New Mexico building permits
New Mexico has one set of minimum construction codes for the whole state, adopted by the Construction Industries Division (CID) of the Regulation and Licensing Department. Cities and counties that run a full-service building department with a certified building official issue their own permits under those codes. Everywhere else, including most rural areas, CID issues the permits and does the inspections for building, electrical, mechanical and plumbing work. All construction contractors need a state CID license, and homeowners can get a limited homeowner's permit for their own primary residence.
- Local profiles
- 33
- Link an online portal
- 29 (88%)
- State agency
- 24
- County office
- 9
How permits work in New Mexico
Building codes
Statewide code
Title 14 NMAC sets the statewide minimum codes, and local building departments may adopt stricter ordinances. Current editions: the 2021 New Mexico Residential Building Code (2021 IRC with state amendments, 14.7.3 NMAC), effective July 14, 2023 and the only residential code allowed for permits after December 14, 2023; the 2021 Commercial Building Code (14.7.2 NMAC); the 2021 residential and commercial energy codes (14.7.6 and 14.7.9 NMAC), effective July 30, 2024; and the 2020 New Mexico Electrical Code (2020 NEC, 14.10.4 NMAC), effective March 28, 2023. The 2024 New Mexico Plumbing Code (14.8.2), 2024 Mechanical Code (14.9.2) and 2024 Swimming Pool, Spa and Hot Tub Code (14.8.3) took effect August 1, 2026. Until January 1, 2027, plumbing and mechanical permits may be issued under either the 2021 or the 2024 code. After that date only the 2024 code applies.
New Mexico Regulation and Licensing Department, Construction Industries Division (CID)
Outside city limits
Under 14.6.5.9 NMAC, CID has statewide authority over permitting and inspection of general construction, electrical, mechanical-plumbing and LP gas work, except where a county, municipality or other political subdivision runs its own building department. To act as the authority having jurisdiction (AHJ), a local government needs a full-service building department and a full-time certified building official. If it has no certified building official, CID does all the inspections. In practice, unincorporated areas and many smaller towns get permits from CID, which handles applications through its online portal and its Albuquerque, Santa Fe and Las Cruces offices. Some local governments enforce only certain trades, so check with both your city or county and CID.
Contractors and owner-builders
Anyone contracting for construction in New Mexico needs a CID license, and the work must fall within the license's classification (14.6.6 NMAC). GB-2 covers residences and apartment houses of up to four family units. GB-98 covers residential and commercial buildings and includes GB-2. Electrical, mechanical-plumbing and gas work have their own classifications. The handyman exemption (14.6.2 NMAC) covers only casual, minor work totaling no more than $7,200 a year, and never electrical wiring, plumbing or gas fitting. Homeowners can get a homeowner's permit (14.5.2.18 NMAC) for their own primary residence only, meaning a single-family home and its garage, carport or shed. Rentals and commercial property don't qualify. The homeowner must do the major portion of the work by dollar value, personally or with W-2 employees, and may subcontract the rest to licensed contractors. Building, mechanical/plumbing and electrical each need a separate homeowner's permit, and an owner can get only one homeowner's permit per single-family dwelling in any 12-month period. The project can't be listed for sale while under construction.
New Mexico Construction Industries Division · Look up a license
Electrical, plumbing, and HVAC
Electrical (EE-98 and related classifications), plumbing (MM-1), natural gas fitting (MM-2), HVAC (MM-3) and combined mechanical (MM-98) contractors are licensed by CID, and journeymen are certified by CID. A homeowner can get an electrical permit only after CID approves a floor plan and panel schedule and the homeowner passes CID's homeowner electrical exam (75% to pass). A homeowner plumbing permit requires showing enough knowledge through plan review, and a written exam may be required. In both cases only the permittee may do the work. Homeowner permits are not issued for HVAC, natural gas or LP gas work, which need a licensed contractor. LP gas installations are permitted and inspected by CID's LP Gas bureau.
State programs that can affect your permit
- Manufactured Housing Division
A separate RLD division licenses manufactured home dealers, brokers and installers, issues installation permits (including to homeowners), and handles consumer complaints backed by a consumer protection bond.
New Mexico county directory
33 local profiles
Portal links an online permit portal (29). Fees links a fee schedule (12). Most profiles point to state agency; other listing types are labeled.
