Who issues permits
Washtenaw County Building Inspection Department is the county office listed for building permits in Washtenaw County.
How to get a permit in Washtenaw County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the Tyler EnerGov Citizen Self Service portal at prodpermits.ewashtenaw.org, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Washtenaw County permit records
The listing’s online portal is at prodpermits.ewashtenaw.org ↗ and runs on Tyler EnerGov Citizen Self Service. Use the portal’s Search to find permits, plans and inspections by permit number or address.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Washtenaw County Building Inspection Department at (734) 222-3900. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Washtenaw County Building Inspection Department publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Washtenaw County Building Inspection provides county enforcement of Michigan's State Construction Code for building, electrical, mechanical, and plumbing systems in the county jurisdictions it serves. The current Michigan framework includes the 2021 Michigan Building Code, 2015 Michigan Residential Code for one- and two-family dwellings while the proposed 2021 residential update is stayed, 2021 Michigan Mechanical and Plumbing Codes, 2023 National Electrical Code with Michigan amendments, and current Michigan energy and rehabilitation provisions. Local zoning approval and other agency approvals may also be required before issuance.
Michigan: statewide code. Details
Work that may not need a permit
The county's applications identify limited plan-review exceptions rather than a single cosmetic-work list. Examples include certain small electrical systems, minor mechanical alterations as determined by the official, and specified one- and two-family mechanical work; no work may be concealed before inspection. Confirm whether ordinary repairs, reroofing, siding, decks, pools, or accessory structures require a permit before starting.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Schedule required building, electrical, mechanical, and plumbing inspections through the county's automated inspection system at (866) 458-7358, available 24 hours a day, or through the permit portal. Provide the permit number and job address, keep work accessible and uncovered until approval, and request inspections as construction progresses. The county's current trade application instructs applicants to give advance notice and states that a visible permit number is required.
Work without a permit
Construction or remodeling must not begin before the required permit is obtained, and work must not be concealed before inspection. County materials state that permits become invalid if authorized work does not start within six months or is suspended or abandoned for six months; cancelled permits cannot be refunded or reinstated. The current mechanical application states that failure to post the permit or permit number visibly from the street results in a $50 reinspection fee. State licensing-law violations can carry civil fines; no general after-the-fact double permit fee was published.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at (734) 222-3900 about:
- Review times: how long plan review currently takes. No fixed plan-review turnaround was published. Plans must be submitted and approved before a permit is issued, and the application must include required zoning, health, soil-erosion, and other applicable approvals.
- Zoning: the zoning map or ordinance for your parcel. Zoning compliance is handled by the applicable city or township, while the county building process requires applicable zoning approval. The county provides GIS and planning resources but no single zoning ordinance for all local jurisdictions.
Michigan rules that apply in Washtenaw County
These rules come from Michigan law and state agencies, so they apply in Washtenaw County on top of anything the local office requires.
Building code
Statewide code
The State Construction Code applies everywhere in Michigan. For one- and two-family homes, the Michigan Residential Code is still based on the 2015 International Residential Code (R 408.30500). The state filed rules adopting a 2021-based residential code and residential energy code on May 1, 2025, with an effective date of August 29, 2025.
Read more
In July 2025, before that date, Judge James Robert Redford of the Michigan Court of Claims signed a stipulated order in a suit brought by the Home Builders Association of Michigan and the Michigan Manufactured Housing Association. Under that order LARA agreed not to implement the 2021 residential and residential energy rules while the case continues, so the 2015 residential code and the residential provisions of the 2015 energy code still apply. Other parts of the code have moved ahead. The Michigan Building Code (2021 IBC) took effect April 9, 2025. The Michigan Electrical Code (2023 NEC, second printing, with Michigan amendments) and the Michigan Plumbing Code (2021 IPC) took effect March 12, 2024. The Michigan Mechanical Code (2021 IMC) took effect March 12, 2024.
Michigan Department of Licensing and Regulatory Affairs (LARA), Bureau of Construction Codes ↗
Outside city limits
Michigan has no unincorporated land in the usual sense. Land outside cities and villages lies in townships. Under the State Construction Code Act (MCL 125.1508b), a city, village, township or county may take on enforcement of the code by ordinance and designate an enforcing agency.
Read more
Where no local government has done so, the state is responsible, and LARA's Bureau of Construction Codes issues permits and does inspections directly. A local government that drops enforcement must rescind its ordinance, and the change takes effect 12 months later. Some places enforce one trade locally while the state handles another, so check who issues building, electrical, plumbing and mechanical permits for your address. Ask your township, city or village first, then the county, then LARA.
Contractor and trade licensing
Michigan licenses residential builders and residential maintenance and alteration contractors under Article 24 of the Occupational Code (1980 PA 299). A license is needed for residential work where the total contract price for one project, including labor and materials, is $600 or more.
Read more
Splitting a larger job into smaller contracts to stay under $600 is not allowed. The law exempts several groups, including a property owner working on a structure for the owner's own use and occupancy, an owner of rental property doing maintenance and alteration on that property, and licensed electrical, plumbing and mechanical contractors doing their own trade's work. Homeowners can pull their own permits for a single-family home they occupy or will occupy and can act as their own general contractor. Anyone they hire must hold the right license, and section 23a of the State Construction Code Act (MCL 125.1523a) sets civil fines for conspiring to get around the licensing requirements.
Electrical, plumbing and HVAC
Electrical, plumbing and mechanical (HVAC) contractors and workers are licensed by the state under the Skilled Trades Regulation Act (2016 PA 407). Each trade has a homeowner exception.
Read more
The electrical article does not require a license for installation, alteration or repair of electrical equipment by a homeowner in a single-family home and its outbuildings that the homeowner owns and occupies or will occupy (section 737). The mechanical article lets the owner of a single-family home that is or will become their residence install a heating or refrigerating system personally, if the owner affirms this on the permit application, gets the permit and gets the final inspection (section 819). Otherwise, plumbing permits are issued only to licensed plumbing contractors (section 1125). Local plumbing permit forms include a homeowner affidavit for work the owner does personally in a single-family home they live in or are about to occupy. Permits and inspections for all three trades come from the local enforcing agency, or from LARA's Bureau of Construction Codes where no local agency enforces that trade.
State programs that can affect your permit
Soil erosion and sedimentation control (Part 91)
Under Part 91 of the Natural Resources and Environmental Protection Act (1994 PA 451), a soil erosion permit is generally needed for earth changes that disturb more than one acre, or for any earth change within 500 feet of a lake or stream. These permits are separate from building permits. They come from the county enforcing agency, often the drain commissioner, or from a city, village or township that enforces Part 91 itself. Many counties add their own triggers, such as work near county drains, wetlands or steep slopes.
Manufactured home installation
LARA's Bureau of Construction Codes writes the state's manufactured housing rules. Homes must be installed according to the manufacturer's written instructions and anchored. Permits for footings, accessories and the installation of the home come from the enforcing agency under the State Construction Code Act (R 125.1602).
Verified October 28, 2026 against Michigan sources. Michigan permit rules, sources and other counties
Common projects in Washtenaw County
Michigan has statewide rules on file for 4 of these projects; they apply in Washtenaw County along with local permit requirements.
Decks
Under R 408.30505, a deck needs no building permit only if it is 200 square feet or less, no more than 30 inches above grade, not attached to the house, not within 36 inches of the house and does not serve an entry door. Other decks need a permit.
Also named in Washtenaw County’s exemption summary.
Fences
Under R 408.30505, a fence no more than 7 feet high does not need a building permit under the residential code. Local zoning rules on fence height and placement still apply.
Sheds and accessory buildings
Under the current Michigan Residential Code rules (R 408.30505), a one-story detached accessory structure with a floor area of 200 square feet or less does not need a building permit. The exemption does not excuse the structure from meeting the code.
