County Permit SearchU.S. compliance directory
MichiganWexford County

Administrative overview · FIPS 26165

Wexford County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Wexford County Building Department

For a project in or near Wexford County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(231) 779-9465

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Wexford County Building Department, 401 N. Lake Street, Cadillac, MI 49601

Operating hours

Monday-Thursday, 8:30 a.m.-5:00 p.m., closed 12:00-12:30 p.m. for lunch; closed Fridays.

Review expectation

N/A; no fixed plan-review timeline was published. Commercial projects must submit a plan-review fee with the application, and complete applications and required zoning or environmental approvals are needed before issuance.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Wexford County

Who handles permitting for this jurisdiction?

Wexford County Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (231) 779-9465.

How long might review take?

N/A; no fixed plan-review timeline was published. Commercial projects must submit a plan-review fee with the application, and complete applications and required zoning or environmental approvals are needed before issuance.

How are inspections scheduled?

A minimum 24-hour notice is required for all inspections. Call (231) 779-9465: building inspections are available Tuesday-Thursday, electrical Friday, plumbing Tuesday, and mechanical Thursday. The permit holder must keep work accessible for inspection and arrange required inspections with the department.

Which codes and exemptions should I review?

The Wexford County Building Department issues building, electrical, mechanical, and plumbing permits for all county areas except the City of Cadillac, City of Manton, and Cedar Creek Township, which have their own programs. The county page identifies the 2015 Michigan Residential Code for residential construction and the 2021 Michigan Building Code for commercial construction, and states that the 2023 National Electrical Code and 2023 Michigan Electrical Code took effect March 12, 2024. Applicable Michigan plumbing, mechanical, energy, rehabilitation, and other State Construction Code provisions also apply; verify any later LARA update before filing. The county publishes an Agricultural Exemption Application for buildings used exclusively for agricultural purposes, subject to zoning approval. Its Soil Erosion and Sedimentation Control materials publish a waiver for qualifying projects within 500 feet of a lake, river, or stream that disturb less than 225 square feet or finish within 24 hours. Other minor or cosmetic building exemptions are not consolidated on the page; confirm with the Building Department before starting.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?