County Permit SearchU.S. compliance directory
North DakotaWard County

Administrative overview · FIPS 38101

Ward County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Ward County Building Inspector / Tax Equalization Office

For a project in or near Ward County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

701-857-6429 (Building Inspector); 701-857-6420 (Auditor/Treasurer)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Ward County Courthouse, 225 SE Third St, Second Floor, Minot, ND 58701

Operating hours

Monday-Friday 8:00 AM-4:30 PM; closed county holidays

Review expectation

N/A; applications, plans, fees, and supporting documents are reviewed and approved before payment is accepted and the permit is issued.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Ward County

Who handles permitting for this jurisdiction?

Ward County Building Inspector / Tax Equalization Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 701-857-6429 (Building Inspector); 701-857-6420 (Auditor/Treasurer).

How long might review take?

N/A; applications, plans, fees, and supporting documents are reviewed and approved before payment is accepted and the permit is issued.

How are inspections scheduled?

Building inspections are scheduled by appointment through the Ward County Building Inspector at 701-857-6429. Required inspections include footings, foundation, underground plumbing, framing, rough and final electrical/plumbing/mechanical, and final building inspection; electrical and plumbing inspections are scheduled with the state inspectors.

Which codes and exemptions should I review?

North Dakota State Building Code 2023, including IRC, IBC, IFGC, IMC, IFC, plus Ward County ordinances; state plumbing and electrical boards enforce and inspect plumbing and electrical work. Farm buildings, including farm residential structures, are exempt under the Ward County zoning resolution. The current application generally requires permits for construction, alteration, repair, moving, demolition, occupancy changes, buildings over 120 square feet, foundations, load-bearing walls, larger decks, tall fences, and regulated electrical/gas/mechanical/plumbing work.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?