Who issues permits
No countywide building permit office was identified for Bedford County. The listing points to Bedford County Building & Codes Department. Inside city or town limits, the city or town issues building permits.
Also listed: Planning and Zoning Department.
Outside city limits in Tennessee
It depends on the county. Some counties run their own building department and issue permits in unincorporated areas. In counties that have neither their own program nor an opt-out, a new home or an addition of 30 sq ft or more of interior space needs a state residential building permit.
Read more
The permit comes from a state-authorized issuing agent, and state deputy building inspectors do the inspections. Where the county has opted out, the unincorporated areas need no residential building permit (Rule 0780-02-23-.05). In most counties a state electrical permit is still required, and a septic system always needs a state permit.
More Tennessee rules below · Confirm with the office at 931-685-1336 before you build.
How to get a permit in Bedford County
- Find the office for your address: the city or town if you are inside its limits; outside them, the Tennessee rule above decides.
- Apply online through the SmartGov portal at co-bedfordcounty-tn.smartgovcommunity.com, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Bedford County permit records
The listing’s online portal is at co-bedfordcounty-tn.smartgovcommunity.com ↗ and runs on SmartGov. Use the portal’s search to look up permits by address or permit number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Bedford County Building & Codes Department at 931-685-1336. To follow your own application, search for its permit or application number.
Inside a city or town, permit records are kept by that municipality’s building department, not by Bedford County.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Building codes and exemptions
Codes referenced
As of 2026, Bedford County’s adopted residential code is the 2021 International Residential Code with county amendments and deletions, effective February 1, 2025. The resolution makes the IRC interchangeable with the IBC, IECC, IMC, IFGC and IPC for residential work; the county also adopted the 2021 International Fire Code effective January 1, 2025, with applicable Tennessee requirements.
Tennessee: partial statewide code. Details
Work that may not need a permit
The county’s 2021 IRC amendments exempt roof-covering replacement when roof decking or framing is not replaced; replacement of a gas appliance/equipment with the same input BTU when installed by a Tennessee-licensed installer; and replacement of an HVAC unit when capacity and fuel source do not change. The county deleted the IRC deck exemption, so decks should be treated as permit-required. The application also requires tax card/map, plans, and—when applicable—invoices for mobile homes, pools, solar panels and ready-built sheds, septic approval and contractor license/worker’s compensation proof.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
The permit application directs applicants to the Building & Codes Department at 931-685-1336 (Ext. 2 is shown on the form) for permit and inspection coordination. Building inspections must be passed before the county issues a Certificate of Occupancy; the county’s public SmartGov portal provides code-enforcement/request functions, but no separate online inspection-booking instructions were located.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
The 2021 residential-code resolution imposes a fine equal to the building permit fee in addition to the required fees when permitted work starts before the necessary permit is obtained. Code and zoning violations are Class C misdemeanors; the county zoning resolution provides $50-$150 per offense, with each continuing day a separate offense, and permits injunction or abatement actions. Repeated failed inspections incur $50, $75, $100 and $200 reinspection fees, and occupying before final approval incurs a $250 early-move-in penalty.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at 931-685-1336 about:
- Fees: the current fee schedule and an estimate for your project. The county zoning resolution says the current fee schedule is posted in the Zoning Compliance Office, and no public fee-schedule URL was located
- Review times: how long plan review currently takes.
Tennessee rules that apply in Bedford County
These rules come from Tennessee law and state agencies, so they apply in Bedford County on top of anything the local office requires.
Building code
Partial statewide code
For one- and two-family homes and townhouses, the state residential code is the 2018 International Residential Code (IRC) with Tennessee amendments (Rule 0780-02-23-.02, last amended effective July 16, 2020). Fire sprinklers in homes are not required, and the IRC electrical chapters are replaced by the state electrical rules.
Read more
Energy work follows the 2018 IECC with amendments. For other buildings, a rule effective April 17, 2025 moved the state to the 2021 IBC, IFC, IPC, IMC, IFGC, IEBC and IECC (Rule 0780-02-02). Plans could use the older codes until August 15, 2025. The state electrical code is the 2017 National Electrical Code with Tennessee exceptions, effective October 1, 2018 (Rule 0780-02-01-.02). The state's own electrical program still listed the 2017 NEC as of August 2026. Local governments may enforce their own codes, but their codes must be no more than seven years older than the latest edition. They may not weaken the state standards without the State Fire Marshal's written approval. A city or county may also opt out of the state residential code by resolution (Rule 0780-02-23-.14). Where it does, no state residential building permit is required.
Contractor and trade licensing
The Tennessee Board for Licensing Contractors licenses prime contractors for projects of $25,000 or more. Electrical, mechanical, plumbing, HVAC and roofing subcontractors need a license when their part of the job is $25,000 or more, and masonry subcontractors need one at $100,000 or more.
Read more
In Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford and Shelby counties, a home improvement license is also required for residential remodeling jobs from $3,000 to $24,999 (T.C.A. § 62-6-501 et seq.). Property owners building a home for their own use do not need a contractor license. In the state residential program, a property owner's permit is for an owner of record building a one-family home they plan to live in. Under T.C.A. § 62-6-103, an individual may get only one property owner's permit in any 24-month period. The owner does not need to show a license, but the work gets the same inspections (Rule 0780-02-23-.01, -.05). Local building departments set their own owner-permit rules.
