Who issues permits

Grand Traverse County Construction Code is the county office listed for building permits in Grand Traverse County.

Also listed: Building Department.

How to get a permit in Grand Traverse County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the Tyler EnerGov Citizen Self Service portal at codespermits.grandtraverse.org, or with the published application forms.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

Minimum two weeks for plan review; commercial plan review may take longer. Trade plan reviews are separate from building plan review and carry a $75 per-trade review fee.

Search Grand Traverse County permit records

The listing’s online portal is at codespermits.grandtraverse.org ↗ and runs on Tyler EnerGov Citizen Self Service. Use the portal’s Search to find permits, plans and inspections by permit number or address.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Grand Traverse County Construction Code at 231-995-6044. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Grand Traverse County Construction Code publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

The department publishes the 2021 Michigan Building Code, 2021 Rehabilitation Code, 2021 Michigan Energy Code, 2023 Michigan Electrical Code, 2021 Michigan Mechanical Code, and 2021 Michigan Plumbing Code. Its notice also states that the 2015 Michigan Residential Code and 2015 Residential Energy Code remain in effect until further notice while the state's residential-code update is under review. The county has construction-code authority except in local units that have designated their own agency; the statewide list identifies Traverse City as local and Garfield Township as local for building, electrical, and plumbing, with county enforcement for most other listed units.

Michigan: statewide code. Details

Work that may not need a permit

Grand Traverse County states that all building permits require plan review, but some remodels may not require a separate township land-use permit depending on the project and township. Michigan's ordinary-repair exemption may apply where work does not affect structural members, required egress, regulated plumbing, electrical, mechanical, public-health, or general-safety systems. Exemptions do not authorize code violations; confirm any minor, cosmetic, agricultural, or accessory-work exemption with the county or the applicable local enforcing agency.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Apply and request inspections through EPIC-GT. Inspection requests should include the site address, permit number, inspection type, requested date, and site contact name and telephone number. Disconnect/reconnect and sewer/water inspections require prior approval from office staff; voicemail or online requests are not accepted for those categories. The county posts a daily inspection list updated each weekday between approximately 9:30 and 10:30 AM.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Grand Traverse County's fee schedule lists a $55 charge for work started without a permit, in addition to the applicable permit costs. The minimum building permit fee is $165 and includes one inspection. Work must be approved and fees paid before construction; the enforcing agency may issue correction or stop-work orders and pursue other remedies under the Michigan construction code and local ordinances.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Michigan rules that apply in Grand Traverse County

These rules come from Michigan law and state agencies, so they apply in Grand Traverse County on top of anything the local office requires.

Building code

Statewide code

The State Construction Code applies everywhere in Michigan. For one- and two-family homes, the Michigan Residential Code is still based on the 2015 International Residential Code (R 408.30500). The state filed rules adopting a 2021-based residential code and residential energy code on May 1, 2025, with an effective date of August 29, 2025.

Read more

In July 2025, before that date, Judge James Robert Redford of the Michigan Court of Claims signed a stipulated order in a suit brought by the Home Builders Association of Michigan and the Michigan Manufactured Housing Association. Under that order LARA agreed not to implement the 2021 residential and residential energy rules while the case continues, so the 2015 residential code and the residential provisions of the 2015 energy code still apply. Other parts of the code have moved ahead. The Michigan Building Code (2021 IBC) took effect April 9, 2025. The Michigan Electrical Code (2023 NEC, second printing, with Michigan amendments) and the Michigan Plumbing Code (2021 IPC) took effect March 12, 2024. The Michigan Mechanical Code (2021 IMC) took effect March 12, 2024.

Michigan Department of Licensing and Regulatory Affairs (LARA), Bureau of Construction Codes ↗

Outside city limits

Michigan has no unincorporated land in the usual sense. Land outside cities and villages lies in townships. Under the State Construction Code Act (MCL 125.1508b), a city, village, township or county may take on enforcement of the code by ordinance and designate an enforcing agency.

Read more

Where no local government has done so, the state is responsible, and LARA's Bureau of Construction Codes issues permits and does inspections directly. A local government that drops enforcement must rescind its ordinance, and the change takes effect 12 months later. Some places enforce one trade locally while the state handles another, so check who issues building, electrical, plumbing and mechanical permits for your address. Ask your township, city or village first, then the county, then LARA.

Contractor and trade licensing

Michigan licenses residential builders and residential maintenance and alteration contractors under Article 24 of the Occupational Code (1980 PA 299). A license is needed for residential work where the total contract price for one project, including labor and materials, is $600 or more.

Read more

Splitting a larger job into smaller contracts to stay under $600 is not allowed. The law exempts several groups, including a property owner working on a structure for the owner's own use and occupancy, an owner of rental property doing maintenance and alteration on that property, and licensed electrical, plumbing and mechanical contractors doing their own trade's work. Homeowners can pull their own permits for a single-family home they occupy or will occupy and can act as their own general contractor. Anyone they hire must hold the right license, and section 23a of the State Construction Code Act (MCL 125.1523a) sets civil fines for conspiring to get around the licensing requirements.

Electrical, plumbing and HVAC

Electrical, plumbing and mechanical (HVAC) contractors and workers are licensed by the state under the Skilled Trades Regulation Act (2016 PA 407). Each trade has a homeowner exception.

Read more

The electrical article does not require a license for installation, alteration or repair of electrical equipment by a homeowner in a single-family home and its outbuildings that the homeowner owns and occupies or will occupy (section 737). The mechanical article lets the owner of a single-family home that is or will become their residence install a heating or refrigerating system personally, if the owner affirms this on the permit application, gets the permit and gets the final inspection (section 819). Otherwise, plumbing permits are issued only to licensed plumbing contractors (section 1125). Local plumbing permit forms include a homeowner affidavit for work the owner does personally in a single-family home they live in or are about to occupy. Permits and inspections for all three trades come from the local enforcing agency, or from LARA's Bureau of Construction Codes where no local agency enforces that trade.

