Who issues permits
Eau Claire County Department of Planning & Development is the county office listed for building permits in Eau Claire County.
How to get a permit in Eau Claire County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the portal at esla.wi.gov.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
Up to 10 business days to review a complete application under SPS 320.09(11).
Search Eau Claire County permit records
The listing’s online portal is at esla.wi.gov ↗. Look for its public search and try the property address, parcel number or permit number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Eau Claire County Department of Planning & Development at 715-839-4741. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Eau Claire County Department of Planning & Development publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Eau Claire County Code Chapter 15.01 and Wisconsin Administrative Code SPS 305 (credentials), SPS 316 (electrical), SPS 320-325 (Uniform Dwelling Code), and SPS 381-387 (plumbing), including subsequent revisions. The county program applies in cities, villages, and towns within the county that have not adopted their own statutory building-code ordinance; separate zoning, shoreland, floodplain, sanitary, and local prerequisite permits may also apply.
Wisconsin: statewide code. Details
Work that may not need a permit
County building permits are not required for new detached accessory buildings or additions to them; re-siding; reroofing; window or door replacement; interior surface finishing; cabinetry; minor nonstructural repairs approved by the inspector; major equipment replacement such as a furnace, water heater, or air conditioner; normal HVAC, plumbing, or electrical repairs such as replacing switches, receptacles, light fixtures, or dimmers; agricultural structures; or children's play structures. Electrical permits and land-use approvals may still be required.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Call the Building Inspector at 715-839-2944 and request required inspections at least 48 hours in advance or within the applicable Wisconsin Administrative Code timeframe. The county states that it has two business days after notification to complete ordinary inspections and five business days after notification to complete a final inspection. Failure to request an inspection can require uncovering work at the owner/contractor's expense and carries a $155 fee; reinspection is also $155.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Fees may be doubled when work starts before permit issuance. A Uniform Dwelling Code violation is punishable by a $25-$500 forfeiture for each violation, and every day continuing after written notice is a separate offense. The 2026 fee schedule also charges $155 for failure to request an inspection, $155 for reinspection, and $1,000 for occupying an SPS 320-325 dwelling before final inspection.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Wisconsin rules that apply in Eau Claire County
These rules come from Wisconsin law and state agencies, so they apply in Eau Claire County on top of anything the local office requires.
Building code
Statewide code
The Uniform Dwelling Code (Wis. Admin. Code chs. SPS 320–325) is a statewide code for one- and two-family homes, including modular and manufactured home installations. It has applied since June 1, 1980, and it is Wisconsin's own code, not the IRC.
Read more
Local ordinances may not differ from it (Wis. Stat. § 101.65(1c)). Its energy rules have been based on the 2009 IECC since January 1, 2016. In 2026 the UDC Council recommended moving to the 2024 IRC, but that change has not been adopted. The Commercial Building Code (SPS 361–366) covers public buildings, places of employment and buildings with three or more units. It adopts the 2021 IBC, IECC, IMC, IFGC and IEBC with Wisconsin changes, took effect September 1, 2025, and has been required for plans submitted on or after November 1, 2025. The Wisconsin Electrical Code (SPS 316) adopts the 2023 NEC and took effect September 1, 2026, replacing the 2017 NEC. An update to the Wisconsin Plumbing Code (SPS 381–387) also took effect on that date.
Wisconsin Department of Safety and Professional Services (DSPS), Division of Industry Services ↗
Outside city limits
All land in Wisconsin is in a city, village or town. Rural areas are governed by towns, not left unincorporated. A city, village or town may enforce the UDC by ordinance, alone or jointly with neighbors. Where it hasn't, a county UDC ordinance applies if the county has one (Wis. Stat. § 101.65(1)(a)).
Read more
If no local unit has authority, you apply for the UDC permit to DSPS through its eSLA system, and a DSPS-appointed inspector for your county does the inspections. Smaller municipalities of 2,500 people or less must enforce the UDC, ask the county to, or have DSPS enforce it (§ 101.651). DSPS keeps a delegated agent list and an inspector look-up tool to show who covers your address.
Contractor and trade licensing
Wisconsin has no general contractor license for all construction. Anyone who pulls a building permit for a one- or two-family home must hold a Dwelling Contractor certification (for the business) and hold, or employ, a Dwelling Contractor Qualifier (an individual).
Read more
The Dwelling Contractor needs a surety bond of at least $25,000 or general liability insurance of at least $250,000 per occurrence. A restricted certification allows a bond of $5,000 to under $25,000, but limits the contractor to jobs costing no more than the bond (Wis. Stat. § 101.654(2m)). The Qualifier needs 12 hours of continuing education every 2 years (Wis. Stat. § 101.654). These rules do not apply to an owner who lives in the home, or will live there, and applies for a permit for work on it (§ 101.654(1)(b)). When an owner pulls the permit, the municipality must have them sign a statement warning that hiring an uninsured or unbonded contractor may leave them liable (§ 101.65(1r)).
Electrical, plumbing and HVAC
DSPS licenses electricians (registered, journeyman, master and residential classes) and electrical contractors. It also licenses plumbers (journeyman, master and restricted classes) and UDC inspectors.
Read more
Electrical work requires a state license or registration, but a homeowner may install, repair or maintain wiring in a home they own and live in, unless a local ordinance requires a license (Wis. Stat. § 101.862(4)(a)). Plumbing licensing does not apply to a property owner working in a one-family building they own and occupy as their home, except where a local ordinance requires a license (§ 145.06(4)(a)). DSPS issues commercial electrical permits where the municipality lacks authority, and it does not issue plumbing permits. Plumbing permits come from the municipality, sometimes after a state plan review.
State programs that can affect your permit
Private onsite wastewater treatment systems (POWTS)
Septic systems follow state rules (SPS 383–385). Permits come from your county or municipality, and some designs need DSPS plan review first. A simple gravity system for one home that uses an approved component manual is reviewed locally. Installation must be inspected.
State electrical permits and inspections
DSPS runs electrical permitting and inspection, sometimes through contracted inspection agencies. A state commercial electrical permit is needed for new or added services, feeders or branch circuits serving farms, public buildings, places of employment, campgrounds, manufactured home communities and similar sites. Since the 2023 NEC update, it is also needed for vacant land or structures that don't already have a permit. Where your municipality has no delegated authority, apply through DSPS's eSLA system.
Manufactured and modular homes
Manufactured home installations and modular dwellings fall under the UDC program and need a UDC permit like other new homes. DSPS also runs a manufactured home program.
Verified October 28, 2026 against Wisconsin sources. Wisconsin permit rules, sources and other counties
Common projects in Eau Claire County
Wisconsin has statewide rules on file for 1 of these projects; they apply in Eau Claire County along with local permit requirements.
Electrical work
A residential owner may install, repair or maintain electrical wiring in a home they own and live in without a state electrician license, unless a local ordinance requires one (Wis. Stat. § 101.862(4)(a)).
Read more
The work must follow the Wisconsin Electrical Code (2023 NEC, effective September 1, 2026), and local permit rules still apply.
Also named in Eau Claire County’s exemption summary.
Wisconsin source: web.archive.org ↗ · Electrical work permit guide
Named in Eau Claire County’s exemption summary (read it before assuming the work is exempt): Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Plumbing work · Window and door replacement
Guides for other projects: Decks · Fences · Rooftop solar · Pools and spas · Accessory dwelling units · Demolition · Septic systems · Driveways and culverts · All 21 project guides
Other permits you may need in Eau Claire County
These are separate from the building permit and come from the agencies named, under Wisconsin rules.
Septic system
County (governmental unit) under DSPS rules
Under SPS 383.21, a private onsite wastewater treatment system (POWTS) cannot be installed until the property owner has a sanitary permit from the county or other governmental unit and plan approval, and the permit expires after 2 years unless renewed.
Read more
The application needs plans signed by a registered POWTS designer, engineer or architect, or by the licensed master plumber responsible for the installation, plus a soil evaluation report signed by a certified soil tester. No part of the system may be covered or put into service until the county or DSPS has had a chance to inspect it.
Floodplain development
Wisconsin DNR
Counties, cities and villages must adopt floodplain ordinances that meet the minimums of ch. NR 116, and DNR reviews and approves them and coordinates FEMA approval for NFIP communities. Floodplain permits come from the local official, usually the zoning administrator.
Read more
The state model ordinance includes standards beyond NFIP minimums, such as prohibiting new residential, commercial or industrial structures in the floodway and requiring structures in the flood fringe to have the lowest floor elevated on fill two feet or more above the regional flood elevation.
Official page: dnr.wisconsin.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
WisDOT
WisDOT requires a connection permit for a driveway onto a state highway under Wis. Stat. s. 86.07(2)(a) and Trans 231, and there is no application fee. The same statute requires a permit from the maintaining authority for any work in a highway right-of-way, so for county highways, town roads or city streets, contact the county highway department, town or municipality.
Official page: wisconsindot.gov ↗ · Driveway and culvert guide
Erosion and sediment control
Wisconsin DNR
Projects that will disturb one or more acres, counting the whole project and any common plan of development or sale, need coverage under DNR's construction site stormwater general permit (WPDES WI-S067831), applied for with a Notice of Intent at least 14 working days before construction.
Read more
The landowner must prepare an erosion control and stormwater management plan, inspect weekly, and file a Notice of Termination when done. For one- and two-family home sites under one acre, the Uniform Dwelling Code (SPS 321.125) still requires erosion and sediment control practices.
Water well
Wisconsin DNR
Before a new private well is built, the owner or well constructor must obtain a DNR Well Construction Notification number; high capacity wells and reconstruction of existing wells are exempt from notification.
Read more
Wells must be built to NR 812 standards, DNR licenses well drillers and pump installers under NR 146, and a Well Construction Report must be submitted to DNR within 30 days, usually by the driller.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Eau Claire County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 715-839-4741 if you are unsure.
Can I apply for a permit online in Eau Claire County?
Yes. The listing includes an online permit portal at esla.wi.gov. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Eau Claire County?
Eau Claire County Department of Planning & Development publishes its fee schedule online (cms2.revize.com). Look up your project type there, and ask the office at 715-839-4741 for an estimate if your project is not listed.
How do I look up past permits for an address in Eau Claire County?
Start with the portal at esla.wi.gov and search by address, parcel or permit number. If an older permit is not there, ask the office at 715-839-4741 for the file or send a public records request.
Can I check a contractor's license for work in Eau Claire County?
Yes, at license.wi.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Eau Claire County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Eau Claire County borders Buffalo County, Chippewa County, Clark County, Dunn County, Jackson County, Pepin County, and others.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Eau Claire County.