Missouri building permits
Missouri is one of the few states with no statewide building code for private homes. Each city, and each county with the legal authority, decides whether to adopt a code, which edition to use and whether to issue building permits. Many rural counties have no county building code, so a house outside city limits may need no building permit at all, though septic, floodplain and manufactured-home rules from the state can still apply. The only statewide construction license is an optional electrical contractor license.
- Local profiles
- 115
- Link an online portal
- 16 (14%)
- City or town offices
- 84
- County office
- 31
How permits work in Missouri
Building codes
No statewide code
Missouri has no state building, residential, plumbing, mechanical or energy code for private houses. Cities adopt their own codes, and counties of the first and second classification may adopt a building and electrical code for their unincorporated areas under RSMo 64.170 to 64.200. A county that had not adopted a code under those sections before August 28, 2001 needs voter approval first, and the vote is held only among voters in the affected area. Under RSMo 64.196, any county code adopted or amended under these sections must be a nationally recognized building code from calendar year 1999 or later. Editions therefore vary from place to place, and you have to ask the local office which ones it uses. The U.S. Department of Energy lists Missouri as a home-rule state for both residential and commercial energy codes. In the 2026 session, the Missouri Building Codes Act (SB 1431), which would have created a statewide code and a state building code commission, did not pass. Neither did HB 2384, which would have barred local energy requirements stricter than the 2009 IECC.
No state building code agency; codes are adopted by cities and eligible counties
Outside city limits
Outside city limits, whether you need a building permit depends on the county. A first or second class county may adopt a building code for its unincorporated area, and if it does, the county commission appoints a building commission and enforces the code there (RSMo 64.180). Counties that had no code before August 28, 2001 need a public vote to adopt one. Many rural counties have never adopted a building code, so they issue no building permits for houses. A county may still have zoning, a floodplain development permit or a septic ordinance, and county zoning in second and third class counties under RSMo 64.620 does not reach farm buildings outside the mapped flood hazard area. Call the county commission or county planning office to find out what applies to your parcel.
Contractors and owner-builders
Missouri does not license general contractors or home builders at the state level, and has no state plumbing or HVAC contractor license. Those trades are licensed, if at all, by cities and counties. The one statewide license is the electrical contractor license under RSMo 324.900 to 324.945, issued by the Office of Statewide Electrical Contractors in the Division of Professional Registration. It is optional. A contractor who works only where no local license is required, or who already holds the local license, does not need it (RSMo 324.920). Where a contractor does hold it, cities and counties must accept it in place of their own exam-based license and let the holder pull permits, but they can still require permits, inspect work, enforce local codes and require a business license (RSMo 324.925). Applicants need $500,000 in liability insurance and must post any bond a city or county requires. The state sets no owner-builder rule. Whether a homeowner can pull a building, electrical or plumbing permit is decided by each city or county that issues permits.
Missouri Division of Professional Registration, Office of Statewide Electrical Contractors · Look up a license
Electrical, plumbing, and HVAC
Electrical contractors can hold an optional statewide license from the Office of Statewide Electrical Contractors, which began taking applications on July 1, 2019. Cities and counties that had electrical licensing authority before August 28, 2017 can still issue local contractor licenses and license individual electricians, and they must recognize the statewide license (RSMo 324.925). Plumbing, HVAC and individual electrician licensing is handled locally. Missouri has no state-run electrical, plumbing or mechanical permit or inspection program for houses, so these permits come from your city or county if it issues them. Manufactured home installers are the exception: they are licensed statewide by the Public Service Commission.
State programs that can affect your permit
- Onsite wastewater (septic) permits
A construction permit is needed before you install, or make a major modification or repair to, most onsite sewage systems (RSMo 701.046). Depending on the county, permits are issued by the DHSS Onsite Wastewater Treatment Program, by a local health agency under contract, or by a county under its own ordinance, which can be stricter than the state standard. State law excludes some large lots: a single-family lot of three acres or more, or a residential lot of ten acres or more meeting density and spacing conditions, where every part of the system is more than ten feet from the property line. Lots next to lakes run by the Corps of Engineers or a public utility do not qualify (RSMo 701.031). Check with the permitting authority before relying on an exemption. DHSS says application fees are temporarily suspended from August 28, 2026, after SB 914 removed the old $90 statutory fee.
- Manufactured home installer licensing
Anyone in the business of installing manufactured homes in Missouri must hold an installer license from the Missouri Public Service Commission. Cities and counties cannot require their own installer license on top of it. You do not need the license to install a manufactured home on your own property that you will live in (RSMo 700.656).
- Floodplain management (NFIP)
The Floodplain Management Section of the State Emergency Management Agency (SEMA) runs the National Flood Insurance Program in Missouri. Cities and counties that take part in the program agree to adopt and enforce a floodplain ordinance, so building in a mapped flood zone usually needs a local floodplain development permit even where there is no building code. SEMA keeps a directory of local floodplain administrators.
Missouri county directory
115 local profiles
Portal links an online permit portal (16). Fees links a fee schedule (18). Most profiles point to city or town offices; other listing types are labeled.
A
B
C
D
F
G
H
I
J
K
L
M
N
O
P
R
S
T
V
W
Profiles marked “City or town offices” point to municipal permit offices because the county does not issue general building permits.
Missouri permit questions
Does Missouri have a statewide building code?
No. Missouri has no statewide building or residential code for private homes. Each city, and each county with authority under state law, picks its own code and edition. A 2026 bill to create a statewide code (SB 1431) did not pass. Ask your city or county building office which codes it has adopted.
Do I need a building permit to build a house in rural Missouri?
It depends on the county. Many rural counties have never adopted a building code, so they issue no building permits for houses. Even then, you may need a septic permit from DHSS or your local health agency, a floodplain development permit if the site is in a mapped flood zone, and any county zoning approval. Inside city limits, the city's rules apply.
Can a Missouri county adopt a building code?
A first or second class county can adopt a building and electrical code for its unincorporated area under RSMo 64.170 to 64.200. If the county had not adopted one before August 28, 2001, voters in the affected area must approve the authority first. Any code adopted or amended under these sections must be a nationally recognized building code from 1999 or later.
Does Missouri require a state contractor license?
Not for general contractors, home builders, plumbers or HVAC contractors. Those are licensed locally, if at all. Electrical contractors can get an optional statewide license that every city and county must accept in place of its own exam-based license. Check the state license search, and also ask your city or county about local licenses.
Do I need a permit for a septic system in Missouri?
Usually yes. State law requires a construction permit before installing, or making a major modification or repair to, most onsite sewage systems. Some large single-family lots of three or ten acres are excluded if they meet the statute's conditions, and county ordinances can be stricter. Confirm with the DHSS Onsite Wastewater Treatment Program or your local health agency before you start.
Permit guides for common projects
What the model codes say, what local offices often change and what to ask.
- How to get a building permit
- Building permit costs
- Looking up permit records
- Work done without a permit
- Decks
- Fences
- Sheds and accessory buildings
- Roof replacement
- Water heaters
- Heating and air conditioning
- Electrical work
- Rooftop solar
- Pools and spas
- Accessory dwelling units
- Plumbing work
- Kitchen and bathroom remodels
- Demolition
- Septic systems
- Driveways and culverts
- Floodplain development
- Home additions and garages
- Window and door replacement
- Generators and EV chargers
- Manufactured and mobile homes
- Owner-builder permits
Sources
- RSMo 64.170: County building codes, first and second class countiesrevisor.mo.gov
- RSMo 64.180: County building commission and code of regulationsrevisor.mo.gov
- RSMo 64.196: Nationally recognized building code requiredrevisor.mo.gov
- RSMo 64.620: County zoning in second and third class countiesrevisor.mo.gov
- RSMo 324.920: Statewide electrical contractor license requirementsrevisor.mo.gov
- RSMo 324.925: Political subdivisions must recognize statewide electrical licenserevisor.mo.gov
- Missouri DCI: Office of Statewide Electrical Contractors begins accepting applicationsdci.mo.gov
- Missouri Division of Professional Registration license search (MOPRO)mopro.mo.gov
- RSMo 700.656: Manufactured home installer licenserevisor.mo.gov
- Missouri DHSS: OWTS construction permit processhealth.mo.gov
- Missouri DHSS: OWTS construction permit requiredhealth.mo.gov
- RSMo 701.046: Onsite sewage construction permitrevisor.mo.gov
- RSMo 701.031: Onsite sewage lot exclusionsrevisor.mo.gov
- SEMA Floodplain Managementsema.dps.mo.gov
- U.S. DOE Building Energy Codes Program: Missourienergycodes.gov
- St. Louis County Municipal League: 2026 Legislative Session Summarystlmuni.org
Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction