County Permit SearchU.S. compliance directory
MissouriCamden County

Administrative overview · FIPS 29029

Camden County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Camden County Planning and Zoning

For a project in or near Camden County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

573-317-3860 (Planning and Zoning); 573-346-4440 ext. 1350

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Camden County Planning and Zoning, 182 Ha Ha Tonka Cut Thru, Camdenton, MO 65020; mailing address 1 Court Circle NW, Suite 15, Camdenton, MO 65020

Operating hours

Monday-Friday, 8:00 AM-4:00 PM for Planning and Zoning; general county hours are 8:30 AM-4:30 PM.

Review expectation

The Unified Land-Use Code states a complete permit is issued within a reasonable time after staff review and site visit; no fixed number of days is published. Construction permits are valid for one year, with a single six-month extension available.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Camden County

Who handles permitting for this jurisdiction?

Camden County Planning and Zoning is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 573-317-3860 (Planning and Zoning); 573-346-4440 ext. 1350.

How long might review take?

The Unified Land-Use Code states a complete permit is issued within a reasonable time after staff review and site visit; no fixed number of days is published. Construction permits are valid for one year, with a single six-month extension available.

How are inspections scheduled?

Submit a completed application, scaled sketch/site plan, proof of ownership, and applicable fire, water, sewer, MoDOT, MDNR, highway, and wastewater approvals. The county conducts a site visit for setbacks before issuing the permit. The published inspection preparation instructions identify a structure-location survey inspection, foundation inspection after footing excavation/forms, and a substantially-complete structure inspection; contact Planning and Zoning at 573-317-3860 to coordinate field inspection.

Which codes and exemptions should I review?

N/A for a named International Building Code edition. Camden County enforces its current Unified Land-Use Code, including the 2026 revisions, for zoning/construction permits in the county planning jurisdiction. The code requires Planning Administrator approval for all residential, commercial, office, industrial, and non-agricultural structures 400 square feet or larger; agricultural structures are excepted from the construction-permit requirement. A construction permit is not required for agricultural structures. Non-agricultural accessory structures under 400 square feet are outside the listed construction-permit threshold, although other zoning, wastewater, fire-district, floodplain, or land-use requirements may still apply. Agricultural activities and residential site development disturbing less than one acre are exempt from a Land Disturbance Permit; emergency or corrective county work involving public safety is also exempt from that permit.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?