need fire-resistant separation from the main house. How much depends on whether your jurisdiction treats the pair as one dwelling with an accessory unit or as a two-family dwelling, which is a key reason to confirm early which provisions apply.
- Egress, smoke and CO alarms, and energy. Bedrooms need emergency escape openings, and the unit needs its own alarms and must meet the energy code for new or converted space.
- Utilities. Separate or shared water, sewer, gas, and electrical services, sized for two households. Utility providers may have their own connection rules and fees.
Zoning and state ADU laws
Zoning is usually the first and biggest hurdle. Local ordinances commonly regulate:
- where ADUs are allowed (zoning districts, lot size);
- size (maximum floor area, or a percentage of the main house);
- height and setbacks;
- parking;
- owner occupancy;
- short-term rental restrictions;
- design standards and number of units per lot.
A growing number of states limit how strict these local rules can be. Examples we verified in state statutes:
| State | Rule (summary) | Source |
|---|---|---|
| Washington | Cities and counties covered by RCW 36.70A.681 must allow at least two ADUs on lots in urban growth areas that allow single-family homes, may not require owner occupancy, may not set a maximum floor area below 1,000 sq ft, and may not cap ADU roof height below 24 feet, with exceptions | RCW 36.70A.681 |
| Montana | Municipalities must allow at least one ADU by right on a lot with a single-family home. An ADU may be up to 75% of the main home’s floor area or 1,000 sq ft, whichever is less | MCA 76-2-345 |
| Maine | Municipalities must allow at least one ADU on lots with a single-family, 2-unit, or 3-unit residential structure where residential uses are permitted. ADUs on septic need proof of adequate sewage disposal | 30-A M.R.S. §4364-B |
These laws have scope limits and exceptions, so read the statute and your local ordinance together. Where our state research covers ADU rules, they appear in the state notes below.
HOAs may have covenants on additional units or rentals. Check whether your state’s ADU law addresses private covenants.
Permits and inspections you can expect
- Pre-application or zoning check. Confirm that an ADU is allowed and which standards apply. Many cities publish ADU checklists.
- Zoning or planning approval, sometimes administrative, sometimes with notice to neighbors, depending on state law and local rules.
- Building permit plan review of architectural, structural, and energy documents.
- Trade permits for electrical, plumbing, and mechanical work, and often gas.
- Utility and septic approvals: water and sewer connections, or a health department permit for septic changes.
- Inspections throughout construction: foundation, framing, rough trades, insulation, and final.
- Certificate of occupancy or final approval before anyone moves in.
- Address assignment for the new unit, often through the county or city addressing office.
What to prepare
- Site plan showing both units, setbacks, parking, utilities, easements, and septic components.
- Floor plans and elevations, including egress windows and heights.
- Structural and energy compliance documents.
- Utility plan: meter strategy, panel capacity, and water and sewer connections.
- Septic evaluation if not on public sewer.
- Ownership and occupancy documents if your jurisdiction requires a covenant or affidavit.
- HOA review if covenants apply.
How permit fees are calculated
ADU costs often include several government fees, each set locally:
- Building permit and plan review fees, commonly based on valuation or square footage. Jurisdictions often benchmark valuation against the International Code Council’s Building Valuation Data. The 2024 IRC’s optional Appendix AB “provides guidance to jurisdictions for setting appropriate permit fees.”
- Trade permit fees for electrical, plumbing, and mechanical work.
- Zoning or planning application fees.
- Impact, capacity, or connection fees for water, sewer, schools, parks, or transportation. These can be among the largest items.
- Septic permit fees from the health department.
Ask your permit office and utility providers for fee estimates early.
Common mistakes
- Designing before checking zoning, then finding out the lot is too small, the height is too great, or parking is required.
- Assuming a shed or garage can become living space without a change-of-use permit.
- Underestimating utilities: panel upgrades, sewer laterals, and septic capacity.
- Forgetting fire separation for attached and interior units.
- Renting before final approval, or using the unit as a short-term rental where it’s prohibited.
- Missing impact or connection fees in the budget.
State notes
Some states set a rule for this project statewide. These notes come from our state research; your city or county may add its own requirements.
