Maine building permits
Maine has one statewide building code, the Maine Uniform Building and Energy Code (MUBEC), and it legally applies to building work everywhere in the state. Only towns and cities with more than 4,000 residents are required to enforce it, though. In smaller towns enforcement is optional, and where a town does not enforce the code, meeting it is the owner's responsibility. Plumbing and septic permits come from a local plumbing inspector in every municipality. Electrical permits and inspections are handled by the state Electricians' Examining Board, and in the unorganized territories the Land Use Planning Commission (LUPC) issues the building permit.
- Local profiles
- 16
- Link an online portal
- 0 (0%)
- City or town offices
- 10
- State agency
- 6
How permits work in Maine
Building codes
Statewide code
MUBEC adopts the 2021 International Residential Code, 2021 International Building Code, 2021 International Existing Building Code, 2021 International Energy Conservation Code and 2021 International Mechanical Code, each with Maine amendments. It also adopts the 2019 editions of ASHRAE 62.1, 62.2 and 90.1 and the ASTM E1465 radon standard. These editions replaced the 2015 codes on April 7, 2025. Under the 2021 adoption, new one- and two-family homes must include radon mitigation systems. State law requires each adopted code to be the most recent edition or the one before it. Board minutes from July 2026 show the Technical Building Codes and Standards Board working on interim amendments, not a move to the 2024 codes. The code covers all buildings constructed or renovated in Maine, whatever the town's size. Enforcement is required only in municipalities with more than 4,000 residents; smaller towns may choose to enforce it, and they may not enforce any other building code. State law lists some exemptions: log homes, manufactured housing, post-and-beam or timber-frame construction, buildings that house livestock or store or grow crops, and buildings used mainly to process or store maple sap or syrup. A municipality may adopt the MUBEC Stretch Code, a stricter energy code; Portland, South Portland and Freeport have done so. The plumbing code is separate (the 2021 Uniform Plumbing Code), and so is the electrical code (the 2026 NEC).
Outside city limits
In Maine, the unincorporated areas are the unorganized and deorganized territories, which have no town government. The Land Use Planning Commission (LUPC), part of the Department of Agriculture, Conservation and Forestry, acts as the planning and zoning authority. Building a new house or camp there, or expanding a residence, generally requires an LUPC building permit; accessory structures that meet LUPC standards are the exception. That permit reviews land use, such as lot coverage, land division history and foundations. If a new or expanded septic system is needed, a signed HHE-200 septic design must be filed with the application. State law gives the duty to enforce MUBEC only to municipalities, and LUPC's permit guidance does not describe building-code inspections. Because no town enforces it there, plan on the owner being responsible for meeting the code, which still applies; a certified third-party inspector can check the work. Electrical rules are the same as anywhere else in Maine: the state Electricians' Examining Board issues permits and its inspectors do the inspections. In organized towns of 4,000 or fewer residents that have chosen not to enforce MUBEC, the town still handles zoning, shoreland and plumbing permits. In those towns no one inspects for the building code unless the owner hires a state-certified third-party inspector.
Contractors and owner-builders
Maine does not license or regulate general contractors, home builders or remodelers. The state licenses specific trades instead: electricians, plumbers, and oil, solid fuel, propane and natural gas technicians. Homeowners are protected mainly by the home construction contract law (10 M.R.S. §1487). Any home construction contract for more than $3,000 in materials or labor must be in writing and signed by both parties, and the down payment may be no more than one-third of the price. The contract must also include a statutory warranty and dispute-resolution options. Owner-builders can do much of their own work. MUBEC does not require a contractor license. A person may do their own plumbing and their own fuel-burning heating installations in a single-family home they occupy or will occupy as their own residence. Electrical work by an owner is allowed in an existing single-family home they own and occupy, or in a newly built one with a state single-family dwelling certificate and inspection. Local permits for building, zoning and shoreland work are issued to property owners by the town.
Maine Office of the Attorney General (home construction contracts); Office of Professional and Occupational Regulation (trade licenses) · Look up a license
Electrical, plumbing, and HVAC
Electrical: the Electricians' Examining Board licenses electricians and adopts the electrical code. Electrical installations that start on or after July 1, 2026 must meet the 2026 National Electrical Code under the board's Chapter 120. Under 32 M.R.S. §1102-C, an electrical permit from the board is generally required, applied for online by a licensed master or limited electrician. An inspection is required before wiring is covered, and the utility must see proof of the permit before it connects power. Several kinds of work don't need a board permit: work in a single-family home by a licensed electrician; work by an owner in an existing single-family home they own and occupy (added in 2025); minor repairs; and work in a town that requires its own electrical permit by ordinance. An owner wiring a newly built single-family home they will live in must get a single-family dwelling certificate. The owner must also contact the state electrical inspector before starting and have the work inspected before it is enclosed (32 M.R.S. §1102-D). Plumbing: the Plumbers' Examining Board licenses plumbers and adopts the plumbing code, which is the 2021 Uniform Plumbing Code with Maine amendments. Every municipality must appoint a certified local plumbing inspector, who issues plumbing and septic permits and inspects the work. A plumbing license is not required for work in a single-family home you occupy or will occupy as your residence. Minor plumbing done by the owner inside their own home needs no permit or inspection. Heating fuels: the Maine Fuel Board licenses oil and solid fuel burner technicians and propane and natural gas technicians. An owner may install oil, solid fuel, propane or natural gas burning equipment in a single-family home they occupy or will occupy, as long as the work meets board standards.
State programs that can affect your permit
- MUBEC third-party inspectors
The Maine Office of Community Affairs certifies third-party inspectors (TPIs), who can review plans and inspect construction for MUBEC compliance. Towns of 4,000 or fewer residents don't have to enforce the code, so in those towns an owner can hire a TPI to confirm a new home or addition meets it. Towns that must enforce the code can rely on TPI reports, and if such a town has not set up another inspection method, the applicant must hire a TPI. TPIs can be found in the state's online license search under the Office of Community Affairs.
- Subsurface wastewater (septic) program
Maine CDC's Subsurface Wastewater Unit writes the Subsurface Wastewater Disposal Rules (10-144 CMR Chapter 241); the current rules took effect September 23, 2023. A permit is required to install a new, expanded or replacement septic system. Replacement septic tanks are an exception: they need a permit but no site evaluation. A licensed site evaluator prepares the design on form HHE-200, and the local plumbing inspector issues the permit. The system must pass two inspections: one at site preparation and one before final backfilling.
- Mandatory shoreland zoning
Under the Mandatory Shoreland Zoning Act (38 M.R.S. §§435-449), every municipality enforces a shoreland zoning ordinance. The zone covers land within 250 feet of great ponds, rivers, coastal wetlands and certain freshwater wetlands, and within 75 feet of certain streams. Each town's ordinance sets which activities need approval, and the local code enforcement officer is the first contact, with help from the Department of Environmental Protection's Shoreland Zoning Unit.
- Land Use Planning Commission (unorganized territories)
LUPC is the planning and zoning authority for Maine's unorganized and deorganized areas. It issues building permits for new houses, camps and residential expansions, and the application includes septic paperwork when a new or expanded system is needed.
Maine county directory
16 local profiles
Most profiles point to city or town offices; other listing types are labeled.
A
C
F
H
K
L
O
P
S
W
Y
Profiles marked “City or town offices” point to municipal permit offices because the county does not issue general building permits. Profiles marked “State agency” point to a state program that handles permits or oversight there.
Statewide rules for common projects
Electrical work
State law requires an Electricians' Examining Board permit for electrical installations, but there are exceptions. No board permit is needed for work in a single-family home by a licensed electrician, for work by an owner in an existing single-family home they own and occupy, or for minor repairs. It is also not needed where a town requires its own electrical permit by ordinance. An owner wiring a new single-family home they will occupy needs a single-family dwelling certificate and a state inspection before the wiring is covered.
Heating and air conditioning
Installing or servicing oil, solid fuel (including pellet central heating), propane or natural gas burning equipment requires a Maine Fuel Board license. The exception is an owner working in a single-family home they occupy or will occupy, as long as the work meets board standards. Freestanding wood stoves and room heaters not connected to a central heating system are outside the licensing law.
Accessory dwelling units
Under 30-A M.R.S. §4364-B, a municipality must allow at least one accessory dwelling unit on a lot with a single-family home, wherever residential use is allowed; the statute as amended in 2025 also covers 2- and 3-unit buildings. The ADU can't be subject to extra parking requirements, and the owner doesn't have to live on the lot. Its minimum size is 190 square feet. Shoreland zoning still applies, and the owner must give the town written verification of adequate water and wastewater service before occupancy.
Maine permit questions
My town has fewer than 4,000 people and no building inspector. Does the building code still apply?
Yes. MUBEC applies to building construction everywhere in Maine, and the state says compliance is the building owner's responsibility whether or not the town enforces the code. Towns of 4,000 or fewer residents may choose not to enforce it. If yours doesn't, no one will inspect for the building code unless you hire a state-certified third-party inspector. You will usually still need town approvals for zoning, shoreland and plumbing, and a state electrical permit where one applies.
