Who issues permits

Hood River County Building Department is the county office listed for building permits in Hood River County.

Also listed: Community Development.

How to get a permit in Hood River County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the Accela Citizen Access portal at aca-oregon.accela.com, or with the published application forms.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

The county's Public Works review guidance asks applicants to allow at least 5 business days for building-permit applications requiring Public Works review; Building Department plan-review time is project-dependent and no single standard turnaround was published.

Search Hood River County permit records

The listing’s online portal is at aca-oregon.accela.com ↗ and runs on Accela Citizen Access. Open the Building (or Permits) tab and use its record search to look up permits by address, parcel or record number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Hood River County Building Department at 541-386-1306. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Hood River County Building Department publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

Hood River County Building Code Services administers Oregon State Codes, state laws, and local ordinances. Current 2026 editions include the 2025 Oregon Structural Specialty Code, 2023 Oregon Residential Specialty Code, 2023 Oregon Electrical Specialty Code, 2023 Oregon Plumbing Specialty Code, 2025 Oregon Mechanical Specialty Code, 2025 Oregon Energy Efficiency Specialty Code, and applicable fire and manufactured-dwelling codes. Hood River County oversees the county building-code program; the City of Hood River and City of Cascade Locks have defined shared or separate responsibilities within their city limits.

Oregon: statewide code. Details

Work that may not need a permit

The county states that most new construction, additions, remodels, and repairs require permits. Limited Oregon-code exemptions may apply to ordinary maintenance, minor repairs, qualifying small accessory or agricultural structures, and certain trade work, but zoning, land-use, floodplain, septic, fire, utility, and agency sign-offs may still be required. Agricultural buildings must meet the county's land-use definition and approval criteria; confirm any exemption with Building and Planning.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Apply and schedule inspections through Oregon ePermitting at BuildingPermits.Oregon.gov or the Oregon ePermitting app. Keep the permit, inspection card, approved plan set, and required agency approvals onsite. For local scheduling or inspection questions contact Hood River County Building at 541-386-1306; the county's building page identifies its inspectors and Building Department as the inspection authority.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

The Hood River County fee schedule charges an investigative fee at actual or average cost for work begun without the required permit, plus applicable permit, plan-review, surcharge, and inspection fees. The county Building Department may issue notices, orders, or subpoenas. Code Compliance is complaint-driven and may require correction or abatement; the county nuisance ordinance permits county abatement, a 50% administrative-overhead/civil-penalty surcharge on abatement expense, property liens, and interest. The building application expires if a permit is not obtained within 180 days after acceptance or if permitted work is suspended or abandoned for 180 days.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Oregon rules that apply in Hood River County

These rules come from Oregon law and state agencies, so they apply in Hood River County on top of anything the local office requires.

Building code

Statewide code

The state building code is uniform throughout Oregon (ORS 455.040). The 2026 Oregon Residential Specialty Code (ORSC) is based on the 2024 IRC and took effect October 1, 2026. Its Chapter 1 is mandatory now. For the rest, building departments must accept plans under either the 2026 or the 2023 ORSC until March 31, 2027, and the 2026 edition becomes mandatory April 1, 2027.

Read more

The 2026 Oregon Electrical Specialty Code is based on the 2026 NEC and became effective and mandatory October 1, 2026, replacing the 2023 OESC (2023 NEC). The 2026 Oregon Plumbing Specialty Code is based on the 2024 Uniform Plumbing Code and took effect October 1, 2026. For other buildings, the 2025 Oregon Structural Specialty Code (2024 IBC, 2024 IFC new-construction provisions and 2024 IEBC) took effect October 1, 2025 and became mandatory April 1, 2026. So did the 2025 Oregon Mechanical Specialty Code (2024 IMC and IFGC). The code in effect when you apply for a permit governs the project.

Oregon Department of Consumer and Business Services, Building Codes Division (BCD) ↗

Outside city limits

The state code applies in unincorporated areas too. Counties that run a building inspection program issue permits outside city limits. Under ORS 455.148 and 455.150, a city or county that takes on a building program must run it in four-year periods.

Read more

BCD can take over a program a local government abandons or can't run, and in some rural areas BCD provides building services directly. Agricultural buildings, equine facilities and dog training facilities on farms are exempt from the structural code (ORS 455.315). Incorporated cities may still regulate them.

Contractor and trade licensing

Anyone paid to build, alter, improve or repair a structure needs a CCB license with the right residential or commercial endorsement (ORS 701.021). A few exemptions apply under ORS 701.010. Casual, minor work under $1,000 is exempt if the person does not advertise as a contractor.

Read more

A person may work on property they own, or on their own residence, whether or not they live in it. This does not apply if the work is part of a business of building or remodeling to sell, and not living in the structure afterward is prima facie evidence of intent to sell. An owner who hires licensed contractors is also exempt. You can still need a building permit as an owner-builder. Before you hire, check the contractor's license on the CCB website. Electrical and plumbing licenses issued by BCD can be searched in Oregon ePermitting.

Electrical, plumbing and HVAC

BCD and its boards license electricians and plumbers and adopt the statewide electrical and plumbing codes. Cities and counties can't take over licensing (ORS 455.148). Electrical and plumbing permits and inspections come from the local building department, or from BCD where it provides services.

Read more

An owner, or a member of their immediate family, may do electrical work on residential or farm property the owner holds without a license, if the property is not meant for sale, exchange, lease or rent (ORS 479.540). The work must still meet the code and be permitted and inspected. Under OAR 918-261-0040, the owner must be a person, not a company. Plumbing licensing law doesn't apply to a person working on a building they own, if they follow the plumbing code and permit rules (ORS 693.020).

State programs that can affect your permit

Onsite wastewater (septic) systems

Septic systems are regulated by the Department of Environmental Quality under OAR 340-071. Permits come from DEQ or from a county acting as DEQ's contract agent. A construction-installation permit can be issued only to the owner of the property the system will serve. A site evaluation is normally required first. Altering or enlarging an existing system also needs a permit.

Official page: secure.sos.state.or.us ↗

Wildfire hazard mitigation (ORSC Section R327)

BCD amended ORSC Section R327 effective January 1, 2026, to comply with Senate Bill 83. The section sets wildfire hazard mitigation standards for new homes. It applies where a local jurisdiction adopts it, so ask your building department whether it is in force where you are building.

Official page: content.govdelivery.com ↗

Verified October 28, 2026 against Oregon sources. Oregon permit rules, sources and other counties

Common projects in Hood River County

Oregon has statewide rules on file for 2 of these projects; they apply in Hood River County along with local permit requirements.

  • Electrical work

    Owners and their immediate family may do electrical work on residential or farm property the owner holds without a license, if the property is not intended for sale, exchange, lease or rent (ORS 479.540).

    Read more

    The work must meet the 2026 Oregon Electrical Specialty Code (2026 NEC, effective October 1, 2026) and be permitted and inspected. Landlords may do only maintenance-level repairs on rentals.

    Oregon source: oregon.public.law ↗ · Electrical work permit guide

  • Accessory dwelling units

    Cities over 2,500 and counties over 15,000 must allow at least one accessory dwelling unit (interior, attached or detached) for each detached single-family home in areas inside the urban growth boundary zoned for those homes. They may not require owner occupancy or extra off-street parking (ORS 197A.425).

    Oregon source: oregon.public.law ↗ · Accessory dwelling units permit guide

Named in Hood River County’s exemption summary (read it before assuming the work is exempt): Septic systems · Floodplain development · Kitchen and bathroom remodels

Guides for other projects: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · All 21 project guides

Other permits you may need in Hood River County

These are separate from the building permit and come from the agencies named, under Oregon rules.

  • Septic system

    Oregon DEQ or county contract agent

    Oregon DEQ permits residential septic systems directly in Curry, Jackson and Josephine counties, and in the other 33 counties a local contract agent issues permits under OAR 340-071-0120. The process starts with a site evaluation of soil test pits you provide in the proposed initial and replacement absorption areas, followed by a separate construction-installation permit that is valid for one year. The installed system must pass a pre-cover inspection.

    Official page: oregon.gov ↗ · Septic permit guide

  • Floodplain development

    Dept. of Land Conservation and Development (DLCD)

    DLCD helps cities, counties and tribes participate in the National Flood Insurance Program, and the State NFIP Coordinator is on DLCD staff. In Oregon, cities and counties adopt floodplain maps and regulations and issue floodplain development permits locally.

    Official page: oregon.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Oregon DOT (ODOT)

    Under ORS 374.305, anyone building a new driveway or road approach onto a state highway, or changing the use of an existing connection, must first get written permission through an ODOT state highway approach permit.

    Read more

    Applications and questions go to the local ODOT district office. For county roads or city streets, check with the county or city.

    Official page: oregon.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Oregon DEQ

    Construction activities that disturb one acre or more, including clearing, grading and excavation, or that are part of a common plan, need coverage under DEQ's NPDES 1200-C construction stormwater general permit, and an Erosion and Sediment Control Plan must be approved before construction begins.

    Read more

    Sites disturbing 1 to 5 acres inside a local jurisdiction that runs a DEQ-approved Qualified Local Program are covered under the 1200-CN permit instead.

    Official page: oregon.gov ↗

  • Water well

    Oregon Water Resources Dept. (OWRD)

    OWRD licenses water well constructors, and constructors submit a well report to OWRD when a well is constructed, altered, converted or decommissioned. A landowner who drills a well on their own property needs an OWRD landowner permit, fee and bond before starting work, and must file a water well report within 30 days of completion or permit expiration.

    Official page: oregon.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Hood River County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 541-386-1306 if you are unsure.

Can I apply for a permit online in Hood River County?

Yes. The listing includes an online permit portal at aca-oregon.accela.com. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Hood River County?

Hood River County Building Department publishes its fee schedule online (hoodriveror.govoffice2.com). Look up your project type there, and ask the office at 541-386-1306 for an estimate if your project is not listed.

How do I look up past permits for an address in Hood River County?

Start with the Accela Citizen Access portal at aca-oregon.accela.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 541-386-1306 for the file or send a public records request.

Can I check a contractor's license for work in Hood River County?

Yes, at search.ccb.state.or.us. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Hood River County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Hood River County borders Clackamas County, Multnomah County, Wasco County, Klickitat County (Washington), Skamania County (Washington).

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Hood River County.