County Permit SearchU.S. compliance directory
MichiganShiawassee County

Administrative overview · FIPS 26155

Shiawassee County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Shiawassee County Community Development Department - Building & Trades

For a project in or near Shiawassee County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(989) 743-2396; inspection request line (989) 743-2280

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Surbeck Building, 201 N. Shiawassee Street, Third Floor, Corunna, MI 48817

Operating hours

Monday-Friday, 8:00 a.m.-12:00 p.m. and 1:00 p.m.-5:00 p.m.

Review expectation

N/A; no fixed review timeline was published. Applications will not be processed until required documentation is received, including plans and any applicable zoning, health, soil-erosion, driveway, and energy-code documents.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Shiawassee County

Who handles permitting for this jurisdiction?

Shiawassee County Community Development Department - Building & Trades is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (989) 743-2396; inspection request line (989) 743-2280.

How long might review take?

N/A; no fixed review timeline was published. Applications will not be processed until required documentation is received, including plans and any applicable zoning, health, soil-erosion, driveway, and energy-code documents.

How are inspections scheduled?

Call the inspection request line at (989) 743-2280, the office at (989) 743-2396, or email comdev@shiawassee.net. Provide the project address, permit type, inspection type, requester contact information, and site-access instructions. Building inspections are performed Monday-Thursday, electrical Monday and Thursday, and mechanical/plumbing Tuesdays. Do not cover work until approvals are posted; additional inspections and re-inspections may incur fees.

Which codes and exemptions should I review?

Michigan LARA's current Statewide Jurisdiction List identifies Shiawassee County as County-enforced for building, electrical, mechanical, and plumbing. The county provides services for the majority of communities; Corunna, Durand, Perry, New Lothrop, Caledonia, Owosso Township, and Vernon Township are local for all four or most disciplines, while other listed municipal units are county-enforced, and Lennon has state enforcement for electrical, mechanical, and plumbing. The current Michigan framework includes the 2021 Michigan Building Code, 2015 Michigan Residential Code for one- and two-family dwellings while the proposed 2021 residential update is stayed, 2021 Michigan Mechanical and Plumbing Codes, 2023 National Electrical Code with Michigan amendments, and current Michigan energy and rehabilitation provisions. The county does not publish a single cosmetic-work exemption list. Separate permits are required for electrical, plumbing, heating, ventilating, and air-conditioning work. The county's soil-erosion waiver allows a qualifying earth change disturbing less than 225 square feet when it will not contribute sediment to lakes or streams; other zoning, soil-erosion, pool, deck, agricultural, and accessory-structure rules vary by project and should be confirmed with Community Development.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?