Which building code editions are in effect in Maine?
Since April 7, 2025, MUBEC has been based on the 2021 IRC, IBC, IEBC, IECC and IMC, with Maine amendments, plus the 2019 ASHRAE ventilation and energy standards. Plumbing follows the 2021 Uniform Plumbing Code. Electrical work that started on or after July 1, 2026 follows the 2026 National Electrical Code.
Do I need a licensed contractor to build or remodel my house in Maine?
Maine does not license general contractors or home builders. If you hire someone for a job over $3,000, state law requires a written, signed contract with specific terms, and the down payment can be no more than one-third of the price. Electricians, plumbers and heating technicians are licensed, but homeowners have exemptions in all three trades for the home they live in.
Can I do my own electrical work in Maine?
In an existing single-family home that you own and live in, you may do your own electrical work without a state permit. The work must still meet the National Electrical Code. If you are wiring a newly built single-family home that you will live in, you must get a single-family dwelling certificate from the Electricians' Examining Board. You must also contact the state electrical inspector before starting and get an inspection before the walls are closed. The utility needs proof of certification before it connects power.
I'm building a camp in an unorganized township. Who issues the permit?
The Land Use Planning Commission (LUPC) does, not a town or the county. A new house or camp, or an expansion of a residence, generally needs an LUPC building permit. If you need a septic system, include a signed HHE-200 septic design prepared by a licensed site evaluator. Electrical work there follows the same state rules as anywhere else in Maine.
Permit guides for common projects
What the model codes say, what local offices often change and what to ask; read them with the Maine rules above.
- How to get a building permit
- Building permit costs
- Looking up permit records
- Work done without a permit
- Decks
- Fences
- Sheds and accessory buildings
- Roof replacement
- Water heaters
- Heating and air conditioning
- Electrical work
- Rooftop solar
- Pools and spas
- Accessory dwelling units
- Plumbing work
- Kitchen and bathroom remodels
- Demolition
- Septic systems
- Driveways and culverts
- Floodplain development
- Home additions and garages
- Window and door replacement
- Generators and EV chargers
- Manufactured and mobile homes
- Owner-builder permits
Sources
- Maine Office of Community Affairs: Division of Building Codes and Standards (MUBEC)www11.maine.gov
- Maine Office of Community Affairs: Code Enforcement Rules (MUBEC chapters and adopted editions)www11.maine.gov
- MUBEC Rule Chapter 2: Administrative Procedures (08-003 CMR ch. 2)www1.maine.gov
- Maine Office of Community Affairs: MUBEC FAQ (April 7, 2025 update)www1.maine.gov
- Governor's Energy Office: Building and Energy Codeswww1.maine.gov
- Maine Office of Community Affairs: Third-Party Inspector Guidance (rev. Jan. 8, 2026)www11.maine.gov
- Technical Building Codes and Standards Board minutes, July 23, 2026mobile.maine.gov
- Maine Office of Community Affairs: Publications and Manuals (2021 Uniform Plumbing Code)www11.maine.gov
- 10 M.R.S. §9724: MUBEC application and enforcement thresholdlegislature.maine.gov
- 25 M.R.S. §2373: Municipal inspection optionslegislature.maine.gov
- Electricians' Examining Boardwww1.maine.gov
- 32 M.R.S. §1102-C: Electrical permits and inspectionslegislature.maine.gov
- 32 M.R.S. §1102-D: Single-family dwelling certificatelegislature.maine.gov
- 32 M.R.S. §3302: Plumbing license requirement and exceptionslegislature.maine.gov
- 30-A M.R.S. §4215: Plumbing and septic permitslegislature.maine.gov
- 30-A M.R.S. §4221: Local plumbing inspectorslegislature.maine.gov
- 32 M.R.S. §18104: Maine Fuel Board licensing exceptionslegislature.maine.gov
- Maine Attorney General: Home Construction Contractswww1.maine.gov
- 10 M.R.S. §1487: Home construction contractslegislature.maine.gov
- 30-A M.R.S. §4364-B: Accessory dwelling unitslegislature.maine.gov
- Maine CDC: Subsurface Wastewater System Permittingwww1.maine.gov
- Maine CDC: Maine Subsurface Wastewater Ruleswww1.maine.gov
- Maine DEP: Shoreland Zoningwww1.maine.gov
- Land Use Planning Commissionwww1.maine.gov
- Land Use Planning Commission: Building Permit Application helpwww1.maine.gov
Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction