County Permit SearchU.S. compliance directory
TexasThrockmorton County

Administrative overview · FIPS 48447

Throckmorton County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Throckmorton County Judge's Office (Floodplain Administration); Texas Commission on Environmental Quality Region 3 OSSF Program

For a project in or near Throckmorton County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Throckmorton County Judge and floodplain contact: 940-849-8805; TCEQ Region 3 Abilene: 325-698-9674

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Throckmorton County Judge, 105 N Minter Avenue, Throckmorton, TX 76483; TCEQ Region 3, 1977 Industrial Boulevard, Abilene, TX 79602-7833

Operating hours

Operating hours not verified

Review expectation

No county floodplain review time is published. TCEQ must approve or deny a complete state-administered OSSF application and planning materials within 30 days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Throckmorton County

Who handles permitting for this jurisdiction?

Throckmorton County Judge's Office (Floodplain Administration); Texas Commission on Environmental Quality Region 3 OSSF Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Throckmorton County Judge and floodplain contact: 940-849-8805; TCEQ Region 3 Abilene: 325-698-9674 and request the current application route before preparing a final submittal.

How long might review take?

No county floodplain review time is published. TCEQ must approve or deny a complete state-administered OSSF application and planning materials within 30 days.

How are inspections scheduled?

Contact County Judge and floodplain administrator Caleb Hodges at 940-849-8805 before development in a mapped floodplain; the county publishes no online permit form or inspection scheduler. For a state-administered OSSF, submit the TCEQ application, site evaluation, planning materials, and fee to Region 3, then call 325-698-9674 to coordinate the required construction inspection before the system is covered or operated.

Which codes and exemptions should I review?

Throckmorton County has minimum floodplain-management regulations for unincorporated flood-hazard areas, and the current state directory identifies County Judge Caleb Hodges as its floodplain contact. The county publishes no general building department and no adopted countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition. Throckmorton does not appear in TCEQ's current report of locally authorized OSSF programs, so septic permitting falls to TCEQ Region 3 under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285 unless the state confirms a newer local delegation. The City of Throckmorton may impose separate municipal requirements inside its jurisdiction. Throckmorton County publishes no general permit or exemption list for ordinary cosmetic or structural work outside regulated floodplains. State OSSF exceptions may include a qualifying system serving one single-family dwelling on a tract of at least 10 acres after a licensed site evaluation, with every system component at least 100 feet from the property line and all other rule conditions met; qualifying grandfathered systems and specified emergency repairs reported in writing within 72 hours may also be exempt.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?