B
C
D
E
G
H
L
M
O
Q
R
S
T
U
V
Profiles marked “State agency” point to a state program that handles permits or oversight there.
Statewide rules for common projects
Roof replacement
14.5.2.8 NMAC: all new roofs, re-roofs and roof coatings require building permits and inspections.
Sheds and accessory buildings
14.5.2.9 NMAC: one-story detached accessory structures used as tool or storage sheds, playhouses or similar, with a floor area of 120 sq ft or less, are exempt from a building permit. Trade work such as wiring follows the separate trade permit rules.
Official source · Sheds and accessory buildings permit guide
Electrical work
Homeowners may pull an electrical permit for their own primary residence only after CID approves a floor plan and panel schedule and the homeowner passes CID's homeowner electrical exam (75% to pass). Only the permittee may do the work (14.5.2.18 NMAC).
New Mexico permit questions
Who issues building permits outside city limits in New Mexico?
Usually the state. The Construction Industries Division permits and inspects building, electrical and mechanical-plumbing work wherever a county or city doesn't run its own certified building department. Some counties and cities do have their own departments, so ask your county first. If it doesn't do inspections, apply through CID's online permit portal.
Can I build my own house in New Mexico without a contractor license?
Yes, with a homeowner's permit, if it's your primary residence and a single-family home. You have to do the major portion of the work by dollar value yourself or with W-2 employees, and subcontracted trades must pull their own permits. The permit can't be used for rentals, the home can't be listed for sale while under construction, and you can get only one per single-family dwelling every 12 months.
Can a homeowner do their own electrical, plumbing, or gas work?
Electrical: yes, after your plans are approved and you pass CID's homeowner electrical exam with at least 75%. Plumbing: yes, if the inspector is satisfied from your plans that you know enough, and a written exam may be required. Only you may do the work in either case. HVAC, natural gas and LP gas: no. These require a licensed contractor.
Do I need a permit to re-roof or build a small shed?
Re-roofing: yes. New Mexico's permit rule requires building permits and inspections for all new roofs, re-roofs and roof coatings. Sheds: a one-story detached accessory building used for tools or storage, with no more than 120 square feet of floor area, is exempt from a building permit. Wiring, plumbing or gas in the shed follows the separate trade permit rules.
Can I hire a handyman instead of a licensed contractor?
Only for minor work. New Mexico's handyman exemption covers casual, minor repairs totaling no more than $7,200 a year, and it never covers electrical wiring, plumbing or gas fitting. Bigger jobs need a CID-licensed contractor, which you can check through RLD's license lookup.
Permit guides for common projects
What the model codes say, what local offices often change and what to ask; read them with the New Mexico rules above.
- How to get a building permit
- Building permit costs
- Looking up permit records
- Work done without a permit
- Decks
- Fences
- Sheds and accessory buildings
- Roof replacement
- Water heaters
- Heating and air conditioning
- Electrical work
- Rooftop solar
- Pools and spas
- Accessory dwelling units
- Plumbing work
- Kitchen and bathroom remodels
- Demolition
- Septic systems
- Driveways and culverts
- Floodplain development
- Home additions and garages
- Window and door replacement
- Generators and EV chargers
- Manufactured and mobile homes
- Owner-builder permits
Sources
- NM CID: Rules, Laws, and Building Codeswww.rld.nm.gov
- NM CID: Construction Industries Division homewww.rld.nm.gov
- NM CID: Notice of public hearing, April 21, 2026 (2024 plumbing, mechanical, pool codes)www.rld.nm.gov
- 14.7.3 NMAC, 2021 New Mexico Residential Building Codesrca.nm.gov
- 14.10.4 NMAC, 2020 New Mexico Electrical Codewww.srca.nm.gov
- 14.5.1 NMAC, General Provisions (AHJ definition, statewide minimum standards)www.srca.nm.gov
- 14.5.2 NMAC, Permits (exemptions, homeowner's permit)www.srca.nm.gov
- 14.6.5 NMAC, Inspectors (CID statewide authority, 14.6.5.9)www.srca.nm.gov
- 14.6.6 NMAC, Classifications and Scopeswww.srca.nm.gov
- 14.6.2 NMAC, Handyman Certificatewww.srca.nm.gov
- NM RLD: Verify a Licensewww.rld.nm.gov
- NM RLD: Manufactured Housing Divisionwww.rld.nm.gov
Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction
