Who issues permits

Yakima County Building and Fire Safety is the county office listed for building permits in Yakima County.

How to get a permit in Yakima County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the portal at yakimacounty.us, or with the published application forms.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Yakima County permit records

The listing’s online portal is at yakimacounty.us ↗. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Yakima County Building and Fire Safety at 509-574-2300. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Yakima County Building and Fire Safety publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

2021 Washington State construction codes and applicable Yakima County requirements; current county materials reference a 2026 fee increase effective April 1.

Washington: statewide code. Details

Work that may not need a permit

Qualifying Washington code exemptions may apply; verify county land-use, fire, floodplain and site requirements.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Call 509-574-2370 for inspections and use the County Building page for permit submission and portal directions.

Work without a permit

The County may stop work and require permits, correction and inspections for covered work; exact penalty amounts were not verified.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 509-574-2300 about:

  • Review times: how long plan review currently takes.
  • Zoning: the zoning map or ordinance for your parcel.

Washington rules that apply in Yakima County

These rules come from Washington law and state agencies, so they apply in Yakima County on top of anything the local office requires.

Building code

Statewide code

The State Building Code (RCW 19.27.031) is in effect in all counties and cities. The 2021 editions of the IBC, IRC, IMC, IFC and Uniform Plumbing Code, with Washington amendments, plus the Washington State Energy Code, took effect March 15, 2024.

Read more

The State Building Code Council (SBCC) is adopting the 2024 editions. As of October 2026 final adoption was targeted for October 16, 2026 (energy codes November 20, 2026), with a planned effective date of May 3, 2027. Until then the 2021 codes apply. Electrical work is under a separate code (chapter 19.28 RCW, WAC 296-46B). The 2023 NEC has applied since April 1, 2024, and L&I has adopted the 2026 NEC to take effect December 31, 2026.

Washington State Building Code Council (SBCC); electrical code by the Department of Labor & Industries ↗

Outside city limits

Counties enforce the State Building Code and issue building permits in unincorporated areas (RCW 19.27.050). A county without a building department must arrange for another jurisdiction or an approved agency to do it. Electrical permits and inspections in unincorporated areas come from L&I, not the county. Septic permits come from the local health jurisdiction.

Contractor and trade licensing

Every construction contractor must register with L&I before bidding, advertising or working, either as a general or a specialty contractor. A surety bond ($30,000 general, $15,000 specialty) and general liability insurance are required.

Read more

Electrical, plumbing, elevator, boiler, asbestos and manufactured home installation work have extra licensing or certification rules. Under RCW 18.27.090, registration is not required for a person working on their own property, occupied or not, unless the work is done to sell, demolish or lease it. It is also not required for an owner doing maintenance, repair and alteration on their own properties. Building permits are issued by the city or county, and owners may apply for their own.

Electrical, plumbing and HVAC

L&I licenses electrical contractors and certifies electricians and trainees (chapter 19.28 RCW). It also certifies plumbers, plumber trainees and medical gas installers (chapter 18.106 RCW).

Read more

Only certified plumbers may do plumbing work on someone else's property. Electrical permits and inspections are run by L&I statewide, except in about two dozen cities that issue their own and in Tacoma Power's service area. Plumbing permits come with local building permits under the state plumbing code (the UPC).

State programs that can affect your permit

L&I state electrical permits and inspections

L&I sells electrical permits and inspects the work in all areas except cities that run their own program. Those cities are Aberdeen, Bellevue, Bellingham, Burien, Des Moines, Everett, Federal Way, Kirkland, Lacey, Lynnwood, Marysville, Mercer Island, Milton, Mountlake Terrace, Normandy Park, Olympia, Port Angeles, Redmond, Renton, Sammamish, SeaTac, Seattle, Spokane, Tukwila and Vancouver, plus Tacoma Power's service area. The permit must be bought by the contractor or by the property owner who will actually do the work.

Official page: lni.wa.gov ↗

Manufactured/mobile home alterations (L&I)

Alterations to manufactured and mobile homes need a permit and inspection from L&I to make sure the changes meet safety standards.

Official page: lni.wa.gov ↗

On-site sewage (septic) systems

Local health jurisdictions permit septic systems with design flows up to 3,499 gallons per day, which covers essentially all single-family homes. Larger systems go to the Department of Health or the Department of Ecology.

