Who issues permits
Lewis County Community Development is the county office listed for building permits in Lewis County.
How to get a permit in Lewis County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the portal at lewiscountywa.gov, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Lewis County permit records
The listing’s online portal is at lewiscountywa.gov ↗. Look for its public search and try the property address, parcel number or permit number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Lewis County Community Development at 360-748-9121. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Building codes and exemptions
Codes referenced
2021 Washington State construction codes and applicable Lewis County requirements.
Washington: statewide code. Details
Work that may not need a permit
Qualifying Washington code exemptions may apply; confirm county land-use, critical-area and environmental requirements.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Use the County Community Development page to submit, check or request an inspection; SmartGov access is provided there.
Work without a permit
The County may issue stop-work and correction requirements and require permits and inspections for covered work.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at 360-748-9121 about:
- Fees: the current fee schedule and an estimate for your project.
- Review times: how long plan review currently takes.
- Zoning: the zoning map or ordinance for your parcel.
Washington rules that apply in Lewis County
These rules come from Washington law and state agencies, so they apply in Lewis County on top of anything the local office requires.
Building code
Statewide code
The State Building Code (RCW 19.27.031) is in effect in all counties and cities. The 2021 editions of the IBC, IRC, IMC, IFC and Uniform Plumbing Code, with Washington amendments, plus the Washington State Energy Code, took effect March 15, 2024.
Read more
The State Building Code Council (SBCC) is adopting the 2024 editions. As of October 2026 final adoption was targeted for October 16, 2026 (energy codes November 20, 2026), with a planned effective date of May 3, 2027. Until then the 2021 codes apply. Electrical work is under a separate code (chapter 19.28 RCW, WAC 296-46B). The 2023 NEC has applied since April 1, 2024, and L&I has adopted the 2026 NEC to take effect December 31, 2026.
Outside city limits
Counties enforce the State Building Code and issue building permits in unincorporated areas (RCW 19.27.050). A county without a building department must arrange for another jurisdiction or an approved agency to do it. Electrical permits and inspections in unincorporated areas come from L&I, not the county. Septic permits come from the local health jurisdiction.
Contractor and trade licensing
Every construction contractor must register with L&I before bidding, advertising or working, either as a general or a specialty contractor. A surety bond ($30,000 general, $15,000 specialty) and general liability insurance are required.
Read more
Electrical, plumbing, elevator, boiler, asbestos and manufactured home installation work have extra licensing or certification rules. Under RCW 18.27.090, registration is not required for a person working on their own property, occupied or not, unless the work is done to sell, demolish or lease it. It is also not required for an owner doing maintenance, repair and alteration on their own properties. Building permits are issued by the city or county, and owners may apply for their own.
Electrical, plumbing and HVAC
L&I licenses electrical contractors and certifies electricians and trainees (chapter 19.28 RCW). It also certifies plumbers, plumber trainees and medical gas installers (chapter 18.106 RCW).
Read more
Only certified plumbers may do plumbing work on someone else's property. Electrical permits and inspections are run by L&I statewide, except in about two dozen cities that issue their own and in Tacoma Power's service area. Plumbing permits come with local building permits under the state plumbing code (the UPC).
State programs that can affect your permit
L&I state electrical permits and inspections
L&I sells electrical permits and inspects the work in all areas except cities that run their own program. Those cities are Aberdeen, Bellevue, Bellingham, Burien, Des Moines, Everett, Federal Way, Kirkland, Lacey, Lynnwood, Marysville, Mercer Island, Milton, Mountlake Terrace, Normandy Park, Olympia, Port Angeles, Redmond, Renton, Sammamish, SeaTac, Seattle, Spokane, Tukwila and Vancouver, plus Tacoma Power's service area. The permit must be bought by the contractor or by the property owner who will actually do the work.
Manufactured/mobile home alterations (L&I)
Alterations to manufactured and mobile homes need a permit and inspection from L&I to make sure the changes meet safety standards.
On-site sewage (septic) systems
Local health jurisdictions permit septic systems with design flows up to 3,499 gallons per day, which covers essentially all single-family homes. Larger systems go to the Department of Health or the Department of Ecology.
