County Permit SearchU.S. compliance directory
MissouriSt. Francois County

Administrative overview · FIPS 29187

St. Francois County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

St. Francois County Clerk / St. Francois County Floodplain Administration

For a project in or near St. Francois County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

573-756-5411 or 573-431-6505 ext. 718 (County Clerk); 573-431-6505 ext. 719 (Floodplain)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

St. Francois County Annex Building, 1 West Liberty Street, Suite 300, Farmington, MO 63640; Floodplain Suite 301

Operating hours

Monday-Friday 8:00 AM-4:00 PM (County Clerk); Floodplain office Monday-Friday 8:00 AM-noon

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for St. Francois County

Who handles permitting for this jurisdiction?

St. Francois County Clerk / St. Francois County Floodplain Administration is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 573-756-5411 or 573-431-6505 ext. 718 (County Clerk); 573-431-6505 ext. 719 (Floodplain) and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

N/A; obtain the rural building permit from the County Clerk. If the project is in a regulated floodplain, also obtain a Floodplain Development Permit/Application and contact the Floodplain Administrator at 573-431-6505 ext. 719.

Which codes and exemptions should I review?

N/A; the county publishes a rural building-permit form and floodplain-development requirements but the reviewed official pages do not identify a specific 2026 building-code edition. N/A; the reviewed county permit and floodplain pages do not publish a complete list of minor or cosmetic exemptions.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?