State programs that can affect your permit

Soil erosion and sedimentation control (Part 91)

Under Part 91 of the Natural Resources and Environmental Protection Act (1994 PA 451), a soil erosion permit is generally needed for earth changes that disturb more than one acre, or for any earth change within 500 feet of a lake or stream. These permits are separate from building permits. They come from the county enforcing agency, often the drain commissioner, or from a city, village or township that enforces Part 91 itself. Many counties add their own triggers, such as work near county drains, wetlands or steep slopes.

Official page: gtcountymi.gov ↗

Manufactured home installation

LARA's Bureau of Construction Codes writes the state's manufactured housing rules. Homes must be installed according to the manufacturer's written instructions and anchored. Permits for footings, accessories and the installation of the home come from the enforcing agency under the State Construction Code Act (R 125.1602).

Official page: law.cornell.edu ↗

Verified October 28, 2026 against Michigan sources. Michigan permit rules, sources and other counties

Common projects in Grand Traverse County

Michigan has statewide rules on file for 4 of these projects; they apply in Grand Traverse County along with local permit requirements.

  • Decks

    Under R 408.30505, a deck needs no building permit only if it is 200 square feet or less, no more than 30 inches above grade, not attached to the house, not within 36 inches of the house and does not serve an entry door. Other decks need a permit.

    Michigan source: law.cornell.edu ↗ · Decks permit guide

  • Fences

    Under R 408.30505, a fence no more than 7 feet high does not need a building permit under the residential code. Local zoning rules on fence height and placement still apply.

    Michigan source: law.cornell.edu ↗ · Fences permit guide

  • Sheds and accessory buildings

    Under the current Michigan Residential Code rules (R 408.30505), a one-story detached accessory structure with a floor area of 200 square feet or less does not need a building permit. The exemption does not excuse the structure from meeting the code.

    Michigan source: law.cornell.edu ↗ · Sheds and accessory buildings permit guide

  • Electrical work

    The Michigan Electrical Code (2023 NEC, second printing, with Michigan amendments, effective March 12, 2024) governs electrical installations statewide. Electrical permits come from the local enforcing agency, or from LARA's Bureau of Construction Codes where no local agency enforces electrical.

    Also named in Grand Traverse County’s exemption summary.

    Michigan source: law.cornell.edu ↗ · Electrical work permit guide

Named in Grand Traverse County’s exemption summary (read it before assuming the work is exempt): Heating and air conditioning · Plumbing work · Kitchen and bathroom remodels

Guides for other projects: Roof replacement · Water heaters · Rooftop solar · Pools and spas · Accessory dwelling units · Demolition · Septic systems · Driveways and culverts · All 21 project guides

Other permits you may need in Grand Traverse County

These are separate from the building permit and come from the agencies named, under Michigan rules.

  • Septic system

    Local health department (county or district)

    Septic permits come from the county or district health department under its local sanitary code, so requirements vary by county. In Grand Traverse County, for example, the health department evaluates soil, groundwater and distance to surface water before issuing a permit, and the system needs a final inspection before it is used.

    Official page: gtcountymi.gov ↗ · Septic permit guide

  • Floodplain development

    Michigan Department of Environment, Great Lakes, and Energy (EGLE)

    Michigan requires a state permit from EGLE under Part 31 of the Natural Resources and Environmental Protection Act to occupy, fill or grade land in the 100-year floodplain of a river or stream whose watershed is 2 square miles or more (R 323.1311 to 323.1329). A copy of each application goes to the local government before EGLE acts.

    Official page: ars.apps.lara.state.mi.us ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Erosion and sediment control

    County or municipal enforcing agency (Part 91, EGLE rules)

    A Part 91 soil erosion and sedimentation control permit is required before an earth change that disturbs one acre or more or lies within 500 feet of a lake or stream (R 323.1704), and no building permit may be issued until it is granted (R 323.1711).

    Read more

    Construction stormwater coverage is automatic for 1 to 5 acres; larger sites file a notice of coverage with EGLE (R 323.2190).

    Official page: ars.apps.lara.state.mi.us ↗

  • Water well

    Local health department (state Well Construction Code)

    Private well permits come from the local health department. In Grand Traverse County, for example, the Environmental Health Division reviews the proposed location and issues a well construction permit, which the owner gives to a registered well driller. Wells must meet the state Well Construction Code (R 325.1601 and following) under Part 127 of the Public Health Code.

    Official page: gtcountymi.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Grand Traverse County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 231-995-6044 if you are unsure.

Can I apply for a permit online in Grand Traverse County?

Yes. The listing includes an online permit portal at codespermits.grandtraverse.org. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Grand Traverse County?

Grand Traverse County Construction Code publishes its fee schedule online (gtcountymi.gov). Look up your project type there, and ask the office at 231-995-6044 for an estimate if your project is not listed.

How do I look up past permits for an address in Grand Traverse County?

Start with the Tyler EnerGov Citizen Self Service portal at codespermits.grandtraverse.org and search by address, parcel or permit number. If an older permit is not there, ask the office at 231-995-6044 for the file or send a public records request.

Can I check a contractor's license for work in Grand Traverse County?

Yes, at michigan.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Grand Traverse County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Grand Traverse County borders Antrim County, Benzie County, Kalkaska County, Leelanau County, Manistee County, Missaukee County, and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Grand Traverse County.