North Dakota building permits
North Dakota has a state building code, but it is only enforced where a city, township, or county has chosen to enforce a building code. Places that do enforce one must use the state code, now based on the 2024 International Codes and in effect since January 1, 2026, and they may amend it. Electrical and plumbing work fall under separate state boards. The State Electrical Board inspects electrical work across the whole state, whether or not a local building department exists.
- Local profiles
- 53
- Link an online portal
- 5 (9%)
- County office
- 39
- City or town offices
- 12
- State agency
- 2
How permits work in North Dakota
Building codes
Partial statewide code
Since January 1, 2026, the North Dakota State Building Code has been the 2024 editions of the International Building Code, International Residential Code, International Mechanical Code, International Fuel Gas Code, International Energy Conservation Code and International Existing Building Code, with state amendments. Eligible jurisdictions and the advisory committee approved them on September 11, 2025. No appendix chapters are adopted. Under N.D.C.C. 54-21.3-03(6), a city, township, or county that elects to administer and enforce a building code must adopt the state code, and it may amend it to suit local needs. Local governments that don't elect to enforce a code are not required to issue building permits. The state building code does not cover electrical wiring, plumbing, or the fire code, which have their own state rules (N.D.C.C. 54-21.3-04). Farm buildings are exempt unless people live in them or the public uses them. The state code and local codes may not require fire sprinklers in one- and two-family homes. The Department of Commerce updates the code but does not enforce it.
Outside city limits
A county may enforce the state building code in any part of the county where a city or township does not (N.D.C.C. 54-21.3-05). Cities and townships may hand their enforcement authority to the county, and local governments may enforce jointly or contract with private inspectors. Enforcement is optional, so in many rural areas no building permit is issued under the state code. Ask your county and township, since local zoning rules may still apply. Electrical work still needs a state wiring certificate and inspection everywhere.
Contractors and owner-builders
Anyone working as a contractor on a job whose cost, value, or price is more than $4,000 must hold a contractor license from the Secretary of State (N.D.C.C. 43-07-02). Classes are based on the size of a single job: Class D up to $100,000, Class C up to $300,000, Class B up to $500,000, and Class A over $500,000. North Dakota has no state law on who may pull a building permit. That is up to the local building department, where one exists. Homeowners may do their own electrical work on a home or farmstead they own and live in, after applying to the State Electrical Board. They may also do their own plumbing in the part of a property they own and live in, unless a local ordinance forbids it (N.D.C.C. 43-18-11).
North Dakota Secretary of State (contractor licensing) · Look up a license
Electrical, plumbing, and HVAC
The State Electrical Board licenses master, journeyman, class B and power-limited electricians. It also adopts the state wiring standards, which have been based on the 2026 National Electrical Code (NFPA 70) since July 1, 2026, replacing the 2023 NEC. The board inspects all electrical installations statewide (N.D.C.C. 43-09-22). A city may also run its own electrical inspections inside city limits. The State Board of Plumbing licenses master and journeyman plumbers, and also licenses water conditioning installers and sewer and water installers. It has adopted the 2018 Uniform Plumbing Code as the North Dakota Plumbing Code. The board inspects plumbing in public buildings and new homes, unless a city or other local government inspects. Repairs, minor fixture replacements, and buildings not connected to public water or sewer don't need a state plumbing inspection (N.D.C.C. 43-18-17.3).
State programs that can affect your permit
- State electrical inspection (State Electrical Board)
Electrical work worth $500 or more, a new or altered service, a moved building, or a new mobile home service or feeder needs a wiring certificate. The supervising electrician files it with the board and the power company before work starts. A final copy goes to the board within 15 days of completion. The board's inspectors cover the whole state by district. A homeowner wiring their own home must apply to the board first, own and live in the home or farmstead, review the plans with the local electrical inspector, and pay inspection fees.
- Manufactured Home Installation Program
New manufactured homes set up for residential use must be installed by an installer licensed by the Division of Community Services. A licensed inspector inspects the installation, and the home gets an insignia once it passes. The program's rules are in N.D. Admin. Code article 108-03.
- Private sewage (septic) systems
Septic systems must meet the State Plumbing Board's onsite sewage rules (N.D. Admin. Code ch. 62-03.1-03). Permits, and any installer license, are handled by the local or district health unit, or another local authority, where it requires them.
