New Hampshire building permits
New Hampshire has one State Building Code (RSA 155-A), and it applies to every building in the state. Permits and inspections, however, come from your town or city, and only if it has set up a local enforcement program. Some small towns have no building inspector, so they issue no building permits, though the code still applies to the work. On July 1, 2026 the state code moved to the 2024 International Codes and the 2023 National Electrical Code. The few unincorporated places in the far north are zoned and permitted by Coos County.
- Local profiles
- 10
- Link an online portal
- 0 (0%)
- City or town offices
- 10
How permits work in New Hampshire
Building codes
Statewide code
The State Building Code is defined in RSA 155-A:1, IV. It is a set of model codes plus amendments approved by the state Building Code Review Board and ratified by the Legislature. HB 1159 (2026), Chapter 49, took effect July 1, 2026 and updated the code to these editions: International Residential Code 2024, International Building Code 2024, International Existing Building Code 2024, International Plumbing Code 2024, International Mechanical Code 2024 and International Swimming Pool and Spa Code 2024, each with New Hampshire amendments approved through October 10, 2025. It also includes the 2023 National Electrical Code (in force since July 1, 2025 under HB 134, Chapter 135) and the 2018 International Energy Conservation Code, which was not updated. Town building departments, such as Bow's, describe a six-month concurrence period from July 1 to December 31, 2026, when applicants may use either the 2021 or the 2024 codes. From January 1, 2027, all permit applications must follow the 2024 codes. Under HB 428 (2025), Chapter 276, effective July 1, 2026, towns that enforce the code may not change its technical requirements. They may only adopt administrative, permit and fee provisions that are no less stringent than the state code. The State Fire Code (NFPA 1 and NFPA 101, 2021 editions) is a separate code adopted by the State Fire Marshal's office.
Outside city limits
Almost all of New Hampshire is divided into incorporated towns and cities, and counties do not issue building permits there. Whether you need a building permit depends on whether your town has a code enforcement program. Towns that have one issue permits and inspect, through their own building official or, since July 1, 2026, a contracted local enforcement agency or qualified third party. Towns without one issue no building permits, but the state code still applies. The State Fire Marshal may step in to enforce the building and fire codes there, but only when the municipality asks in writing. In those towns, contractors must notify the Fire Marshal of the type of construction before starting work, except on one- and two-family homes. The unincorporated places in Coos County, such as Dixville, Millsfield, Success, Cambridge, Second College Grant and Bean's Purchase, are governed by the Coos County Planning Board. Its zoning ordinance makes it unlawful to build, reconstruct or alter a structure, or add a dwelling unit, without a county zoning permit. Water supply and sewage plans, with any required state approvals, must be included with the application.
Contractors and owner-builders
New Hampshire has no state license for general contractors, builders, remodelers or home improvement contractors. Any local requirement comes from your town. The state does license electricians and plumbers through the Office of Professional Licensing and Certification (OPLC). For electrical and plumbing work, state law has specific homeowner exceptions. Under RSA 319-C:15, II, a homeowner may do electrical work in or about a single-family residence they own and occupy, or will occupy, as their own home. Under RSA 329-A:13, III, a property owner may do plumbing in their own single-family detached or townhouse residence, including new construction. Towns typically require a signed homeowner affidavit, and the work must still meet the code and pass inspection. These exceptions do not cover rental property or multi-family buildings, or anyone paid to do the work.
New Hampshire Office of Professional Licensing and Certification (OPLC) · Look up a license
Electrical, plumbing, and HVAC
Electricians are licensed under RSA 319-C by the Electricians' Board, and plumbers under RSA 329-A. Both boards are administered by OPLC. Doing electrical or plumbing work for pay without a license is unlawful. For homes, electrical and plumbing permits and inspections are handled by your town's building department, where one exists. Homeowners working on their own owner-occupied single-family home may do their own electrical and plumbing work. Town permit forms make clear that if you later hire an electrician, a new permit application with the electrician's license information is needed. Check with your town about fuel gas work. Gas fitting is licensed separately, and homeowner rules for it differ.
State programs that can affect your permit
- NHDES Shoreland Water Quality Protection Act
Land within 250 feet of the reference line of protected waters falls under state shoreland rules. That includes lakes and ponds over 10 acres, fourth-order and larger streams, designated rivers and tidal waters. The rules set a 50-foot primary building setback, a 50-foot waterfront buffer, a 150-foot natural woodland buffer and impervious-surface limits. Covering more than 20% of the lot requires a stormwater plan. Most construction, excavation or filling in this zone needs a shoreland permit from NHDES. Small projects, under 1,500 sq ft of total impact and no more than 900 sq ft of new impervious area, may qualify for a quicker permit-by-notification. The source is a presentation by an NHDES Shoreland Specialist. NHDES's shoreland line is (603) 271-3501.
- State septic (subsurface system) approval
New or replacement septic systems are designed and approved through the NHDES Subsurface Systems Bureau, not the town. The Coos County zoning ordinance, for example, requires state approvals for sewage disposal to be attached to a zoning permit application, and many towns ask for the state approval before they issue a building permit. NHDES's subsurface questions line is (603) 271-3501.
- State Fire Marshal backup enforcement
From July 1, 2026, under HB 428 (Chapter 276), the State Fire Marshal or a designee may enforce the state building and fire codes in a municipality with no local enforcement agency and no third-party contract. This happens only at the municipality's written request. In towns with no enforcement program, contractors must notify the Fire Marshal of the type of construction before work begins, except on one- and two-family homes.