Also named in Washtenaw County’s exemption summary.
Michigan source: law.cornell.edu ↗ · Sheds and accessory buildings permit guide
Electrical work
The Michigan Electrical Code (2023 NEC, second printing, with Michigan amendments, effective March 12, 2024) governs electrical installations statewide. Electrical permits come from the local enforcing agency, or from LARA's Bureau of Construction Codes where no local agency enforces electrical.
Also named in Washtenaw County’s exemption summary.
Michigan source: law.cornell.edu ↗ · Electrical work permit guide
Named in Washtenaw County’s exemption summary (read it before assuming the work is exempt): Roof replacement · Heating and air conditioning · Pools and spas
Guides for other projects: Water heaters · Rooftop solar · Accessory dwelling units · Demolition · Plumbing work · Septic systems · Driveways and culverts · Floodplain development · All 21 project guides
Other permits you may need in Washtenaw County
These are separate from the building permit and come from the agencies named, under Michigan rules.
Septic system
Local health department (county or district)
Septic permits come from the county or district health department under its local sanitary code, so requirements vary by county. In Grand Traverse County, for example, the health department evaluates soil, groundwater and distance to surface water before issuing a permit, and the system needs a final inspection before it is used.
Floodplain development
Michigan Department of Environment, Great Lakes, and Energy (EGLE)
Michigan requires a state permit from EGLE under Part 31 of the Natural Resources and Environmental Protection Act to occupy, fill or grade land in the 100-year floodplain of a river or stream whose watershed is 2 square miles or more (R 323.1311 to 323.1329). A copy of each application goes to the local government before EGLE acts.
Official page: ars.apps.lara.state.mi.us ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Erosion and sediment control
County or municipal enforcing agency (Part 91, EGLE rules)
A Part 91 soil erosion and sedimentation control permit is required before an earth change that disturbs one acre or more or lies within 500 feet of a lake or stream (R 323.1704), and no building permit may be issued until it is granted (R 323.1711).
Read more
Construction stormwater coverage is automatic for 1 to 5 acres; larger sites file a notice of coverage with EGLE (R 323.2190).
Water well
Local health department (state Well Construction Code)
Private well permits come from the local health department. In Grand Traverse County, for example, the Environmental Health Division reviews the proposed location and issues a well construction permit, which the owner gives to a registered well driller. Wells must meet the state Well Construction Code (R 325.1601 and following) under Part 127 of the Public Health Code.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
- Agency websitewww.washtenaw.org ↗
- Permit portalprodpermits.ewashtenaw.org ↗
- Application instructionscontent.civicplus.com ↗
- Fee schedulecontent.civicplus.com ↗
https://content.civicplus.com/api/assets/mi-washtenawcounty/52b39241-1db8-483f-8f4d-7804f681cc95?cache=1800 (current mechanical permit application and fee chart; building fees are calculated through the county application/portal)
- Contractor license lookupwww.michigan.gov ↗
Common questions
Does the Washtenaw County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at (734) 222-3900 if you are unsure.
Can I apply for a permit online in Washtenaw County?
Yes. The listing includes an online permit portal at prodpermits.ewashtenaw.org. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Washtenaw County?
Washtenaw County Building Inspection Department publishes its fee schedule online (content.civicplus.com). Look up your project type there, and ask the office at (734) 222-3900 for an estimate if your project is not listed.
How do I look up past permits for an address in Washtenaw County?
Start with the Tyler EnerGov Citizen Self Service portal at prodpermits.ewashtenaw.org and search by address, parcel or permit number. If an older permit is not there, ask the office at (734) 222-3900 for the file or send a public records request.
Can I check a contractor's license for work in Washtenaw County?
Yes, at michigan.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Washtenaw County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Washtenaw County borders Jackson County, Lenawee County, Livingston County, Monroe County, Oakland County, Wayne County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Washtenaw County.