Verified October 28, 2026 against Washington sources. Washington permit rules, sources and other counties
Common projects in Lewis County
Washington has statewide rules on file for 2 of these projects; they apply in Lewis County along with local permit requirements.
Electrical work
Electrical work needs an electrical permit and inspection from L&I, or from the city if it runs its own program. Homeowners may do their own work at their residence or farm without a license (RCW 19.28.261), but must buy the permit themselves. Some minor work is exempt under WAC 296-46B-901.
Washington source: lni.wa.gov ↗ · Electrical work permit guide
Accessory dwelling units
Under RCW 36.70A.680–.681, cities and counties planning under the Growth Management Act must allow two ADUs per lot in urban growth areas wherever single-family homes are allowed. They may not require owner occupancy, may not set a maximum size below 1,000 sq ft, and may not require parking within half a mile of a major transit stop. ADU impact fees are capped at 50% of the main house's.
Washington source: app.leg.wa.gov ↗ · Accessory dwelling units permit guide
Guides for other projects: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · All 21 project guides
Other permits you may need in Lewis County
These are separate from the building permit and come from the agencies named, under Washington rules.
Septic system
Local health jurisdiction (under WA DOH rules)
In Washington, the local health officer (county or district health department) permits on-site sewage systems with design flows up to 3,499 gallons per day, and DOH handles larger systems. Except for a minor repair, you need a local permit before installing, repairing, modifying or expanding a system, and the application must include a soil and site evaluation done by a professional engineer, licensed designer or the local health officer (WAC 246-272A-0200 and -0220).
Read more
Systems must be designed by a professional engineer or licensed on-site sewage designer, although the local health officer may allow a resident owner to design a system for their own single-family home that is not within 200 feet of a marine shoreline (WAC 246-272A-0230).
Floodplain development
WA Dept. of Ecology
The State NFIP Coordinator is on Ecology's staff, and Ecology helps local governments meet NFIP and state floodplain standards. Floodplain development permits come from your city or county floodplain administrator.
Read more
State rules (WAC 173-158-070) go beyond NFIP minimums by prohibiting construction or reconstruction of homes in designated floodways, except repairs or improvements that do not increase ground floor area and cost no more than 50 percent of the structure's market value.
Official page: ecology.wa.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
WSDOT
WSDOT Development Services and Access issues access connection permits for driveways and other connections to state highways outside incorporated cities and towns; contact the area development services manager before applying.
Read more
On managed-access state highways inside city limits, the city grants access. For county roads, check with the county road or public works department.
Erosion and sediment control
WA Dept. of Ecology
Ecology's Construction Stormwater General Permit is required for sites that disturb one acre or more through clearing, grading, excavating or stockpiling fill, and for smaller sites that are part of a common plan of development disturbing one acre or more, when stormwater could reach surface waters.
Read more
Ecology can also require coverage for a site of any size it finds is a significant contributor of pollutants. Permitted sites must prepare a stormwater pollution prevention plan (SWPPP) and use erosion and sediment controls.
Water well
WA Dept. of Ecology
Ecology regulates well construction and licenses well drillers, and a notice of intent must be filed with Ecology 72 hours before a well is drilled, which the licensed driller typically handles. A notice of intent is not a water right: if you plan to use more than 5,000 gallons per day or irrigate more than half an acre, you need to apply for a water right before drilling. Some areas have added local requirements, so check with your local permitting agency too.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Lewis County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 360-748-9121 if you are unsure.
Can I apply for a permit online in Lewis County?
Yes. The listing includes an online permit portal at lewiscountywa.gov. The agency also publishes application forms online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Lewis County?
Lewis County Community Development has no fee schedule online, so the cost has to come from the office. Call the office at 360-748-9121 with the project type, size and estimated value for a quote.
How do I look up past permits for an address in Lewis County?
Start with the portal at lewiscountywa.gov and search by address, parcel or permit number. If an older permit is not there, ask the office at 360-748-9121 for the file or send a public records request.
Can I check a contractor's license for work in Lewis County?
Yes, at eirs.websupport.lni.wa.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Lewis County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Lewis County borders Cowlitz County, Grays Harbor County, Pacific County, Pierce County, Skamania County, Thurston County, and others.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Lewis County.
