New MexicoUnion County

Administrative overview · FIPS 35059

Union County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

State Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked State Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

New Mexico Regulation and Licensing Department, Construction Industries Division (CID); Union County Administration provides county contacts

For a project in or near Union County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Union County: 575-374-8896; NM CID: 505-222-9801

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Union County Administration, 200 Court Street, Clayton, NM 88415; mailing PO Box 430

Operating hours

Operating hours not verified

Review expectation

For a complete state CID application, approximately 3–4 working days for residential work and 5–10 working days for commercial work.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Union County

Who handles permitting for this jurisdiction?

This record is marked State Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Union County: 575-374-8896; NM CID: 505-222-9801.

How long might review take?

For a complete state CID application, approximately 3–4 working days for residential work and 5–10 working days for commercial work.

How are inspections scheduled?

State CID schedules inspections; use the RLD inspection-request instructions or contact CID at 505-222-9813 in Albuquerque or 877-243-0979 elsewhere.

Which codes and exemptions should I review?

2021 New Mexico Commercial Building Code, 2021 New Mexico Residential Building Code, 2021 New Mexico Existing Building Code, 2021 New Mexico energy codes, and 2020 New Mexico Electrical Code/NEC, as administered by state CID. No county-specific exemption list was identified. State CID rules may exempt limited minor work; verify with CID before starting construction.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?