Administrative overview · FIPS 26019

Benzie County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Benzie County Building Safety and Code Enforcement Department

For a project in or near Benzie County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

231-882-9673; 24-hour inspection request line 231-882-9674

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Lower Level, Government Center, 448 Court Place, Beulah, MI 49617

Operating hours

Monday-Friday, 8:00 a.m.-12:00 p.m. and 1:00-5:00 p.m.; a Springdale Township notice lists the same department as 8:00 a.m.-5:00 p.m. with noon closure

Review expectation

The county’s permitting guide states that when plans contain the correct information, plan review should take approximately 10 business days. Actual timing varies with completeness, project type, required zoning or environmental approvals, and inspector availability.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Benzie County

Who handles permitting for this jurisdiction?

Benzie County Building Safety and Code Enforcement Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 231-882-9673; 24-hour inspection request line 231-882-9674.

How long might review take?

The county’s permitting guide states that when plans contain the correct information, plan review should take approximately 10 business days. Actual timing varies with completeness, project type, required zoning or environmental approvals, and inspector availability.

How are inspections scheduled?

Use the 24-hour inspection request line at 231-882-9674 or contact the department at 231-882-9673. The department performs inspections for all trades and state-code compliance; the permit holder must keep work accessible and request the required inspections before covering or advancing construction stages.

Which codes and exemptions should I review?

Current Michigan codes identified by LARA for 2026: 2021 Michigan Building Code (effective April 9, 2025); 2015 Michigan Residential Code (current code, effective February 8, 2016, with later 2021 residential rules held by court order); 2021 Michigan Rehabilitation Code; 2021 Michigan Mechanical Code; 2021 Michigan Plumbing Code; 2023 National Electrical Code/Michigan Electrical Code (effective March 12, 2024); and 2021 Michigan Commercial Energy Code (effective April 22, 2025). The county department administers and enforces the applicable state codes; local zoning and special overlays remain separate. Michigan exemptions include one-story detached sheds or playhouses up to 120 square feet, fences up to 7 feet, qualifying retaining walls, certain low sidewalks and driveways, painting/papering/tiling/carpeting/cabinets/countertops and similar finish work, qualifying above-ground pools under 24 inches deep, agricultural shade-cloth structures, playground equipment, qualifying awnings and specified movable fixtures. Ordinary repairs are exempt only when they do not affect structural supports, egress, regulated systems, public health or general safety. Confirm any exemption with the county building official, especially for work also requiring zoning, soil-erosion, health, critical-dune or other approvals.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?