Electrical, plumbing and HVAC
Electrical, plumbing and HVAC contractors are licensed by the Board for Licensing Contractors (the CE, CMC-A and CMC-C classifications) for jobs of $25,000 or more. For smaller jobs, the Board issues Limited Licensed Electrician (LLE) and Limited Licensed Plumber (LLP) licenses.
Read more
These are required in places that use the State Fire Marshal's Office for permits or inspections. Plumbing maintenance work under $500 is exempt from the LLP. Cities with their own programs may have local licensing instead. The State Fire Marshal's Office runs the state electrical permit and inspection program through about 100 contracted deputy electrical inspectors, and permits are sold online through the CORE system and by local issuing agents.
State programs that can affect your permit
State electrical inspection program
Outside the exempt jurisdictions, an electrical permit is required before installing wiring that must be inspected under Rule 0780-02-01-.04. Contracted deputy electrical inspectors do the inspections. The exempt jurisdictions are mostly larger cities (for example Knoxville, Chattanooga, Clarksville, Franklin and Murfreesboro), plus all of Davidson (Metro Nashville), Hamilton and Shelby counties. They run their own electrical permits.
State residential building permit program
The same State Fire Marshal's section issues residential building permits and inspects new one- and two-family homes, townhouses and additions of 30 sq ft or more of interior space. It covers places that neither enforce their own residential code nor have opted out.
Subsurface sewage disposal (septic) permits
Anyone installing a septic system, or repairing a failing one, needs a Septic System Construction Permit from TDEC's Division of Water Resources. Some contract counties (Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby and Williamson) may require an extra local permit. A residential building permit application must certify that public sewer or a septic permit is available.
Manufactured housing
The State Fire Marshal's Manufactured Housing Section licenses manufacturers, retailers and installers of HUD-labeled manufactured homes. It also inspects installations under the Tennessee Manufactured Home Installation Act. Setting a manufactured or modular home is not "construction" under the state residential code, but any added site-built construction is.
Verified October 28, 2026 against Tennessee sources. Tennessee permit rules, sources and other counties
Common projects in Bedford County
Tennessee has statewide rules on file for 3 of these projects; they apply in Bedford County along with local permit requirements.
Decks
Under the state residential program, decks, porches and other additions of exterior space, and additions of less than 30 sq ft of interior space, count as renovation, so no state residential building permit is needed (Rule 0780-02-23-.01). Local building departments may require one.
Also named in Bedford County’s exemption summary.
Roof replacement
Under the state residential program, reroofing and residing count as "renovation" rather than "construction," so they don't need a state residential building permit (Rule 0780-02-23-.01). Cities and counties with their own building departments may still require a permit.
Also named in Bedford County’s exemption summary.
Tennessee source: law.cornell.edu ↗ · Roof replacement permit guide
Electrical work
In areas served by the state electrical program, a permit is required before installing wiring that must be inspected under Rule 0780-02-01-.04. A residential property owner can buy an individual-use permit for a home that is not for sale, lease or rent, and doesn't need to show a license.
Named in Bedford County’s exemption summary (read it before assuming the work is exempt): Sheds and accessory buildings · Heating and air conditioning · Rooftop solar · Pools and spas · Septic systems · Manufactured and mobile homes
Guides for other projects: Fences · Water heaters · Accessory dwelling units · Demolition · Plumbing work · Driveways and culverts · Floodplain development · Kitchen and bathroom remodels · All 21 project guides
Other permits you may need in Bedford County
These are separate from the building permit and come from the agencies named, under Tennessee rules.
Septic system
Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources
No property owner or installer may build, alter, extend or repair a septic (subsurface sewage disposal) system without a valid construction permit from TDEC, and TDEC will not issue one where a public sewer is accessible (Rule 0400-48-01-.06).
Read more
The site must first be shown suitable through its soil conditions, absorption rates and depth to groundwater and rock, which TDEC may determine itself or with an approved soil consultant's map, and construction permits expire 3 years after issuance. Installers must hold an annual TDEC installer permit, except owners or tenants doing their own work on the home they live in, and before a new home gets electrical service the electrical inspector must see proof of a septic permit application or a public sewer connection.
Water well
Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources
Before drilling a water well, the property owner or the licensed well driller must submit a Notice of Intent to TDEC, and the driller may not start without proof it was filed (Rule 0400-45-09-.10). The state Notice of Intent fee ($75 per property site for a water well) does not apply in local jurisdictions approved to regulate and inspect wells.
Read more
Each new well must carry a TDEC registration tag, and the licensed driller must file a well completion report (Report of Well Driller) with TDEC within 60 days after the well is completed.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does Bedford County have a countywide building permit office?
No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Tennessee law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.
Can I apply for a permit online in Bedford County?
Yes. The listing includes an online permit portal at co-bedfordcounty-tn.smartgovcommunity.com. The agency also publishes application forms online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Bedford County?
Bedford County Building & Codes Department has no fee schedule online, so the cost has to come from the office. Call the office at 931-685-1336 with the project type, size and estimated value for a quote. Inside a city or town, that municipality’s own fee schedule applies.
How do I look up past permits for an address in Bedford County?
Start with the SmartGov portal at co-bedfordcounty-tn.smartgovcommunity.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 931-685-1336 for the file or send a public records request.
Can I check a contractor's license for work in Bedford County?
Yes, at search.cloud.commerce.tn.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
Which building code edition is cited for Bedford County?
The published code information cites the 2021 International Residential Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.
What if my property is near the Bedford County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Bedford County borders Coffee County, Lincoln County, Marshall County, Moore County, Rutherford County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Bedford County.