County Permit SearchU.S. compliance directory
WisconsinTrempealeau County

Administrative overview · FIPS 55121

Trempealeau County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Trempealeau County Department of Land Management

For a project in or near Trempealeau County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

715-538-2311 ext. 223

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Trempealeau County Government Center, 18600 Hobson Street, Whitehall, WI 54773

Operating hours

Monday-Friday, 8:00 AM-4:30 PM Central; closed county holidays

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Trempealeau County

Who handles permitting for this jurisdiction?

Trempealeau County Department of Land Management is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 715-538-2311 ext. 223.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

The county permit includes building, HVAC, electrical, plumbing and final-occupancy inspections as applicable. Contact the Trempealeau County Department of Land Management/building inspector at 715-538-2311 ext. 223 to arrange required inspections; do not cover work before inspection. Reinspection after a corrective-action order is charged at the current fee-schedule rate.

Which codes and exemptions should I review?

Trempealeau County is the state-delegated permitting and inspection authority for new and altered one- and two-family dwellings under the Wisconsin Uniform Dwelling Code, Wis. Admin. Code SPS 320-325, and for camping units under SPS 327. County Land Management also administers the Trempealeau County Comprehensive Zoning Ordinance, sanitary/POWTS, shoreland, floodplain, erosion-control and related land-use requirements. State plan approval applies to public and other state-regulated commercial buildings when required. The county fee schedule states that building permits are not required for re-siding, re-roofing, finishing interior surfaces, installing cabinetry, and other repairs or restorations that the building inspector determines are not required to meet the current code. Generators, spas, hot tubs and pools may still require land-use/zoning and mechanical permits and inspections; local municipal acknowledgement is required for county permit applications.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?