New Hampshire county directory
10 local profiles
Most profiles point to city or town offices; other listing types are labeled.
B
C
G
H
M
R
S
Profiles marked “City or town offices” point to municipal permit offices because the county does not issue general building permits.
Statewide rules for common projects
Accessory dwelling units
RSA 674:71-73 as amended by HB 577 (2025, Chapter 197, effective July 1, 2025): towns must allow one ADU, attached or detached, as a matter of right in all zoning districts that allow single-family homes. The size limit is 950 sq ft unless the town allows more, and a town may not set it below 750 sq ft. A town may require the owner to live in one of the two units but cannot say which one. Parking rules can be no stricter than for single-family homes, with at most one extra space per ADU. HB 1079 (2026, Chapter 210, effective August 31, 2026) requires towns to allow conversion of structures that existed on or before July 1, 2025 into ADUs, even where they don't meet current setback or lot coverage rules.
New Hampshire permit questions
My town doesn't have a building inspector. Do I need a permit?
If your town has no code enforcement program, it does not issue building permits. The State Building Code still applies to your project, and the town's zoning rules, state septic approval and any shoreland or wetlands permits from NHDES still apply. The State Fire Marshal handles enforcement in such towns only if the town asks in writing. Contractors must notify the Fire Marshal before work starts, except on one- and two-family homes. Ask your select board office what the town requires before you start.
Which building code edition applies to my project right now?
The 2024 International Residential and Building Codes, with New Hampshire amendments, became the state code on July 1, 2026. The 2023 National Electrical Code has applied since July 1, 2025, and the energy code is still the 2018 IECC. Town building departments describe a concurrence period through December 31, 2026, when you may apply under either the 2021 or 2024 codes. From January 1, 2027, applications must follow the 2024 codes. Your building official can confirm which edition your application will be reviewed under.
Can I do my own electrical or plumbing work in New Hampshire?
Yes, on a single-family home you own and live in, or will live in. The electrical licensing law (RSA 319-C:15, II) and the plumbing licensing law (RSA 329-A:13, III) both have homeowner exceptions. You still need the town's permit where one is required, usually with a signed homeowner affidavit, and the work must pass inspection. The exceptions don't cover rentals or multi-family buildings, and anyone you pay to do the work must be licensed.
Can I build an accessory dwelling unit (ADU) on my lot?
Usually, yes. Under HB 577 (2025), effective July 1, 2025, every town that allows single-family homes must allow one ADU, attached or detached, as a matter of right. Towns can't cap ADU size below 750 sq ft, and the default limit is 950 sq ft unless the town allows more. HB 1079 (2026), effective August 31, 2026, also requires towns to allow ADUs in structures existing on or before July 1, 2025, such as detached garages, even if those structures don't meet current setback or lot coverage rules. You still need building and septic approvals.
I live on a lake. What extra permits might I need?
If your work is within 250 feet of a protected lake, pond, river or tidal water, the state shoreland rules apply on top of your town's permit. Most construction, excavation or filling there needs an NHDES shoreland permit, and small projects may qualify for permit-by-notification. There are limits on cutting vegetation within 150 feet and on impervious surfaces such as roofs, decks, patios and driveways. A new or replacement septic system also needs NHDES approval.
Permit guides for common projects
What the model codes say, what local offices often change and what to ask; read them with the New Hampshire rules above.
- How to get a building permit
- Building permit costs
- Looking up permit records
- Work done without a permit
- Decks
- Fences
- Sheds and accessory buildings
- Roof replacement
- Water heaters
- Heating and air conditioning
- Electrical work
- Rooftop solar
- Pools and spas
- Accessory dwelling units
- Plumbing work
- Kitchen and bathroom remodels
- Demolition
- Septic systems
- Driveways and culverts
- Floodplain development
- Home additions and garages
- Window and door replacement
- Generators and EV chargers
- Manufactured and mobile homes
- Owner-builder permits
Sources
- HB 1159 (2026), Chapter 49, final version: State Building Code updated to 2024 editions, effective July 1, 2026 (bill text mirror)bills.nhliberty.org
- HB 1159 (2026) bill detail and statusbills.nhliberty.org
- HB 1159 (2026): Citizens Count bill statuswww.citizenscount.org
- HB 134 (2025), Chapter 135: 2023 National Electrical Code, effective July 1, 2025bills.nhliberty.org
- Town of Bow Building & Code Enforcement: State Building Code effective July 1, 2026bownh.gov
- City of Portsmouth: NH Building Code and Fire Code Updates (2024)www.portsmouthnh.gov
- City of Portsmouth: Amended NH State Fire and Building Codeswww.portsmouthnh.gov
- HB 428 (2025), Chapter 276: local enforcement and State Fire Marshal authority, effective July 1, 2026bills.nhliberty.org
- Coos County Unincorporated Places Zoning Ordinance (amended 3/18/2024)cms3.revize.com
- Town of Meredith: Homeowner Self-Installation, Electrical and Plumbing (RSA 319-C:15, II; RSA 329-A:13, III)www.meredithnh.gov
- Town of Ashland: Electrical permit applicationashland.nh.gov
- Town of Ashland: Plumbing permit applicationashland.nh.gov
- HB 577 (2025), Chapter 197: accessory dwelling unitsbills.nhliberty.org
- HB 1079 (2026), Chapter 210: ADUs in existing structuresbills.nhliberty.org
- NHDES Shoreland Specialist presentation: Introduction to Protected Shoreland (NH LAKES)nhlakes.org
- NH Office of Professional Licensing and Certification: License Lookupoplc.nh.gov
Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction