Washington building permits

Washington has a mandatory State Building Code that applies in every city and county. Building permits come from the city or, outside city limits, the county. Electrical work is handled separately: the Department of Labor & Industries (L&I) issues electrical permits and inspects the work everywhere except about two dozen cities that run their own programs. Contractors must register with L&I, and owners may do their own building, electrical and plumbing work on property they own.

Local profiles
39
Link an online portal
22 (56%)
County office
39

How permits work in Washington

Building codes

Statewide code

The State Building Code (RCW 19.27.031) is in effect in all counties and cities. The 2021 editions of the IBC, IRC, IMC, IFC and Uniform Plumbing Code, with Washington amendments, plus the Washington State Energy Code, took effect March 15, 2024. The State Building Code Council (SBCC) is adopting the 2024 editions. As of October 2026 final adoption was targeted for October 16, 2026 (energy codes November 20, 2026), with a planned effective date of May 3, 2027. Until then the 2021 codes apply. Electrical work is under a separate code (chapter 19.28 RCW, WAC 296-46B). The 2023 NEC has applied since April 1, 2024, and L&I has adopted the 2026 NEC to take effect December 31, 2026.

Washington State Building Code Council (SBCC); electrical code by the Department of Labor & Industries

Outside city limits

Counties enforce the State Building Code and issue building permits in unincorporated areas (RCW 19.27.050). A county without a building department must arrange for another jurisdiction or an approved agency to do it. Electrical permits and inspections in unincorporated areas come from L&I, not the county. Septic permits come from the local health jurisdiction.

Contractors and owner-builders

Every construction contractor must register with L&I before bidding, advertising or working, either as a general or a specialty contractor. A surety bond ($30,000 general, $15,000 specialty) and general liability insurance are required. Electrical, plumbing, elevator, boiler, asbestos and manufactured home installation work have extra licensing or certification rules. Under RCW 18.27.090, registration is not required for a person working on their own property, occupied or not, unless the work is done to sell, demolish or lease it. It is also not required for an owner doing maintenance, repair and alteration on their own properties. Building permits are issued by the city or county, and owners may apply for their own.

Washington State Department of Labor & Industries (L&I), Contractor Registration · Look up a license

Electrical, plumbing, and HVAC

L&I licenses electrical contractors and certifies electricians and trainees (chapter 19.28 RCW). It also certifies plumbers, plumber trainees and medical gas installers (chapter 18.106 RCW). Only certified plumbers may do plumbing work on someone else's property. Electrical permits and inspections are run by L&I statewide, except in about two dozen cities that issue their own and in Tacoma Power's service area. Plumbing permits come with local building permits under the state plumbing code (the UPC).

State programs that can affect your permit

  • L&I state electrical permits and inspections

    L&I sells electrical permits and inspects the work in all areas except cities that run their own program. Those cities are Aberdeen, Bellevue, Bellingham, Burien, Des Moines, Everett, Federal Way, Kirkland, Lacey, Lynnwood, Marysville, Mercer Island, Milton, Mountlake Terrace, Normandy Park, Olympia, Port Angeles, Redmond, Renton, Sammamish, SeaTac, Seattle, Spokane, Tukwila and Vancouver, plus Tacoma Power's service area. The permit must be bought by the contractor or by the property owner who will actually do the work.

  • Manufactured/mobile home alterations (L&I)

    Alterations to manufactured and mobile homes need a permit and inspection from L&I to make sure the changes meet safety standards.

  • On-site sewage (septic) systems

    Local health jurisdictions permit septic systems with design flows up to 3,499 gallons per day, which covers essentially all single-family homes. Larger systems go to the Department of Health or the Department of Ecology.

Washington county directory

39 local profiles

Portal links an online permit portal (22). Fees links a fee schedule (5).

Statewide rules for common projects

  • Electrical work

    Electrical work needs an electrical permit and inspection from L&I, or from the city if it runs its own program. Homeowners may do their own work at their residence or farm without a license (RCW 19.28.261), but must buy the permit themselves. Some minor work is exempt under WAC 296-46B-901.

    Official source · Electrical work permit guide

  • Accessory dwelling units

    Under RCW 36.70A.680–.681, cities and counties planning under the Growth Management Act must allow two ADUs per lot in urban growth areas wherever single-family homes are allowed. They may not require owner occupancy, may not set a maximum size below 1,000 sq ft, and may not require parking within half a mile of a major transit stop. ADU impact fees are capped at 50% of the main house's.

    Official source · Accessory dwelling units permit guide

Washington permit questions

Who do I get an electrical permit from in Washington?

In most of the state, including all unincorporated county areas, you buy it from L&I, not the county building department. If your home is in a city that runs its own program (Seattle, Spokane, Bellevue, Vancouver, Everett and about 20 others) or in Tacoma Power's service area, get it there.

Can I do electrical work on my own house without a license?

Yes. RCW 19.28.261 lets you do electrical work at your own residence or farm without a license, but you still need a permit and inspection. The exemption does not cover a new building intended for rent, sale or lease, or property offered for sale within 12 months of buying it.

Can I do my own plumbing?

Yes, on property you own (RCW 18.106.150). Plumbing work on anyone else's property must be done by an L&I-certified plumber. Permits come from your city or county.

Which building code edition applies to my permit right now?

The 2021 codes with Washington amendments, in effect since March 15, 2024. The SBCC plans to switch to the 2024 codes on May 3, 2027. Electrical work follows the 2023 NEC until the 2026 NEC takes effect December 31, 2026.

Can I build a backyard cottage (ADU) in Washington?

In urban growth areas of cities and counties planning under the Growth Management Act, state law requires allowing at least two ADUs on lots zoned for single-family homes. Local governments may not require owner occupancy, and impact fees on an ADU are capped at 50% of those for the main house. Many cities also must allow duplexes or fourplexes under the middle housing law.

Permit guides for common projects

What the model codes say, what local offices often change and what to ask; read them with the Washington rules above.

Sources

Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction