Administrative overview · FIPS 26049
Genesee County permit authority
The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.
Jurisdictional status
Municipal Fallback
This profile identifies a handoff outside the county’s ordinary structural permitting lane.
Required jurisdiction check
Confirm the controlling local or state authority before filing.
The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.
Responsible agency
Cities, villages, and townships in Genesee County; Michigan Department of Licensing and Regulatory Affairs (LARA), Bureau of Construction Codes (BCC) where the local unit has no enforcing authority
For a project in or near Genesee County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.
Direct contact
517-241-9313 (LARA BCC permits); local municipal building departments use their own numbers
Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.
Permit counter
LARA/BCC physical and overnight address: 2407 N. Grand River Avenue, Lansing, MI 48906; permit-mailing address: P.O. Box 30255, Lansing, MI 48909
Operating hours
LARA BCC: Monday-Friday, 8:00 AM-5:00 PM; individual municipal offices set their own hours.
Review expectation
N/A for plan review; LARA publishes an inspection-request response within two business days and typical inspection performance within five business days. Local municipal review times vary.
Compliance workbench
Choose the next project decision.
Apply online
Open the verified digital gateway, application form, and review timeline.
Open guide →Fees & penalties
Understand fee schedules, enforcement exposure, and stop-work liabilities.
Open guide →Codes & exemptions
Read the code framework, minor-work exemptions, and inspection lane.
Open guide →Agency website
Visit the primary public source for current notices and contact changes.
Open guide →Source trail
Official sources for this profile
Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.
Project questions
Frequently asked questions for Genesee County
Who handles permitting for this jurisdiction?
This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.
How should I begin an application?
Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 517-241-9313 (LARA BCC permits); local municipal building departments use their own numbers.
How long might review take?
N/A for plan review; LARA publishes an inspection-request response within two business days and typical inspection performance within five business days. Local municipal review times vary.
How are inspections scheduled?
Apply through the responsible local municipal building department or, where LARA has authority, through Accela or the BCC-324 form. The inspector's telephone number is provided on the issued permit; call with the job location, permit number, and contact information when work is ready. The state form says LARA will respond to an inspection request within two business days to schedule and that inspections are typically performed within five business days, subject to the schedule.
Which codes and exemptions should I review?
Michigan's current published codes for 2026 are the 2021 Michigan Building Code (effective April 9, 2025), 2015 Michigan Residential Code (still in effect while the 2021 residential update remains enjoined), 2021 Michigan Rehabilitation Code (effective April 9, 2025), 2021 Michigan Mechanical and Plumbing Codes (effective March 12, 2024), 2023 National Electrical Code with Michigan amendments (effective March 12, 2024), and 2021 Michigan Commercial Energy Code (effective April 22, 2025). Local agencies may administer these codes under their delegated authority. Michigan LARA states that ordinary repairs may be performed without a building permit when they do not cut or remove structural members or required means of egress and do not affect regulated standpipe, water, sewer, drainage, gas, electrical, mechanical, public-health, or general-safety systems. Exemptions do not authorize code-violating work. Confirm cosmetic, accessory, agricultural, and minor-work exemptions with the applicable city or township because Genesee County has no countywide building-permit program.