Who issues permits
Marshall County Building Codes and Zoning Department is the county office listed for building permits in Marshall County.
How to get a permit in Marshall County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the iWorQ portal at marshall.portal.iworq.net, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Marshall County permit records
The listing’s online portal is at marshall.portal.iworq.net ↗ and runs on iWorQ. Look for its public search and try the property address, parcel number or permit number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Marshall County Building Codes and Zoning Department at 931-359-0567. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Scheduling inspections
Submit inspection requests through the official iWorQ portal or call 931-359-0567; the county states that inspection requests and other submissions may be made through the portal.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Not published online
We did not find these in the office’s online materials. Ask the office at 931-359-0567 about:
- Fees: the current fee schedule and an estimate for your project. No fee schedule link was exposed on the accessible department page.
- Building codes: which code edition and local amendments apply. The current public page links a 2025 Building Codes Policy Statement, but the specific code edition was not readable in the accessible page.
- Exempt work: which minor work needs no permit. The current public department page links a permit guide but does not expose its exemption list in accessible text. Confirm exemptions with Building Codes before work.
- Review times: how long plan review currently takes. No general review timeline published.
- Work without a permit: the penalty for starting work before a permit is issued. The accessible Marshall County page does not expose specific fines, doubled fees, stop-work, or abatement rules. Confirm in the linked permit guide or county resolutions.
Tennessee rules that apply in Marshall County
These rules come from Tennessee law and state agencies, so they apply in Marshall County on top of anything the local office requires.
Building code
Partial statewide code
For one- and two-family homes and townhouses, the state residential code is the 2018 International Residential Code (IRC) with Tennessee amendments (Rule 0780-02-23-.02, last amended effective July 16, 2020). Fire sprinklers in homes are not required, and the IRC electrical chapters are replaced by the state electrical rules.
Read more
Energy work follows the 2018 IECC with amendments. For other buildings, a rule effective April 17, 2025 moved the state to the 2021 IBC, IFC, IPC, IMC, IFGC, IEBC and IECC (Rule 0780-02-02). Plans could use the older codes until August 15, 2025. The state electrical code is the 2017 National Electrical Code with Tennessee exceptions, effective October 1, 2018 (Rule 0780-02-01-.02). The state's own electrical program still listed the 2017 NEC as of August 2026. Local governments may enforce their own codes, but their codes must be no more than seven years older than the latest edition. They may not weaken the state standards without the State Fire Marshal's written approval. A city or county may also opt out of the state residential code by resolution (Rule 0780-02-23-.14). Where it does, no state residential building permit is required.
Outside city limits
It depends on the county. Some counties run their own building department and issue permits in unincorporated areas. In counties that have neither their own program nor an opt-out, a new home or an addition of 30 sq ft or more of interior space needs a state residential building permit.
Read more
The permit comes from a state-authorized issuing agent, and state deputy building inspectors do the inspections. Where the county has opted out, the unincorporated areas need no residential building permit (Rule 0780-02-23-.05). In most counties a state electrical permit is still required, and a septic system always needs a state permit.
Contractor and trade licensing
The Tennessee Board for Licensing Contractors licenses prime contractors for projects of $25,000 or more. Electrical, mechanical, plumbing, HVAC and roofing subcontractors need a license when their part of the job is $25,000 or more, and masonry subcontractors need one at $100,000 or more.
Read more
In Bradley, Davidson, Hamilton, Haywood, Knox, Marion, Robertson, Rutherford and Shelby counties, a home improvement license is also required for residential remodeling jobs from $3,000 to $24,999 (T.C.A. § 62-6-501 et seq.). Property owners building a home for their own use do not need a contractor license. In the state residential program, a property owner's permit is for an owner of record building a one-family home they plan to live in. Under T.C.A. § 62-6-103, an individual may get only one property owner's permit in any 24-month period. The owner does not need to show a license, but the work gets the same inspections (Rule 0780-02-23-.01, -.05). Local building departments set their own owner-permit rules.
Electrical, plumbing and HVAC
Electrical, plumbing and HVAC contractors are licensed by the Board for Licensing Contractors (the CE, CMC-A and CMC-C classifications) for jobs of $25,000 or more. For smaller jobs, the Board issues Limited Licensed Electrician (LLE) and Limited Licensed Plumber (LLP) licenses.
Read more
These are required in places that use the State Fire Marshal's Office for permits or inspections. Plumbing maintenance work under $500 is exempt from the LLP. Cities with their own programs may have local licensing instead. The State Fire Marshal's Office runs the state electrical permit and inspection program through about 100 contracted deputy electrical inspectors, and permits are sold online through the CORE system and by local issuing agents.
