County Permit SearchU.S. compliance directory
MichiganLivingston County

Administrative overview · FIPS 26093

Livingston County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Livingston County Building Department

For a project in or near Livingston County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

517-546-3240; automated inspection request line: 517-546-3830

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Livingston County Building Department, 2300 E Grand River Ave, Howell, MI 48843

Operating hours

Office Monday-Friday 8:00 AM-5:00 PM; permitting Monday-Friday 8:00 AM-4:00 PM; closed county holidays

Review expectation

Average plan review time for a building submittal is 10 business days; inspection scheduling is available online or through the automated line.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Livingston County

Who handles permitting for this jurisdiction?

Livingston County Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 517-546-3240; automated inspection request line: 517-546-3830.

How long might review take?

Average plan review time for a building submittal is 10 business days; inspection scheduling is available online or through the automated line.

How are inspections scheduled?

Schedule online through BS&A or use the automated inspection request line at 517-546-3830; the county also provides a directory of building and trade inspectors. Inspectors will not enter an occupied residence unless someone age 18 or older is present. Do not cover work until required inspections are completed.

Which codes and exemptions should I review?

Livingston County Building Department enforces the Michigan Construction Code for its service area, with the City of Howell and Green Oak Township identified as local exceptions that issue their own permits. Current Michigan codes include the 2021 Michigan Building Code and 2021 Michigan Rehabilitation Code (effective April 9, 2025), 2015 Michigan Residential Code, 2021 Michigan Mechanical and Plumbing Codes (effective March 12, 2024), 2021 Michigan Commercial Energy Code (effective April 22, 2025), and 2023 Michigan Electrical Code/NEC (effective March 12, 2024). Michigan ordinary repairs may be exempt when they do not cut or remove structural members, change required egress, or affect regulated plumbing, electrical, mechanical, or other public-safety systems. Construction documents may be waived when compliance is clear. Confirm any additional exemption with the county or the local authority, especially for City of Howell and Green Oak Township projects.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?