North Dakota county directory
53 local profiles
Portal links an online permit portal (5). Fees links a fee schedule (24). Profiles that point to a city, town or state agency are labeled.
A
B
C
D
E
F
G
H
K
L
M
N
O
P
R
S
T
W
Profiles marked “City or town offices” point to municipal permit offices because the county does not issue general building permits. Profiles marked “State agency” point to a state program that handles permits or oversight there.
Statewide rules for common projects
Fences
Where the state building code is enforced, the state amendment to IRC R105.2 exempts fences up to 8.5 ft high from a building permit. Cities, townships, and counties may amend the code, and zoning rules may still apply.
Decks
Where the state building code is enforced, the state amendment to IRC R105.2 exempts decks up to 120 sq ft that are no more than 7 inches above grade at any point, are not attached to the house, and do not serve the required exit door. Other decks need a permit where the code is enforced.
Electrical work
Statewide, the supervising electrician must file a wiring certificate before work starts on a new or altered service, a moved building, a mobile home service or feeder, or work costing more than $500. Homeowners may wire a home or farmstead they own and live in after applying to the State Electrical Board (N.D. Admin. Code 24.1-05-01-01).
North Dakota permit questions
Do I need a building permit if I live outside city limits?
Only if your county or township has chosen to enforce the state building code. Many rural areas have no building permit program. Electrical work still needs a state wiring certificate and inspection, and local zoning rules may still apply.
Can I do my own electrical work?
Yes, on a home or farmstead you own and live in. You must apply to the State Electrical Board before you start, review your plans with the local state electrical inspector, and pay the inspection fee. The work must pass inspection.
Can I do my own plumbing?
State law lets you do plumbing on the part of a property you own and live in, as long as it meets the state plumbing code. A local ordinance can forbid this, so check with your city first.
Can my city require fire sprinklers in a new house?
No. N.D.C.C. 54-21.3-03(4) bars the state building code and any city, township, or county code from requiring fire sprinklers in a single-family home or a building with no more than two dwelling units.
When does a contractor need a state license?
When the job costs more than $4,000. Contractors are licensed by the Secretary of State, and you can check a license with the online contractor search.
Permit guides for common projects
What the model codes say, what local offices often change and what to ask; read them with the North Dakota rules above.
- How to get a building permit
- Building permit costs
- Looking up permit records
- Work done without a permit
- Decks
- Fences
- Sheds and accessory buildings
- Roof replacement
- Water heaters
- Heating and air conditioning
- Electrical work
- Rooftop solar
- Pools and spas
- Accessory dwelling units
- Plumbing work
- Kitchen and bathroom remodels
- Demolition
- Septic systems
- Driveways and culverts
- Floodplain development
- Home additions and garages
- Window and door replacement
- Generators and EV chargers
- Manufactured and mobile homes
- Owner-builder permits
Sources
- ND Department of Commerce – Building Codeswww.commerce.nd.gov
- 2026 North Dakota State Building Code book (effective January 1, 2026)www.medialibrary.nd.gov
- N.D.C.C. chapter 54-21.3 – State Building Codendlegis.gov
- ND Secretary of State – Contractorssos.nd.gov
- N.D.C.C. chapter 43-07 – Contractorsndlegis.gov
- ND Secretary of State – Contractor searchfirststop.sos.nd.gov
- ND State Electrical Boardwww.ndseb.com
- ND State Electrical Board – Laws and Ruleswww.ndseb.com
- 2026 Laws, Rules, Wiring and Conveyance Standards of North Dakota (effective July 1, 2026)www.ndseb.com
- ND State Electrical Board – Inspections general informationwww.ndseb.com
- ND State Board of Plumbingwww.ndplumbingboard.gov
- N.D.C.C. chapter 43-18 – Plumbersndlegis.gov
- N.D. Admin. Code ch. 62-03.1-01 – North Dakota Plumbing Code (2018 UPC)ndlegis.gov
- N.D. Admin. Code ch. 62-03.1-03 – Private Sewage Disposal Systemsndlegis.gov
- ND Department of Commerce – Manufactured Home Installation Programwww.commerce.nd.gov
Last verified October 28, 2026. State rules change. The issuing agency’s current instructions control if they differ from this summary. Suggest a correction
