Linn County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Linn County Planning & Building Department

For a project in or near Linn County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

541-967-3816

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

315 SW 4th Avenue, First Floor, Albany, OR 97321

Operating hours

Monday-Friday, 8:30 AM-5:00 PM

Review expectation

Usually fewer than 10 days for a complete building-permit application. The permitting clock stops for incomplete submissions and restarts when required information is supplied.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Linn County

Who handles permitting for this jurisdiction?

Linn County Planning & Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 541-967-3816.

How long might review take?

Usually fewer than 10 days for a complete building-permit application. The permitting clock stops for incomplete submissions and restarts when required information is supplied.

How are inspections scheduled?

Apply and manage permits through Oregon ePermitting/Citizen Access. Inspections are requested through the portal after issuance and at required construction stages; contact Linn County Planning & Building at 541-967-3816 for scheduling or inspection questions.

Which codes and exemptions should I review?

Oregon's current statewide specialty codes applicable in 2026: 2025 Oregon Structural Specialty Code; 2023 Oregon Residential, Electrical, and Plumbing Specialty Codes; 2025 Oregon Mechanical and Energy Efficiency Specialty Codes, plus applicable manufactured-dwelling, fire/life-safety, floodplain, septic, and Linn County land-development requirements. Linn County provides an official 'When permits are not required' guide and an Agricultural Exempt Building Application. Oregon-code exemptions can cover ordinary maintenance and limited minor work, qualifying small detached accessory structures, and agricultural buildings that meet ORS 455.315; exemptions do not waive zoning, land-use, sanitation, floodplain, utility, or other applicable approvals. Agricultural dwellings are not automatically exempt.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?