County Permit SearchU.S. compliance directory
TexasTitus County

Administrative overview · FIPS 48449

Titus County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Titus County Environmental Inspection Service and Titus County Clerk Platting and Subdivision Office

For a project in or near Titus County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Environmental Inspection Service (OSSF and floodplain): 903-572-6641; County Clerk platting: 903-577-6796

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Titus County Environmental Inspection Service, 304 S Van Buren Avenue, Mt. Pleasant, TX 75455; Titus County Clerk, 100 W 1st Street, Suite 204, Mt. Pleasant, TX 75455

Operating hours

Environmental Inspection Service: N/A; County Clerk: Monday-Friday 8:00 a.m.-12:00 p.m. and 1:00 p.m.-4:45 p.m.

Review expectation

Titus County's subdivision rules require the OSSF permitting authority to approve or deny subdivision or development OSSF planning materials in writing within 45 days of receipt. The checklist says complete subdivision documentation should be submitted at least 45 days before requested Commissioners Court consideration. No separate ordinary OSSF or floodplain review target is published.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Titus County

Who handles permitting for this jurisdiction?

Titus County Environmental Inspection Service and Titus County Clerk Platting and Subdivision Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Environmental Inspection Service (OSSF and floodplain): 903-572-6641; County Clerk platting: 903-577-6796 and request the current application route before preparing a final submittal.

How long might review take?

Titus County's subdivision rules require the OSSF permitting authority to approve or deny subdivision or development OSSF planning materials in writing within 45 days of receipt. The checklist says complete subdivision documentation should be submitted at least 45 days before requested Commissioners Court consideration. No separate ordinary OSSF or floodplain review target is published.

How are inspections scheduled?

Obtain the OSSF permitting packet from the Environmental Inspection Service, submit the application, site evaluation and required design/planning materials, and call 903-572-6641 to coordinate authorization to construct and the installation inspection before covering or operating the system. The same office approves subdivision OSSF and floodplain information before a plat goes to Commissioners Court. Subdivision applicants must separately coordinate with the County Clerk at 903-577-6796.

Which codes and exemptions should I review?

Titus County Environmental Inspection Service is the county's TCEQ-authorized OSSF permitting authority and designated representative and also reviews floodplain requirements for unincorporated development. OSSF work must comply with the county's TCEQ-approved local order, Texas Health and Safety Code Chapter 366, and 30 TAC Chapter 285. County subdivision rules require one acre of usable property for new single-family OSSF lots, whether or not served by public water, and regulate rural subdivision roads and drainage. The county publishes no adopted general countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition; incorporated municipalities may impose separate building requirements. Titus County states that work on any portion of an existing conventional system's lateral lines requires a new permit. Repairs to solid lines, tank lids, broken chlorinators, sprinkler heads, electrical components, and pumps do not require a new permit. An owner may install the OSSF personally, but anyone hired for OSSF work must hold the appropriate license, except a licensed electrician hired for wiring. Existing small lots created before January 1, 1988 may be approved if state separation distances, site evaluation, and all other local-order requirements are met. No county exemption list is published for ordinary cosmetic or structural building work outside floodplain, subdivision, or septic regulation.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?