Who issues permits

No countywide building permit office was identified for Scotland County. The listing points to City of Memphis Building Inspector / City Hall. Inside city or town limits, the city or town issues building permits.

Outside city limits in Missouri

Outside city limits, whether you need a building permit depends on the county. A first or second class county may adopt a building code for its unincorporated area, and if it does, the county commission appoints a building commission and enforces the code there (RSMo 64.180).

Read more

Counties that had no code before August 28, 2001 need a public vote to adopt one. Many rural counties have never adopted a building code, so they issue no building permits for houses. A county may still have zoning, a floodplain development permit or a septic ordinance, and county zoning in second and third class counties under RSMo 64.620 does not reach farm buildings outside the mapped flood hazard area. Call the county commission or county planning office to find out what applies to your parcel.

More Missouri rules below · Confirm with the office at (660) 465-7285 before you build.

How to get a permit in Scotland County

  1. Find the office for your address: the city or town if you are inside its limits; outside them, the Missouri rule above decides.
  2. Request the application from the office at (660) 465-7285; no form or portal is published online.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  5. Get the final approval and keep it with the approved plans and receipts.

Search Scotland County permit records

No online permit portal is listed, so permit history is kept by City of Memphis Building Inspector. Call (660) 465-7285 or visit 125 W. Jefferson Street, Memphis, MO 63555 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

Inside a city or town, permit records are kept by that municipality’s building department, not by Scotland County.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Building codes and exemptions

Codes referenced

2012 International Building Code, 2012 International Residential Code, 2012 International Plumbing Code, 2012 International Fire Code, and 2014 National Electrical Code, with City of Memphis amendments.

Missouri: no statewide code. Details

Scheduling inspections

Contact Memphis City Hall at (660) 465-7285 to arrange required inspections with the Building Inspector. City code section 500.090 governs inspections; no online scheduler is published.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Starting construction before obtaining the required permit is an ordinance violation reported by the Building Inspector to the City Attorney. Violations of the adopted construction codes are punishable by a fine up to $500, up to 90 days in city or county jail, or both; each continuing day is a separate offense, and the city may seek injunctive relief.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at (660) 465-7285 about:

  • Fees: the current fee schedule and an estimate for your project.
  • Exempt work: which minor work needs no permit. The city code requires a permit before construction and does not publish a consolidated minor or cosmetic work exemption list in the accessible local provisions.
  • Review times: how long plan review currently takes.

Missouri rules that apply in Scotland County

These rules come from Missouri law and state agencies, so they apply in Scotland County on top of anything the local office requires.

Building code

No statewide code

Missouri has no state building, residential, plumbing, mechanical or energy code for private houses. Cities adopt their own codes, and counties of the first and second classification may adopt a building and electrical code for their unincorporated areas under RSMo 64.170 to 64.200.

Read more

A county that had not adopted a code under those sections before August 28, 2001 needs voter approval first, and the vote is held only among voters in the affected area. Under RSMo 64.196, any county code adopted or amended under these sections must be a nationally recognized building code from calendar year 1999 or later. Editions therefore vary from place to place, and you have to ask the local office which ones it uses. The U.S. Department of Energy lists Missouri as a home-rule state for both residential and commercial energy codes. In the 2026 session, the Missouri Building Codes Act (SB 1431), which would have created a statewide code and a state building code commission, did not pass. Neither did HB 2384, which would have barred local energy requirements stricter than the 2009 IECC.

No state building code agency; codes are adopted by cities and eligible counties ↗

Contractor and trade licensing

Missouri does not license general contractors or home builders at the state level, and has no state plumbing or HVAC contractor license. Those trades are licensed, if at all, by cities and counties. The one statewide license is the electrical contractor license under RSMo 324.900 to 324.945, issued by the Office of Statewide Electrical Contractors in the Division of Professional Registration.

Read more

It is optional. A contractor who works only where no local license is required, or who already holds the local license, does not need it (RSMo 324.920). Where a contractor does hold it, cities and counties must accept it in place of their own exam-based license and let the holder pull permits, but they can still require permits, inspect work, enforce local codes and require a business license (RSMo 324.925). Applicants need $500,000 in liability insurance and must post any bond a city or county requires. The state sets no owner-builder rule. Whether a homeowner can pull a building, electrical or plumbing permit is decided by each city or county that issues permits.

Electrical, plumbing and HVAC

Electrical contractors can hold an optional statewide license from the Office of Statewide Electrical Contractors, which began taking applications on July 1, 2019. Cities and counties that had electrical licensing authority before August 28, 2017 can still issue local contractor licenses and license individual electricians, and they must recognize the statewide license (RSMo 324.925).

Read more

Plumbing, HVAC and individual electrician licensing is handled locally. Missouri has no state-run electrical, plumbing or mechanical permit or inspection program for houses, so these permits come from your city or county if it issues them. Manufactured home installers are the exception: they are licensed statewide by the Public Service Commission.

State programs that can affect your permit

Onsite wastewater (septic) permits

A construction permit is needed before you install, or make a major modification or repair to, most onsite sewage systems (RSMo 701.046). Depending on the county, permits are issued by the DHSS Onsite Wastewater Treatment Program, by a local health agency under contract, or by a county under its own ordinance, which can be stricter than the state standard. State law excludes some large lots: a single-family lot of three acres or more, or a residential lot of ten acres or more meeting density and spacing conditions, where every part of the system is more than ten feet from the property line. Lots next to lakes run by the Corps of Engineers or a public utility do not qualify (RSMo 701.031). Check with the permitting authority before relying on an exemption. DHSS says application fees are temporarily suspended from August 28, 2026, after SB 914 removed the old $90 statutory fee.

Official page: health.mo.gov ↗

Manufactured home installer licensing

Anyone in the business of installing manufactured homes in Missouri must hold an installer license from the Missouri Public Service Commission. Cities and counties cannot require their own installer license on top of it. You do not need the license to install a manufactured home on your own property that you will live in (RSMo 700.656).

Official page: revisor.mo.gov ↗

Floodplain management (NFIP)

The Floodplain Management Section of the State Emergency Management Agency (SEMA) runs the National Flood Insurance Program in Missouri. Cities and counties that take part in the program agree to adopt and enforce a floodplain ordinance, so building in a mapped flood zone usually needs a local floodplain development permit even where there is no building code. SEMA keeps a directory of local floodplain administrators.

Official page: sema.dps.mo.gov ↗

Verified October 28, 2026 against Missouri sources. Missouri permit rules, sources and other counties

Common projects in Scotland County

No Missouri-specific rules for these projects are on file here, so ask the permit office what each needs in Scotland County.

Permit guides by project: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Electrical work · Rooftop solar · All 21 project guides

Other permits you may need in Scotland County

These are separate from the building permit and come from the agencies named, under Missouri rules.

  • Septic system

    Local health departments or DHSS Onsite Wastewater Treatment Program

    A construction permit is needed before installing or repairing most septic systems. In most counties the local health department issues it; elsewhere DHSS or another local agency does. Installers must be registered with DHSS, and the permitting agency must be notified so it can inspect before the system is closed (RSMo 701.050). Some single-family lots of 3 acres or more are exempt (RSMo 701.031).

    Official page: health.mo.gov ↗ · Septic permit guide

  • Floodplain development

    SEMA Floodplain Management Section

    The State Emergency Management Agency's Floodplain Management Section administers the National Flood Insurance Program for Missouri. Cities and counties in the program adopt and enforce floodplain ordinances that meet or exceed FEMA requirements, and their local floodplain administrator issues floodplain development permits for building in mapped flood hazard areas.

    Official page: sema.dps.mo.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Missouri Department of Transportation (MoDOT)

    MoDOT requires a permit to build a driveway, or change an existing one's width, grade, location or surface, on its right of way, starting with an online permit request. Plans, a traffic study, a drainage analysis or a refundable surety deposit may be required, and MoDOT inspects the finished work.

    Official page: modot.org ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Missouri Department of Natural Resources (DNR)

    Construction that disturbs one acre or more, or less than an acre if part of a larger common plan of development or sale that will disturb one acre or more, needs a DNR Land Disturbance Stormwater General Permit (MO-RA), applied for online through ePermitting. The main requirement is a stormwater pollution prevention plan; the fee is $500 for 1 to under 5 acres.

    Official page: dnr.mo.gov ↗

  • Water well

    Missouri Department of Natural Resources (DNR)

    Wells must meet DNR's well construction rules (10 CSR 23). Well installation contractors need a DNR permit, and new wells and pump installations are reported to DNR on a certification form with a fee within 60 days (RSMo 256.614).

    Read more

    An owner may drill a well for their own single-family home or farm without a contractor permit but must follow the construction rules (RSMo 256.607).

    Official page: revisor.mo.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does Scotland County have a countywide building permit office?

No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Missouri law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.

Can I apply for a permit online in Scotland County?

No online permit portal was found for this listing. Contact the office at (660) 465-7285 to ask how applications are accepted.

How much does a building permit cost in Scotland County?

City of Memphis Building Inspector has no fee schedule online, so the cost has to come from the office. Call the office at (660) 465-7285 with the project type, size and estimated value for a quote. Inside a city or town, that municipality’s own fee schedule applies.

How do I look up past permits for an address in Scotland County?

There is no online permit search for this listing. Ask the office at (660) 465-7285 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in Scotland County?

Yes, at mopro.mo.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Scotland County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Scotland County borders Adair County, Clark County, Knox County, Schuyler County, Davis County (Iowa), Van Buren County (Iowa).

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Scotland County.