Oregon building permits
Oregon has one state building code that applies the same way everywhere. It is made up of "specialty codes" adopted by the Building Codes Division (BCD), and cities and counties may not change it without state approval. Cities and counties run most building departments. Where a local government doesn't run a program or gives it up, BCD can take it over. Contractors are licensed by the Construction Contractors Board (CCB), and owners may do their own work on property they own.
- Local profiles
- 36
- Link an online portal
- 35 (97%)
- County office
- 30
- State agency
- 4
- City or town offices
- 2
How permits work in Oregon
Building codes
Statewide code
The state building code is uniform throughout Oregon (ORS 455.040). The 2026 Oregon Residential Specialty Code (ORSC) is based on the 2024 IRC and took effect October 1, 2026. Its Chapter 1 is mandatory now. For the rest, building departments must accept plans under either the 2026 or the 2023 ORSC until March 31, 2027, and the 2026 edition becomes mandatory April 1, 2027. The 2026 Oregon Electrical Specialty Code is based on the 2026 NEC and became effective and mandatory October 1, 2026, replacing the 2023 OESC (2023 NEC). The 2026 Oregon Plumbing Specialty Code is based on the 2024 Uniform Plumbing Code and took effect October 1, 2026. For other buildings, the 2025 Oregon Structural Specialty Code (2024 IBC, 2024 IFC new-construction provisions and 2024 IEBC) took effect October 1, 2025 and became mandatory April 1, 2026. So did the 2025 Oregon Mechanical Specialty Code (2024 IMC and IFGC). The code in effect when you apply for a permit governs the project.
Oregon Department of Consumer and Business Services, Building Codes Division (BCD)
Outside city limits
The state code applies in unincorporated areas too. Counties that run a building inspection program issue permits outside city limits. Under ORS 455.148 and 455.150, a city or county that takes on a building program must run it in four-year periods. BCD can take over a program a local government abandons or can't run, and in some rural areas BCD provides building services directly. Agricultural buildings, equine facilities and dog training facilities on farms are exempt from the structural code (ORS 455.315). Incorporated cities may still regulate them.
Contractors and owner-builders
Anyone paid to build, alter, improve or repair a structure needs a CCB license with the right residential or commercial endorsement (ORS 701.021). A few exemptions apply under ORS 701.010. Casual, minor work under $1,000 is exempt if the person does not advertise as a contractor. A person may work on property they own, or on their own residence, whether or not they live in it. This does not apply if the work is part of a business of building or remodeling to sell, and not living in the structure afterward is prima facie evidence of intent to sell. An owner who hires licensed contractors is also exempt. You can still need a building permit as an owner-builder. Before you hire, check the contractor's license on the CCB website. Electrical and plumbing licenses issued by BCD can be searched in Oregon ePermitting.
Oregon Construction Contractors Board (CCB) · Look up a license
Electrical, plumbing, and HVAC
BCD and its boards license electricians and plumbers and adopt the statewide electrical and plumbing codes. Cities and counties can't take over licensing (ORS 455.148). Electrical and plumbing permits and inspections come from the local building department, or from BCD where it provides services. An owner, or a member of their immediate family, may do electrical work on residential or farm property the owner holds without a license, if the property is not meant for sale, exchange, lease or rent (ORS 479.540). The work must still meet the code and be permitted and inspected. Under OAR 918-261-0040, the owner must be a person, not a company. Plumbing licensing law doesn't apply to a person working on a building they own, if they follow the plumbing code and permit rules (ORS 693.020).
State programs that can affect your permit
- Onsite wastewater (septic) systems
Septic systems are regulated by the Department of Environmental Quality under OAR 340-071. Permits come from DEQ or from a county acting as DEQ's contract agent. A construction-installation permit can be issued only to the owner of the property the system will serve. A site evaluation is normally required first. Altering or enlarging an existing system also needs a permit.
- Wildfire hazard mitigation (ORSC Section R327)
BCD amended ORSC Section R327 effective January 1, 2026, to comply with Senate Bill 83. The section sets wildfire hazard mitigation standards for new homes. It applies where a local jurisdiction adopts it, so ask your building department whether it is in force where you are building.
Oregon county directory
36 local profiles
Portal links an online permit portal (35). Fees links a fee schedule (31). Profiles that point to a city, town or state agency are labeled.
B
C
D
G
H
J
K
L
M
P
S
T
U
W
Y
Profiles marked “City or town offices” point to municipal permit offices because the county does not issue general building permits. Profiles marked “State agency” point to a state program that handles permits or oversight there.
Statewide rules for common projects
Electrical work
Owners and their immediate family may do electrical work on residential or farm property the owner holds without a license, if the property is not intended for sale, exchange, lease or rent (ORS 479.540). The work must meet the 2026 Oregon Electrical Specialty Code (2026 NEC, effective October 1, 2026) and be permitted and inspected. Landlords may do only maintenance-level repairs on rentals.
Accessory dwelling units
Cities over 2,500 and counties over 15,000 must allow at least one accessory dwelling unit (interior, attached or detached) for each detached single-family home in areas inside the urban growth boundary zoned for those homes. They may not require owner occupancy or extra off-street parking (ORS 197A.425).
Oregon permit questions
Which residential code applies to my project right now?
The 2026 ORSC (based on the 2024 IRC) took effect October 1, 2026. Through March 31, 2027, building departments must accept plans under either the 2026 or the 2023 ORSC. From April 1, 2027, only the 2026 edition is accepted. The code in effect when you apply is the one that governs your project.
Can I do my own electrical work in Oregon?
Yes, on residential or farm property you own, if it is not meant for sale, lease or rent. Members of your immediate family can help (ORS 479.540). You still need an electrical permit and inspections, and the work must meet the 2026 Oregon Electrical Specialty Code.
Can I build or remodel my own house without a CCB license?
Yes. Work on property you own, or on your own residence, is exempt from CCB licensing (ORS 701.010). This does not apply if you are building or remodeling to sell. Not living in the home after it's finished is treated as evidence of intent to sell. Anyone you pay to do the work must be CCB-licensed.
Can my city refuse to let me build an ADU?
Cities over 2,500 people and counties over 15,000 must allow at least one ADU with each detached single-family home, in areas inside the urban growth boundary zoned for those homes (ORS 197A.425). They can set reasonable siting and design rules. They can't require the owner to live on site or require extra off-street parking.
Can my city or county have a stricter building code than the state?
Generally no. The state building code is uniform statewide, and local governments may not enforce different requirements on the same matters unless the BCD director authorizes it (ORS 455.040). A few code sections, such as the wildfire provisions in ORSC R327, are optional for local adoption.
Permit guides for common projects
What the model codes say, what local offices often change and what to ask; read them with the Oregon rules above.
- How to get a building permit
- Building permit costs
- Looking up permit records
- Work done without a permit
- Decks
- Fences
- Sheds and accessory buildings
- Roof replacement
- Water heaters
- Heating and air conditioning
- Electrical work
- Rooftop solar
- Pools and spas
- Accessory dwelling units
- Plumbing work
- Kitchen and bathroom remodels
- Demolition
- Septic systems
- Driveways and culverts
- Floodplain development
- Home additions and garages
- Window and door replacement
- Generators and EV chargers
- Manufactured and mobile homes
- Owner-builder permits
Sources
- OAR 918-480-0005 – Adopted Oregon Residential Specialty Code (Division 480, official OAR)secure.sos.state.or.us
- OAR 918-305-0100 – Adoption of Oregon Electrical Specialty Code (Division 305, official OAR)secure.sos.state.or.us
- OAR 918-750-0110 – Oregon Plumbing Specialty Code (Division 750, official OAR)secure.sos.state.or.us
- OAR 918-460-0010 – Adopted Oregon Structural Specialty Code (Division 460, official OAR)secure.sos.state.or.us
- OAR 918-440-0010 – Adopted Oregon Mechanical Specialty Code (Division 440, official OAR)secure.sos.state.or.us
- OAR 918-261 – Electrical exemptions (interpretation of owner)secure.sos.state.or.us
- BCD bulletin (Oct. 5, 2026) – Code adoption: 2026 ORSC / 2026 OPSC / 2026 OESCcontent.govdelivery.com
- BCD bulletin (Jan. 7, 2026) – Notice of Permanent Rules (ORSC R327 wildfire, R332 lofts)content.govdelivery.com
- OAR 340-071 – Onsite Wastewater Treatment Systems (official OAR)secure.sos.state.or.us
- ORS 455.040 – State building code preempts local ordinancesoregon.public.law
- ORS 455.148 – Comprehensive municipal building inspection programsoregon.public.law
- ORS 455.150 – Selective municipal building inspection programsoregon.public.law
- ORS 455.315 – Exemption of agricultural buildingsoregon.public.law
- ORS 701.010 – Exemptions from CCB licensureoregon.public.law
- ORS 701.021 – License requirement; endorsementsoregon.public.law
- ORS 479.540 – Electrical licensing exemptionsoregon.public.law
- ORS 693.020 – Persons and activities not regulated under plumbing chapteroregon.public.law
- ORS 197A.425 – Accessory dwelling unitsoregon.public.law
- Oregon ePermitting (BCD) – permits and license searchaca-oregon.accela.com
- Clatsop County – Codes in Effect (prior 2023/2025 code dates)www.clatsopcounty.gov
Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction
