Who issues permits

St. Louis County Department of Transportation and Public Works is the county office listed for building permits in St. Louis County.

Also listed: Code Enforcement-Permits Processing.

How to get a permit in St. Louis County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the Accela Citizen Access portal at aca.stlouisco.com.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  5. Get the final approval and keep it with the approved plans and receipts.

Search St. Louis County permit records

The listing’s online portal is at aca.stlouisco.com ↗ and runs on Accela Citizen Access. Open the Building (or Permits) tab and use its record search to look up permits by address, parcel or record number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask St. Louis County Department of Transportation and Public Works at 314-615-5184. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Building codes and exemptions

Codes referenced

2015 International Building Code (Chapter 1115), 2015 International Residential Code (Chapter 1116), 2015 International Property Maintenance Code (Chapter 1110), 2014 National Electrical Code/NFPA 70 (Chapter 1102), 2015 Uniform Plumbing Code (Chapter 1103), plus county land-disturbance and applicable zoning codes and amendments. County enforcement applies in unincorporated areas and municipalities contracting with the county for plan review/inspection.

Missouri: no statewide code. Details

Scheduling inspections

Submit plans and permit applications through the county permit drop box/mail-in process or the e-permits portal. For inspection questions call 314-615-4677; general permit-processing questions call 314-615-5184. Residential occupancy inspections are scheduled by county staff, with the cited occupancy form stating contact within 48 hours.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

St. Louis County code provides that anyone starting building, electrical, gas, mechanical, or plumbing work before obtaining required permits is subject to a no-permit penalty fee established by the building official under Section 114.4.1, in addition to the required permit fees; county enforcement can also require corrective/removal work.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 314-615-5184 about:

  • Fees: the current fee schedule and an estimate for your project.
  • Exempt work: which minor work needs no permit. The county publishes project-specific residential/commercial guides, but the reviewed official permit pages did not provide one consolidated 2026 list of minor or cosmetic exemptions.
  • Review times: how long plan review currently takes. The county publishes the workflow but no standard 2026 review time on the reviewed official pages.

Missouri rules that apply in St. Louis County

These rules come from Missouri law and state agencies, so they apply in St. Louis County on top of anything the local office requires.

Building code

No statewide code

Missouri has no state building, residential, plumbing, mechanical or energy code for private houses. Cities adopt their own codes, and counties of the first and second classification may adopt a building and electrical code for their unincorporated areas under RSMo 64.170 to 64.200.

Read more

A county that had not adopted a code under those sections before August 28, 2001 needs voter approval first, and the vote is held only among voters in the affected area. Under RSMo 64.196, any county code adopted or amended under these sections must be a nationally recognized building code from calendar year 1999 or later. Editions therefore vary from place to place, and you have to ask the local office which ones it uses. The U.S. Department of Energy lists Missouri as a home-rule state for both residential and commercial energy codes. In the 2026 session, the Missouri Building Codes Act (SB 1431), which would have created a statewide code and a state building code commission, did not pass. Neither did HB 2384, which would have barred local energy requirements stricter than the 2009 IECC.

No state building code agency; codes are adopted by cities and eligible counties ↗

Outside city limits

Outside city limits, whether you need a building permit depends on the county. A first or second class county may adopt a building code for its unincorporated area, and if it does, the county commission appoints a building commission and enforces the code there (RSMo 64.180).

Read more

Counties that had no code before August 28, 2001 need a public vote to adopt one. Many rural counties have never adopted a building code, so they issue no building permits for houses. A county may still have zoning, a floodplain development permit or a septic ordinance, and county zoning in second and third class counties under RSMo 64.620 does not reach farm buildings outside the mapped flood hazard area. Call the county commission or county planning office to find out what applies to your parcel.

Contractor and trade licensing

Missouri does not license general contractors or home builders at the state level, and has no state plumbing or HVAC contractor license. Those trades are licensed, if at all, by cities and counties. The one statewide license is the electrical contractor license under RSMo 324.900 to 324.945, issued by the Office of Statewide Electrical Contractors in the Division of Professional Registration.

Read more

It is optional. A contractor who works only where no local license is required, or who already holds the local license, does not need it (RSMo 324.920). Where a contractor does hold it, cities and counties must accept it in place of their own exam-based license and let the holder pull permits, but they can still require permits, inspect work, enforce local codes and require a business license (RSMo 324.925). Applicants need $500,000 in liability insurance and must post any bond a city or county requires. The state sets no owner-builder rule. Whether a homeowner can pull a building, electrical or plumbing permit is decided by each city or county that issues permits.

Electrical, plumbing and HVAC

Electrical contractors can hold an optional statewide license from the Office of Statewide Electrical Contractors, which began taking applications on July 1, 2019. Cities and counties that had electrical licensing authority before August 28, 2017 can still issue local contractor licenses and license individual electricians, and they must recognize the statewide license (RSMo 324.925).

Read more

Plumbing, HVAC and individual electrician licensing is handled locally. Missouri has no state-run electrical, plumbing or mechanical permit or inspection program for houses, so these permits come from your city or county if it issues them. Manufactured home installers are the exception: they are licensed statewide by the Public Service Commission.

State programs that can affect your permit

Onsite wastewater (septic) permits

A construction permit is needed before you install, or make a major modification or repair to, most onsite sewage systems (RSMo 701.046). Depending on the county, permits are issued by the DHSS Onsite Wastewater Treatment Program, by a local health agency under contract, or by a county under its own ordinance, which can be stricter than the state standard. State law excludes some large lots: a single-family lot of three acres or more, or a residential lot of ten acres or more meeting density and spacing conditions, where every part of the system is more than ten feet from the property line. Lots next to lakes run by the Corps of Engineers or a public utility do not qualify (RSMo 701.031). Check with the permitting authority before relying on an exemption. DHSS says application fees are temporarily suspended from August 28, 2026, after SB 914 removed the old $90 statutory fee.

Official page: health.mo.gov ↗

Manufactured home installer licensing

Anyone in the business of installing manufactured homes in Missouri must hold an installer license from the Missouri Public Service Commission. Cities and counties cannot require their own installer license on top of it. You do not need the license to install a manufactured home on your own property that you will live in (RSMo 700.656).

Official page: revisor.mo.gov ↗

Floodplain management (NFIP)

The Floodplain Management Section of the State Emergency Management Agency (SEMA) runs the National Flood Insurance Program in Missouri. Cities and counties that take part in the program agree to adopt and enforce a floodplain ordinance, so building in a mapped flood zone usually needs a local floodplain development permit even where there is no building code. SEMA keeps a directory of local floodplain administrators.

Official page: sema.dps.mo.gov ↗

Verified October 28, 2026 against Missouri sources. Missouri permit rules, sources and other counties

Common projects in St. Louis County

No Missouri-specific rules for these projects are on file here, so ask the permit office what each needs in St. Louis County.

Permit guides by project: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Electrical work · Rooftop solar · All 21 project guides

Other permits you may need in St. Louis County

These are separate from the building permit and come from the agencies named, under Missouri rules.

  • Septic system

    Local health departments or DHSS Onsite Wastewater Treatment Program

    A construction permit is needed before installing or repairing most septic systems. In most counties the local health department issues it; elsewhere DHSS or another local agency does. Installers must be registered with DHSS, and the permitting agency must be notified so it can inspect before the system is closed (RSMo 701.050). Some single-family lots of 3 acres or more are exempt (RSMo 701.031).

    Official page: health.mo.gov ↗ · Septic permit guide

  • Floodplain development

    SEMA Floodplain Management Section

    The State Emergency Management Agency's Floodplain Management Section administers the National Flood Insurance Program for Missouri. Cities and counties in the program adopt and enforce floodplain ordinances that meet or exceed FEMA requirements, and their local floodplain administrator issues floodplain development permits for building in mapped flood hazard areas.

    Official page: sema.dps.mo.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Missouri Department of Transportation (MoDOT)

    MoDOT requires a permit to build a driveway, or change an existing one's width, grade, location or surface, on its right of way, starting with an online permit request. Plans, a traffic study, a drainage analysis or a refundable surety deposit may be required, and MoDOT inspects the finished work.

    Official page: modot.org ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Missouri Department of Natural Resources (DNR)

    Construction that disturbs one acre or more, or less than an acre if part of a larger common plan of development or sale that will disturb one acre or more, needs a DNR Land Disturbance Stormwater General Permit (MO-RA), applied for online through ePermitting. The main requirement is a stormwater pollution prevention plan; the fee is $500 for 1 to under 5 acres.

    Official page: dnr.mo.gov ↗

  • Water well

    Missouri Department of Natural Resources (DNR)

    Wells must meet DNR's well construction rules (10 CSR 23). Well installation contractors need a DNR permit, and new wells and pump installations are reported to DNR on a certification form with a fee within 60 days (RSMo 256.614).

    Read more

    An owner may drill a well for their own single-family home or farm without a contractor permit but must follow the construction rules (RSMo 256.607).

    Official page: revisor.mo.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the St. Louis County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 314-615-5184 if you are unsure.

Can I apply for a permit online in St. Louis County?

Yes. The listing includes an online permit portal at aca.stlouisco.com. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in St. Louis County?

St. Louis County Department of Transportation and Public Works has no fee schedule online, so the cost has to come from the office. Call the office at 314-615-5184 with the project type, size and estimated value for a quote.

How do I look up past permits for an address in St. Louis County?

Start with the Accela Citizen Access portal at aca.stlouisco.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 314-615-5184 for the file or send a public records request.

Can I check a contractor's license for work in St. Louis County?

Yes, at mopro.mo.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

Which building code edition is cited for St. Louis County?

The published code information cites the 2015 International Residential Code and 2015 International Building Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.

What if my property is near the St. Louis County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. St. Louis County borders Franklin County, Jefferson County, St. Charles County, St. Louis City, Madison County (Illinois), Monroe County (Illinois), and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with St. Louis County.