County Permit SearchU.S. compliance directory
OregonCurry County

Administrative overview · FIPS 41015

Curry County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Curry County Community Development Department / Building Division; Oregon Building Codes Division for electrical permitting

For a project in or near Curry County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

541-247-3304; toll-free 888-811-1520; Oregon BCD 503-378-4133

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Curry County Community Development, 94235 Moore Street, Suite 113 (lower level), Gold Beach, OR 97444; Oregon BCD, 1535 Edgewater Street NW, Salem, OR 97304

Operating hours

Curry County Monday-Friday 8:00 AM-5:00 PM, closed noon-1:00 PM and Thursday 10:00-11:00 AM for staff meeting; Oregon BCD Monday-Friday 8:00 AM-5:00 PM.

Review expectation

N/A. Curry County and Oregon BCD publish application and inspection procedures but no standard 2026 plan-review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Curry County

Who handles permitting for this jurisdiction?

Curry County Community Development Department / Building Division; Oregon Building Codes Division for electrical permitting is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 541-247-3304; toll-free 888-811-1520; Oregon BCD 503-378-4133.

How long might review take?

N/A. Curry County and Oregon BCD publish application and inspection procedures but no standard 2026 plan-review timeline.

How are inspections scheduled?

Purchase permits and schedule inspections through Oregon ePermitting. Electrical permits and inspections for Curry County are handled by Oregon BCD through the portal. For county building questions or non-electrical inspection coordination, contact Community Development at 541-247-3304 or buildingpermits@co.curry.or.us; the county code requires work to remain available for inspection and permits generally expire if work is not started or is suspended for 180 days.

Which codes and exemptions should I review?

Curry County's Building Code adopts the current Oregon Structural, Mechanical, Plumbing, Electrical, Solar Installation, Energy Efficiency, Fire, Residential, and Manufactured Dwelling Installation Specialty Codes as amended and on file. For 2026 this means the current 2025 OSSC, 2023 ORSC/OESC/OPSC, 2025 OMSC/OEESC, and applicable manufactured-dwelling codes. Oregon BCD provides electrical permitting and inspections for Curry County and the City of Brookings; Curry County Community Development administers the remaining county building-code functions. Curry County offers a Farm Agricultural Building Exemption Certificate for qualifying agricultural buildings that are not dwellings, are not used for residential occupancy, and meet ORS 455.315 criteria; no structural building permit or plans are required for the exempt structure, but electrical, plumbing, mechanical, elevator, and boiler permits remain required. Other limited Oregon specialty-code exemptions may apply to minor repairs and qualifying accessory structures; confirm with Community Development. Most new, altered, moved, repaired, or converted structures and regulated systems require permits.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?