- Arizona
- Cities and towns with more than 75,000 people must allow at least one attached and one detached accessory dwelling unit wherever a single-family home is allowed, and must allow an ADU of 75 percent of the home's floor area or 1,000 square feet, whichever is less. They cannot require extra parking, matching design, or side or rear setbacks over five feet, and cannot require a commercial building code or fire sprinklers for an ADU. Source
- California
- State ADU law limits how cities and counties can regulate ADUs and junior ADUs. Local ADU ordinances must follow Government Code section 66314 (section 66333 for JADUs) and must not unduly restrict ADUs. In the coastal zone, the local government must approve or deny the ADU's coastal development permit within 60 days of a complete application, without a public hearing. Source
- Colorado
- Under HB24-1152, since June 30, 2025, subject jurisdictions (municipalities of 1,000 or more in a metropolitan planning organization area, and county areas within large census designated places in such an area) must allow one ADU wherever single-unit detached homes are allowed, through administrative approval only. Source
- Maine
- Under 30-A M.R.S. §4364-B, a municipality must allow at least one accessory dwelling unit on a lot with a single-family home, wherever residential use is allowed; the statute as amended in 2025 also covers 2- and 3-unit buildings. The ADU can't be subject to extra parking requirements, and the owner doesn't have to live on the lot. Its minimum size is 190 square feet. Shoreland zoning still applies, and the owner must give the town written verification of adequate water and wastewater service before occupancy. Source
- Massachusetts
- Under M.G.L. c. 40A, s. 3 (Affordable Homes Act, in effect February 2, 2025) and 760 CMR 71.00, one ADU of up to 900 sq ft or half the main home's floor area, whichever is smaller, is allowed by right in single-family zoning districts. A town cannot require a special permit, owner occupancy, or more than one parking space (none within 0.5 mile of transit). A building permit is still required. Source
- Montana
- MCA 76-2-345 (2023): cities, towns and consolidated city-counties that zone must allow at least one ADU by right on any lot with a single-family home. The ADU may be attached, detached or internal. An attached or detached ADU can be capped at the smaller of 75% of the home's floor area or 1,000 sq ft. The city may not require extra parking, owner occupancy, matching design, impact fees, a family relationship between occupants, or setbacks and height limits stricter than for the house. The application fee is capped at $250 per unit plus usual building fees, and the city may require water and sewer will-serve letters. Building, fire and health codes still apply. Source
- New Hampshire
- RSA 674:71-73 as amended by HB 577 (2025, Chapter 197, effective July 1, 2025): towns must allow one ADU, attached or detached, as a matter of right in all zoning districts that allow single-family homes. The size limit is 950 sq ft unless the town allows more, and a town may not set it below 750 sq ft. A town may require the owner to live in one of the two units but cannot say which one. Parking rules can be no stricter than for single-family homes, with at most one extra space per ADU. HB 1079 (2026, Chapter 210, effective August 31, 2026) requires towns to allow conversion of structures that existed on or before July 1, 2025 into ADUs, even where they don't meet current setback or lot coverage rules. Source
- Oregon
- Cities over 2,500 and counties over 15,000 must allow at least one accessory dwelling unit (interior, attached or detached) for each detached single-family home in areas inside the urban growth boundary zoned for those homes. They may not require owner occupancy or extra off-street parking (ORS 197A.425). Source
- Utah
- An internal accessory dwelling unit is a permitted use in any area zoned primarily residential (Utah Code 10-21-303, formerly 10-9a-530). Cities cannot regulate its size, lot size, frontage or internal connection. They may prohibit a separate meter, require a rental permit, require an extra parking space, ban short-term rentals, and ban internal ADUs on lots of 6,000 sq ft or less or homes on a failing septic tank. Source
- Virginia
- Starting July 1, 2027, Va. Code § 15.2-2292.4 (2026 Acts ch. 895) treats accessory dwelling units as a permitted use in single-family zoning districts. Localities may cap the ADU permit fee at no more than $500. They may require owner occupancy of either the ADU or the main home, but not both. It does not apply in localities that adopted an ADU ordinance before January 1, 2026. Source
- Washington
- Under RCW 36.70A.680–.681, cities and counties planning under the Growth Management Act must allow two ADUs per lot in urban growth areas wherever single-family homes are allowed. They may not require owner occupancy, may not set a maximum size below 1,000 sq ft, and may not require parking within half a mile of a major transit stop. ADU impact fees are capped at 50% of the main house's. Source
Common questions
Is an ADU allowed on my lot?
That is a zoning question for your city or county, shaped by any state ADU law. Some states require local governments to allow ADUs. Washington, for example, requires the cities and counties covered by its ADU law to allow at least two ADUs on lots in urban growth areas zoned for single-family homes. Start with your local zoning office.
Can I convert my garage or basement into an ADU?
Often, yes, but the conversion is a change of use that creates a new dwelling unit. Expect full building review, including egress, fire separation from the main house, ceiling height, insulation, and new utility work. Converting a garage may also affect required parking under local zoning.
Do I have to live on the property?
Some local rules require the owner to live in the main house or the ADU. Several states now prohibit that requirement. Washington's law, for example, says a city or county 'may not require the owner of a lot on which there is an accessory dwelling unit to reside in or occupy' a unit on the lot. Check your state and local rules.
Is a tiny house on wheels an ADU?
Usually not under the building code. Vehicles and RVs are generally regulated separately. The 2024 IRC's optional Appendix BB covers tiny houses of 400 square feet or less built as permanent dwellings. Whether a movable unit can be lived in on a lot is a local zoning question.
What if my lot is on a septic system?
The septic system must be able to handle the extra unit. EPA notes that in most states local health departments issue septic system permits. Maine's ADU law, for example, requires proof of adequate sewage disposal, verified by a local plumbing inspector, when an ADU connects to a septic system.
Check your county’s rules
The rules above are the model-code starting point. Your county or city decides which edition applies, what it changed, and what it charges. Look up the permit office that serves your address.
Sources
- 2024 International Residential Code, front matter and preface (Appendix BB tiny houses, Appendix BC ADUs, Appendix AB permit fees), ICCshop.iccsafe.org
- 2024 International Residential Code, Chapter 1 (R105.2 work exempt from permit), unamended adoption reproduced by UpCodesup.codes
- HUD User: Accessory Dwelling Units Case Study (2008)www.huduser.gov
- Washington: RCW 36.70A.681, accessory dwelling unitsapp.leg.wa.gov
- Montana: MCA 76-2-345, accessory dwelling unitsmca.legmt.gov
- Maine: 30-A M.R.S. §4364-B, accessory dwelling unitslegislature.maine.gov
- U.S. EPA: Frequent questions on septic systemswww.epa.gov
Last reviewed October 2026. Section numbers refer to the International Code Council’s model codes. We checked the wording against the published adoptions linked above, which reproduce the model text without amendment unless the source notes a state amendment. Codes take effect only when a state or local government adopts them, and many make amendments. This guide is general information, not legal or engineering advice. Suggest a correction