Official page: doh.wa.gov ↗

Verified October 28, 2026 against Washington sources. Washington permit rules, sources and other counties

Common projects in Yakima County

Washington has statewide rules on file for 2 of these projects; they apply in Yakima County along with local permit requirements.

  • Electrical work

    Electrical work needs an electrical permit and inspection from L&I, or from the city if it runs its own program. Homeowners may do their own work at their residence or farm without a license (RCW 19.28.261), but must buy the permit themselves. Some minor work is exempt under WAC 296-46B-901.

    Washington source: lni.wa.gov ↗ · Electrical work permit guide

  • Accessory dwelling units

    Under RCW 36.70A.680–.681, cities and counties planning under the Growth Management Act must allow two ADUs per lot in urban growth areas wherever single-family homes are allowed. They may not require owner occupancy, may not set a maximum size below 1,000 sq ft, and may not require parking within half a mile of a major transit stop. ADU impact fees are capped at 50% of the main house's.

    Washington source: app.leg.wa.gov ↗ · Accessory dwelling units permit guide

Named in Yakima County’s exemption summary (read it before assuming the work is exempt): Floodplain development

Guides for other projects: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · All 21 project guides

Other permits you may need in Yakima County

These are separate from the building permit and come from the agencies named, under Washington rules.

  • Septic system

    Local health jurisdiction (under WA DOH rules)

    In Washington, the local health officer (county or district health department) permits on-site sewage systems with design flows up to 3,499 gallons per day, and DOH handles larger systems. Except for a minor repair, you need a local permit before installing, repairing, modifying or expanding a system, and the application must include a soil and site evaluation done by a professional engineer, licensed designer or the local health officer (WAC 246-272A-0200 and -0220).

    Read more

    Systems must be designed by a professional engineer or licensed on-site sewage designer, although the local health officer may allow a resident owner to design a system for their own single-family home that is not within 200 feet of a marine shoreline (WAC 246-272A-0230).

    Official page: app.leg.wa.gov ↗ · Septic permit guide

  • Floodplain development

    WA Dept. of Ecology

    The State NFIP Coordinator is on Ecology's staff, and Ecology helps local governments meet NFIP and state floodplain standards. Floodplain development permits come from your city or county floodplain administrator.

    Read more

    State rules (WAC 173-158-070) go beyond NFIP minimums by prohibiting construction or reconstruction of homes in designated floodways, except repairs or improvements that do not increase ground floor area and cost no more than 50 percent of the structure's market value.

    Official page: ecology.wa.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    WSDOT

    WSDOT Development Services and Access issues access connection permits for driveways and other connections to state highways outside incorporated cities and towns; contact the area development services manager before applying.

    Read more

    On managed-access state highways inside city limits, the city grants access. For county roads, check with the county road or public works department.

    Official page: wsdot.wa.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    WA Dept. of Ecology

    Ecology's Construction Stormwater General Permit is required for sites that disturb one acre or more through clearing, grading, excavating or stockpiling fill, and for smaller sites that are part of a common plan of development disturbing one acre or more, when stormwater could reach surface waters.

    Read more

    Ecology can also require coverage for a site of any size it finds is a significant contributor of pollutants. Permitted sites must prepare a stormwater pollution prevention plan (SWPPP) and use erosion and sediment controls.

    Official page: ecology.wa.gov ↗

  • Water well

    WA Dept. of Ecology

    Ecology regulates well construction and licenses well drillers, and a notice of intent must be filed with Ecology 72 hours before a well is drilled, which the licensed driller typically handles. A notice of intent is not a water right: if you plan to use more than 5,000 gallons per day or irrigate more than half an acre, you need to apply for a water right before drilling. Some areas have added local requirements, so check with your local permitting agency too.

    Official page: ecology.wa.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Yakima County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 509-574-2300 if you are unsure.

Can I apply for a permit online in Yakima County?

Yes. The listing includes an online permit portal at yakimacounty.us. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Yakima County?

Yakima County Building and Fire Safety publishes its fee schedule online (yakimacounty.us). Look up your project type there, and ask the office at 509-574-2300 for an estimate if your project is not listed.

How do I look up past permits for an address in Yakima County?

Start with the portal at yakimacounty.us and search by address, parcel or permit number. If an older permit is not there, ask the office at 509-574-2300 for the file or send a public records request.

Can I check a contractor's license for work in Yakima County?

Yes, at eirs.websupport.lni.wa.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Yakima County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Yakima County borders Benton County, Grant County, King County, Kittitas County, Klickitat County, Lewis County, and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Yakima County.