State programs that can affect your permit
State electrical inspection program
Outside the exempt jurisdictions, an electrical permit is required before installing wiring that must be inspected under Rule 0780-02-01-.04. Contracted deputy electrical inspectors do the inspections. The exempt jurisdictions are mostly larger cities (for example Knoxville, Chattanooga, Clarksville, Franklin and Murfreesboro), plus all of Davidson (Metro Nashville), Hamilton and Shelby counties. They run their own electrical permits.
State residential building permit program
The same State Fire Marshal's section issues residential building permits and inspects new one- and two-family homes, townhouses and additions of 30 sq ft or more of interior space. It covers places that neither enforce their own residential code nor have opted out.
Subsurface sewage disposal (septic) permits
Anyone installing a septic system, or repairing a failing one, needs a Septic System Construction Permit from TDEC's Division of Water Resources. Some contract counties (Blount, Davidson, Hamilton, Jefferson, Knox, Madison, Sevier, Shelby and Williamson) may require an extra local permit. A residential building permit application must certify that public sewer or a septic permit is available.
Manufactured housing
The State Fire Marshal's Manufactured Housing Section licenses manufacturers, retailers and installers of HUD-labeled manufactured homes. It also inspects installations under the Tennessee Manufactured Home Installation Act. Setting a manufactured or modular home is not "construction" under the state residential code, but any added site-built construction is.
Verified October 28, 2026 against Tennessee sources. Tennessee permit rules, sources and other counties
Common projects in Marshall County
Tennessee has statewide rules on file for 3 of these projects; they apply in Marshall County along with local permit requirements.
Decks
Under the state residential program, decks, porches and other additions of exterior space, and additions of less than 30 sq ft of interior space, count as renovation, so no state residential building permit is needed (Rule 0780-02-23-.01). Local building departments may require one.
Roof replacement
Under the state residential program, reroofing and residing count as "renovation" rather than "construction," so they don't need a state residential building permit (Rule 0780-02-23-.01). Cities and counties with their own building departments may still require a permit.
Tennessee source: law.cornell.edu ↗ · Roof replacement permit guide
Electrical work
In areas served by the state electrical program, a permit is required before installing wiring that must be inspected under Rule 0780-02-01-.04. A residential property owner can buy an individual-use permit for a home that is not for sale, lease or rent, and doesn't need to show a license.
Guides for other projects: Fences · Sheds and accessory buildings · Water heaters · Heating and air conditioning · Rooftop solar · Pools and spas · Accessory dwelling units · Demolition · All 21 project guides
Other permits you may need in Marshall County
These are separate from the building permit and come from the agencies named, under Tennessee rules.
Septic system
Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources
No property owner or installer may build, alter, extend or repair a septic (subsurface sewage disposal) system without a valid construction permit from TDEC, and TDEC will not issue one where a public sewer is accessible (Rule 0400-48-01-.06).
Read more
The site must first be shown suitable through its soil conditions, absorption rates and depth to groundwater and rock, which TDEC may determine itself or with an approved soil consultant's map, and construction permits expire 3 years after issuance. Installers must hold an annual TDEC installer permit, except owners or tenants doing their own work on the home they live in, and before a new home gets electrical service the electrical inspector must see proof of a septic permit application or a public sewer connection.
Water well
Tennessee Department of Environment and Conservation (TDEC), Division of Water Resources
Before drilling a water well, the property owner or the licensed well driller must submit a Notice of Intent to TDEC, and the driller may not start without proof it was filed (Rule 0400-45-09-.10). The state Notice of Intent fee ($75 per property site for a water well) does not apply in local jurisdictions approved to regulate and inspect wells.
Read more
Each new well must carry a TDEC registration tag, and the licensed driller must file a well completion report (Report of Well Driller) with TDEC within 60 days after the well is completed.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Marshall County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 931-359-0567 if you are unsure.
Can I apply for a permit online in Marshall County?
Yes. The listing includes an online permit portal at marshall.portal.iworq.net. The agency also publishes application forms online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Marshall County?
Marshall County Building Codes and Zoning Department has no fee schedule online, so the cost has to come from the office. Call the office at 931-359-0567 with the project type, size and estimated value for a quote.
How do I look up past permits for an address in Marshall County?
Start with the iWorQ portal at marshall.portal.iworq.net and search by address, parcel or permit number. If an older permit is not there, ask the office at 931-359-0567 for the file or send a public records request.
Can I check a contractor's license for work in Marshall County?
Yes, at verify.tn.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Marshall County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Marshall County borders Bedford County, Giles County, Lincoln County, Maury County, Rutherford County, Williamson County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Marshall County.
