County Permit SearchU.S. compliance directory
MaineFranklin County

Administrative overview · FIPS 23007

Franklin County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

State Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked State Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Maine Land Use Planning Commission (LUPC) for Franklin County unorganized/deorganized territories; municipal Code Enforcement Officers handle organized towns

For a project in or near Franklin County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(207) 287-2631 (LUPC Augusta); (207) 778-6614 (Franklin County Commissioners / unorganized territories)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

LUPC Western Regional Office, 932 U.S. Route 2 East, Wilton, ME 04294; Franklin County Commissioners Office, 120 County Way, Suite 4, Farmington, ME 04938

Operating hours

LUPC regional offices are open by appointment only; Franklin County Commissioners Office business hours are 8:30 a.m.-4:00 p.m.

Review expectation

LUPC reports significant summer 2026 permitting delays from high application volumes and backlogs; applications are considered in the order received and should be submitted well in advance.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Franklin County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact (207) 287-2631 (LUPC Augusta); (207) 778-6614 (Franklin County Commissioners / unorganized territories) and request the current application route before preparing a final submittal.

How long might review take?

LUPC reports significant summer 2026 permitting delays from high application volumes and backlogs; applications are considered in the order received and should be submitted well in advance.

How are inspections scheduled?

LUPC applications are submitted to ApplicationSubmissions.LUPC@maine.gov or by mail to 22 State House Station, Augusta, ME 04333. Contact the LUPC regional representative for pre-application assistance and site visits; LUPC requests at least 15 days' notice for a desired site visit. Organized towns schedule inspections with their municipal Code Enforcement Officer.

Which codes and exemptions should I review?

For LUPC-regulated unorganized/deorganized areas, applicable LUPC land-use standards and Maine Uniform Building and Energy Code requirements apply, including Maine amendments to the 2021 International Building Code, 2021 International Existing Building Code, 2021 International Residential Code, 2021 International Energy Conservation Code, and 2021 International Mechanical Code. Organized municipalities may add local requirements. In LUPC-regulated areas, accessory structures meeting LUPC standards may qualify for an online notification rather than the full building-permit application. New houses/camps and residential expansions generally require an LUPC permit. Municipal exemptions in organized towns must be confirmed locally.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?