County Permit SearchU.S. compliance directory
OregonTillamook County

Administrative overview · FIPS 41057

Tillamook County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Tillamook County Department of Community Development, Building Division

For a project in or near Tillamook County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

503-842-3408; inspection hotline 503-842-1815

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

1510-B Third Street, Tillamook, OR 97141 (inside the TLC Fibre Credit Union building)

Operating hours

Monday-Thursday, 8:00 a.m.-4:00 p.m.; the department’s current 4-day schedule is closed Fridays.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Tillamook County

Who handles permitting for this jurisdiction?

Tillamook County Department of Community Development, Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 503-842-3408; inspection hotline 503-842-1815.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call 503-842-1815 before 7:00 a.m. on the requested inspection day and select 1 for structural/manufactured dwelling, 2 mechanical, 3 plumbing, 4 electrical, or 6 short-term rental. Structural and associated trade inspections may also be scheduled through Oregon ePermitting; inspection results are viewed in the portal under Record Info/Schedule Inspections and Inspections. County routes structural/trade inspections Monday-Thursday and has limited electrical availability.

Which codes and exemptions should I review?

Oregon state specialty codes administered by Tillamook County, including the current 2025 Oregon Structural Specialty Code, 2023 Oregon Residential, Electrical, and Plumbing Specialty Codes, and 2025 Mechanical and Energy-Efficiency Specialty Codes as of July 31, 2026; 2026 ORSC/OESC/OPSC adoption is scheduled for October 1, 2026. Applicable fire, manufactured-dwelling, flood, geologic-hazard, sanitation, and Tillamook County land-use requirements also apply. County/State rules require permits for new construction and most structural, plumbing, mechanical, electrical, manufactured-housing, boiler, and elevator work. Limited Oregon residential exemptions include qualifying minor cosmetic finish work, certain low decks, small detached nonhabitable accessory structures, certain patio/deck covers, fences, slabs, and similar work; an exemption from structural permitting does not necessarily exempt electrical, plumbing, mechanical, septic, zoning, flood, or sanitation approvals. Contact Community Development for project-specific exceptions.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?