Who issues permits

No countywide building permit office was identified for Coos County. The listing points to Local municipality building official. Inside city or town limits, the city or town issues building permits.

Also listed: New Hampshire State Building Code baseline.

Outside city limits in New Hampshire

Almost all of New Hampshire is divided into incorporated towns and cities, and counties do not issue building permits there. Whether you need a building permit depends on whether your town has a code enforcement program.

Read more

Towns that have one issue permits and inspect, through their own building official or, since July 1, 2026, a contracted local enforcement agency or qualified third party. Towns without one issue no building permits, but the state code still applies. The State Fire Marshal may step in to enforce the building and fire codes there, but only when the municipality asks in writing. In those towns, contractors must notify the Fire Marshal of the type of construction before starting work, except on one- and two-family homes. The unincorporated places in Coos County, such as Dixville, Millsfield, Success, Cambridge, Second College Grant and Bean's Purchase, are governed by the Coos County Planning Board. Its zoning ordinance makes it unlawful to build, reconstruct or alter a structure, or add a dwelling unit, without a county zoning permit. Water supply and sewage plans, with any required state approvals, must be included with the application.

More New Hampshire rules below · Confirm with the office before you build.

How to get a permit in Coos County

  1. Find the office for your address: the city or town if you are inside its limits; outside them, the New Hampshire rule above decides.
  2. Request the application from the office; no form or portal is published online.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  5. Get the final approval and keep it with the approved plans and receipts.

Search Coos County permit records

No online permit portal is listed, so permit history is kept by Local municipality building official. Contact the office with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

Inside a city or town, permit records are kept by that municipality’s building department, not by Coos County.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Building codes and exemptions

Codes referenced

New Hampshire state baseline under RSA 155-A: 2021 IBC, IEBC, IPC, IMC, ISPSC, and IRC; 2018 IECC; 2023 NEC; and state-approved amendments. Local permitting and enforcement are municipality-specific.

New Hampshire: statewide code. Details

Scheduling inspections

Contact the town or city building official for the property location. Under RSA 155-A, local enforcement agencies handle plan review, permit issuance, inspections, and occupancy; where no local mechanism exists, the state fire marshal may enforce on written municipal request.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

RSA 155-A:8 adopts the Title LXIV remedies in RSA 676:15 and RSA 676:17 for state-building-code violations; local municipalities control the practical enforcement process and any additional remedies.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office about:

  • Fees: the current fee schedule and an estimate for your project.
  • Exempt work: which minor work needs no permit. Not available at county level; individual municipalities determine local exemptions and any additional requirements consistent with the state code.
  • Review times: how long plan review currently takes. Municipality-specific.

New Hampshire rules that apply in Coos County

These rules come from New Hampshire law and state agencies, so they apply in Coos County on top of anything the local office requires.

Building code

Statewide code

The State Building Code is defined in RSA 155-A:1, IV. It is a set of model codes plus amendments approved by the state Building Code Review Board and ratified by the Legislature. HB 1159 (2026), Chapter 49, took effect July 1, 2026 and updated the code to these editions: International Residential Code 2024, International Building Code 2024, International Existing Building Code 2024, International Plumbing Code 2024, International Mechanical Code 2024 and International Swimming Pool and Spa Code 2024, each with New Hampshire amendments approved through October 10, 2025.

Read more

It also includes the 2023 National Electrical Code (in force since July 1, 2025 under HB 134, Chapter 135) and the 2018 International Energy Conservation Code, which was not updated. Town building departments, such as Bow's, describe a six-month concurrence period from July 1 to December 31, 2026, when applicants may use either the 2021 or the 2024 codes. From January 1, 2027, all permit applications must follow the 2024 codes. Under HB 428 (2025), Chapter 276, effective July 1, 2026, towns that enforce the code may not change its technical requirements. They may only adopt administrative, permit and fee provisions that are no less stringent than the state code. The State Fire Code (NFPA 1 and NFPA 101, 2021 editions) is a separate code adopted by the State Fire Marshal's office.

New Hampshire Building Code Review Board, Department of Safety, Division of Fire Safety (State Fire Marshal's Office) ↗

Contractor and trade licensing

New Hampshire has no state license for general contractors, builders, remodelers or home improvement contractors. Any local requirement comes from your town. The state does license electricians and plumbers through the Office of Professional Licensing and Certification (OPLC).

Read more

For electrical and plumbing work, state law has specific homeowner exceptions. Under RSA 319-C:15, II, a homeowner may do electrical work in or about a single-family residence they own and occupy, or will occupy, as their own home. Under RSA 329-A:13, III, a property owner may do plumbing in their own single-family detached or townhouse residence, including new construction. Towns typically require a signed homeowner affidavit, and the work must still meet the code and pass inspection. These exceptions do not cover rental property or multi-family buildings, or anyone paid to do the work.

Electrical, plumbing and HVAC

Electricians are licensed under RSA 319-C by the Electricians' Board, and plumbers under RSA 329-A. Both boards are administered by OPLC. Doing electrical or plumbing work for pay without a license is unlawful.

Read more

For homes, electrical and plumbing permits and inspections are handled by your town's building department, where one exists. Homeowners working on their own owner-occupied single-family home may do their own electrical and plumbing work. Town permit forms make clear that if you later hire an electrician, a new permit application with the electrician's license information is needed. Check with your town about fuel gas work. Gas fitting is licensed separately, and homeowner rules for it differ.

State programs that can affect your permit

NHDES Shoreland Water Quality Protection Act

Land within 250 feet of the reference line of protected waters falls under state shoreland rules. That includes lakes and ponds over 10 acres, fourth-order and larger streams, designated rivers and tidal waters. The rules set a 50-foot primary building setback, a 50-foot waterfront buffer, a 150-foot natural woodland buffer and impervious-surface limits. Covering more than 20% of the lot requires a stormwater plan. Most construction, excavation or filling in this zone needs a shoreland permit from NHDES. Small projects, under 1,500 sq ft of total impact and no more than 900 sq ft of new impervious area, may qualify for a quicker permit-by-notification. The source is a presentation by an NHDES Shoreland Specialist. NHDES's shoreland line is (603) 271-3501.

Official page: nhlakes.org ↗

State septic (subsurface system) approval

New or replacement septic systems are designed and approved through the NHDES Subsurface Systems Bureau, not the town. The Coos County zoning ordinance, for example, requires state approvals for sewage disposal to be attached to a zoning permit application, and many towns ask for the state approval before they issue a building permit. NHDES's subsurface questions line is (603) 271-3501.

Official page: cms3.revize.com ↗

State Fire Marshal backup enforcement

From July 1, 2026, under HB 428 (Chapter 276), the State Fire Marshal or a designee may enforce the state building and fire codes in a municipality with no local enforcement agency and no third-party contract. This happens only at the municipality's written request. In towns with no enforcement program, contractors must notify the Fire Marshal of the type of construction before work begins, except on one- and two-family homes.

Official page: bills.nhliberty.org ↗

Verified October 28, 2026 against New Hampshire sources. New Hampshire permit rules, sources and other counties

Common projects in Coos County

New Hampshire has statewide rules on file for 1 of these projects; they apply in Coos County along with local permit requirements.

  • Accessory dwelling units

    RSA 674:71-73 as amended by HB 577 (2025, Chapter 197, effective July 1, 2025): towns must allow one ADU, attached or detached, as a matter of right in all zoning districts that allow single-family homes.

    Read more

    The size limit is 950 sq ft unless the town allows more, and a town may not set it below 750 sq ft. A town may require the owner to live in one of the two units but cannot say which one. Parking rules can be no stricter than for single-family homes, with at most one extra space per ADU. HB 1079 (2026, Chapter 210, effective August 31, 2026) requires towns to allow conversion of structures that existed on or before July 1, 2025 into ADUs, even where they don't meet current setback or lot coverage rules.

    New Hampshire source: bills.nhliberty.org ↗ · Accessory dwelling units permit guide

Guides for other projects: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Electrical work · Rooftop solar · All 21 project guides

Other permits you may need in Coos County

These are separate from the building permit and come from the agencies named, under New Hampshire rules.

  • Septic system

    NH Department of Environmental Services (NHDES), Subsurface Systems Bureau

    No septic system may be built until NHDES approves its plans and specifications, which are generally prepared by a state-permitted designer, though a homeowner may design a small system for their own home (Env-Wq 1003).

    Read more

    The installed system cannot be covered or used until NHDES or its authorized agent gives final inspection and approval (Env-Wq 1004.07). Before a purchase and sale agreement is signed for developed waterfront property, the owner must have a site assessment study done by a permitted designer (RSA 485-A:39, Env-Wq 1025).

    Official page: law.cornell.edu ↗ · Septic permit guide

  • Floodplain development

    NH Office of Planning and Development (OPD), Department of Business and Economic Affairs

    OPD administers the National Flood Insurance Program in New Hampshire. Participating municipalities adopt and enforce a floodplain management ordinance, so building in a special flood hazard area goes through the town's permit process. The NH State Building Code also has flood area requirements, some of which exceed NFIP minimums.

    Official page: nheconomy.com ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Erosion and sediment control

    NHDES (Alteration of Terrain); U.S. EPA (construction stormwater)

    An NHDES Alteration of Terrain permit is required for earth moving that disturbs more than 100,000 square feet of contiguous area over 10 years, or more than 50,000 square feet if any part is in the protected shoreland, with a lower trigger for steep areas near surface water in the shoreland (Env-Wq 1502.58).

    Read more

    New Hampshire is not authorized to run the NPDES program, so construction that disturbs 1 acre or more, or is part of a larger common plan, needs coverage under EPA's Construction General Permit.

    Official page: law.cornell.edu ↗

  • Water well

    NH Water Well Board (NHDES)

    Wells are built by licensed water well contractors, who sign a well completion report for each new well. The report must be filed with the NH Water Well Board no later than 90 days after the well is completed (We 801.03).

    Official page: law.cornell.edu ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does Coos County have a countywide building permit office?

No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, New Hampshire law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.

Can I apply for a permit online in Coos County?

No online permit portal was found for this listing. Contact the office to ask how applications are accepted.

How much does a building permit cost in Coos County?

Local municipality building official has no fee schedule online, so the cost has to come from the office. Call the office with the project type, size and estimated value for a quote. Inside a city or town, that municipality’s own fee schedule applies.

How do I look up past permits for an address in Coos County?

There is no online permit search for this listing. Ask the office for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in Coos County?

Yes, at oplc.nh.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

Which building code edition is cited for Coos County?

The published code information cites the 2021 International Building Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.

What if my property is near the Coos County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Coos County borders Carroll County, Grafton County, Oxford County (Maine), Essex County (Vermont).

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Coos County.