Who issues permits

Ward County Building Inspector / Tax Equalization Office is the county office listed for building permits in Ward County.

How to get a permit in Ward County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the portal at co.ward.nd.us, or with the published application forms.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Ward County permit records

The listing’s online portal is at co.ward.nd.us ↗. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Ward County Building Inspector at 701-857-6429. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Ward County Building Inspector publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

North Dakota State Building Code 2023, including IRC, IBC, IFGC, IMC, IFC, plus Ward County ordinances; state plumbing and electrical boards enforce and inspect plumbing and electrical work.

North Dakota: partial statewide code. Details

Work that may not need a permit

Farm buildings, including farm residential structures, are exempt under the Ward County zoning resolution. The current application generally requires permits for construction, alteration, repair, moving, demolition, occupancy changes, buildings over 120 square feet, foundations, load-bearing walls, larger decks, tall fences, and regulated electrical/gas/mechanical/plumbing work.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Building inspections are scheduled by appointment through the Ward County Building Inspector at 701-857-6429. Required inspections include footings, foundation, underground plumbing, framing, rough and final electrical/plumbing/mechanical, and final building inspection; electrical and plumbing inspections are scheduled with the state inspectors.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

The permit holder must arrange required inspections or may be subject to a fine or re-inspection fee. Work must not begin until the application is approved and the permit is issued; permits expire after 180 days unless renewed.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 701-857-6429 about:

  • Review times: how long plan review currently takes. Applications, plans, fees, and supporting documents are reviewed and approved before payment is accepted and the permit is issued.

North Dakota rules that apply in Ward County

These rules come from North Dakota law and state agencies, so they apply in Ward County on top of anything the local office requires.

Building code

Partial statewide code

Since January 1, 2026, the North Dakota State Building Code has been the 2024 editions of the International Building Code, International Residential Code, International Mechanical Code, International Fuel Gas Code, International Energy Conservation Code and International Existing Building Code, with state amendments.

Read more

Eligible jurisdictions and the advisory committee approved them on September 11, 2025. No appendix chapters are adopted. Under N.D.C.C. 54-21.3-03(6), a city, township, or county that elects to administer and enforce a building code must adopt the state code, and it may amend it to suit local needs. Local governments that don't elect to enforce a code are not required to issue building permits. The state building code does not cover electrical wiring, plumbing, or the fire code, which have their own state rules (N.D.C.C. 54-21.3-04). Farm buildings are exempt unless people live in them or the public uses them. The state code and local codes may not require fire sprinklers in one- and two-family homes. The Department of Commerce updates the code but does not enforce it.

North Dakota Department of Commerce, Division of Community Services (with the State Building Code Advisory Committee) ↗

Outside city limits

A county may enforce the state building code in any part of the county where a city or township does not (N.D.C.C. 54-21.3-05). Cities and townships may hand their enforcement authority to the county, and local governments may enforce jointly or contract with private inspectors.

Read more

Enforcement is optional, so in many rural areas no building permit is issued under the state code. Ask your county and township, since local zoning rules may still apply. Electrical work still needs a state wiring certificate and inspection everywhere.

Contractor and trade licensing

Anyone working as a contractor on a job whose cost, value, or price is more than $4,000 must hold a contractor license from the Secretary of State (N.D.C.C. 43-07-02). Classes are based on the size of a single job: Class D up to $100,000, Class C up to $300,000, Class B up to $500,000, and Class A over $500,000.

Read more

North Dakota has no state law on who may pull a building permit. That is up to the local building department, where one exists. Homeowners may do their own electrical work on a home or farmstead they own and live in, after applying to the State Electrical Board. They may also do their own plumbing in the part of a property they own and live in, unless a local ordinance forbids it (N.D.C.C. 43-18-11).

Electrical, plumbing and HVAC

The State Electrical Board licenses master, journeyman, class B and power-limited electricians. It also adopts the state wiring standards, which have been based on the 2026 National Electrical Code (NFPA 70) since July 1, 2026, replacing the 2023 NEC.

Read more

The board inspects all electrical installations statewide (N.D.C.C. 43-09-22). A city may also run its own electrical inspections inside city limits. The State Board of Plumbing licenses master and journeyman plumbers, and also licenses water conditioning installers and sewer and water installers. It has adopted the 2018 Uniform Plumbing Code as the North Dakota Plumbing Code. The board inspects plumbing in public buildings and new homes, unless a city or other local government inspects. Repairs, minor fixture replacements, and buildings not connected to public water or sewer don't need a state plumbing inspection (N.D.C.C. 43-18-17.3).

State programs that can affect your permit

State electrical inspection (State Electrical Board)

Electrical work worth $500 or more, a new or altered service, a moved building, or a new mobile home service or feeder needs a wiring certificate. The supervising electrician files it with the board and the power company before work starts. A final copy goes to the board within 15 days of completion. The board's inspectors cover the whole state by district. A homeowner wiring their own home must apply to the board first, own and live in the home or farmstead, review the plans with the local electrical inspector, and pay inspection fees.

Official page: ndseb.com ↗

Manufactured Home Installation Program

New manufactured homes set up for residential use must be installed by an installer licensed by the Division of Community Services. A licensed inspector inspects the installation, and the home gets an insignia once it passes. The program's rules are in N.D. Admin. Code article 108-03.

Official page: commerce.nd.gov ↗

Private sewage (septic) systems

Septic systems must meet the State Plumbing Board's onsite sewage rules (N.D. Admin. Code ch. 62-03.1-03). Permits, and any installer license, are handled by the local or district health unit, or another local authority, where it requires them.

Official page: ndlegis.gov ↗

Verified October 28, 2026 against North Dakota sources. North Dakota permit rules, sources and other counties

Common projects in Ward County

North Dakota has statewide rules on file for 3 of these projects; they apply in Ward County along with local permit requirements.

  • Decks

    Where the state building code is enforced, the state amendment to IRC R105.2 exempts decks up to 120 sq ft that are no more than 7 inches above grade at any point, are not attached to the house, and do not serve the required exit door. Other decks need a permit where the code is enforced.

    Also named in Ward County’s exemption summary.

    North Dakota source: medialibrary.nd.gov ↗ · Decks permit guide

  • Fences

    Where the state building code is enforced, the state amendment to IRC R105.2 exempts fences up to 8.5 ft high from a building permit. Cities, townships, and counties may amend the code, and zoning rules may still apply.

    Also named in Ward County’s exemption summary.

    North Dakota source: medialibrary.nd.gov ↗ · Fences permit guide

  • Electrical work

    Statewide, the supervising electrician must file a wiring certificate before work starts on a new or altered service, a moved building, a mobile home service or feeder, or work costing more than $500.

    Read more

    Homeowners may wire a home or farmstead they own and live in after applying to the State Electrical Board (N.D. Admin. Code 24.1-05-01-01).

    Also named in Ward County’s exemption summary.

    North Dakota source: ndseb.com ↗ · Electrical work permit guide

Named in Ward County’s exemption summary (read it before assuming the work is exempt): Heating and air conditioning · Demolition · Plumbing work

Guides for other projects: Sheds and accessory buildings · Roof replacement · Water heaters · Rooftop solar · Pools and spas · Accessory dwelling units · Septic systems · Driveways and culverts · All 21 project guides

Other permits you may need in Ward County

These are separate from the building permit and come from the agencies named, under North Dakota rules.

  • Septic system

    Local public health unit (NDDEQ licenses installers)

    Onsite wastewater (septic) installers must hold a license from the North Dakota Department of Environmental Quality, issued at no cost under NDCC chapter 23.1-07.1, and must follow local codes. Before starting work, the installer must get a permit from the local public health unit.

    Official page: deq.nd.gov ↗ · Septic permit guide

  • Floodplain development

    ND Department of Water Resources

    The Department of Water Resources Regulatory Division coordinates the NFIP in North Dakota, and a floodplain development permit must be obtained from the local floodplain administrator before any work in a Special Flood Hazard Area.

    Read more

    North Dakota requires one foot of freeboard: to meet NFIP and state requirements, communities must require new or improved homes to be elevated one foot above the base flood elevation.

    Official page: dwr.nd.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    NDDOT

    A driveway on state highway right of way requires an NDDOT Driveway Application and Permit (SFN 5918), approved through the NDDOT district. The landowner pays for construction, and the driveway is not considered complete until NDDOT checks and approves it.

    Official page: dot.nd.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    NDDEQ

    Construction that disturbs one or more acres, including smaller projects that are part of a larger development, needs coverage under NDDEQ's construction stormwater general permit (NDR11). The operator submits a Notice of Intent through CERIS-ND at least seven days before construction, is covered seven days after DEQ receives it, and must prepare and follow a Stormwater Pollution Prevention Plan.

    Official page: deq.nd.gov ↗

  • Water well

    ND Department of Water Resources

    Water well contractors are licensed by the Department of Water Resources and must file a well driller's report with DWR within 30 days after completing or abandoning a well. A water appropriation permit is not required for domestic or livestock use under 12.5 acre-feet per year, but the location and capacity of the well must be reported to DWR.

    Official page: dwr.nd.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Ward County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 701-857-6429 if you are unsure.

Can I apply for a permit online in Ward County?

Yes. The listing includes an online permit portal at co.ward.nd.us. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Ward County?

Ward County Building Inspector publishes its fee schedule online (co.ward.nd.us). Look up your project type there, and ask the office at 701-857-6429 for an estimate if your project is not listed.

How do I look up past permits for an address in Ward County?

Start with the portal at co.ward.nd.us and search by address, parcel or permit number. If an older permit is not there, ask the office at 701-857-6429 for the file or send a public records request.

Can I check a contractor's license for work in Ward County?

Yes, at firststop.sos.nd.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Ward County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Ward County borders Burke County, McHenry County, McLean County, Mountrail County, Renville County.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Ward County.