County Permit SearchU.S. compliance directory
New MexicoSan Juan County

Administrative overview · FIPS 35045

San Juan County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

San Juan County Community Development Department, Building Department

For a project in or near San Juan County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

505-334-4313

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

San Juan County Building Department, 100 South Oliver Drive, Aztec, NM 87410

Operating hours

Operating hours not verified

Review expectation

The current residential checklist states a minimum of two weeks for plan review after all documents are submitted; commercial review materials state roughly two to three weeks. Permit fees are based on project valuation and plan review requirements.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for San Juan County

Who handles permitting for this jurisdiction?

San Juan County Community Development Department, Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 505-334-4313.

How long might review take?

The current residential checklist states a minimum of two weeks for plan review after all documents are submitted; commercial review materials state roughly two to three weeks. Permit fees are based on project valuation and plan review requirements.

How are inspections scheduled?

Inspection requests must be scheduled at least one day in advance by calling 505-334-4313. The residential checklist requires all work to be inspected, at least 24 hours' notice, and a minimum two-week plan review after complete submission.

Which codes and exemptions should I review?

2021 New Mexico Commercial Building Code, 2021 New Mexico Residential Building Code, 2021 International Building Code, 2021 International Residential Code, 2021 International Existing Building Code, 2021 NM Energy Conservation Code, 2021 NM Plumbing and Mechanical Code, 2021 International Fire Code, 2020 New Mexico Electrical Code/2020 NEC, 2012 Solar Energy Code, 2017 NFPA 58, and 2018 NFPA 54, as listed by the County. San Juan County states permits are required for covered projects erected, constructed, enlarged, altered, repaired, moved, improved, removed, converted, or demolished. No separate county exemption schedule was identified; confirm minor work with the Building Department.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?