County Permit SearchU.S. compliance directory
TexasTerry County

Administrative overview · FIPS 48445

Terry County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Terry County Judge's Office (Floodplain Administration); Texas Commission on Environmental Quality Region 2 OSSF Program

For a project in or near Terry County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Terry County Judge's Office: 806-637-6421; county floodplain contact: 806-637-4547; TCEQ Region 2 Lubbock: 806-796-7092

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Terry County Courthouse, 500 W Main Street, Room 102, Brownfield, TX 79316; TCEQ Region 2, 5012 50th Street, Suite 100, Lubbock, TX 79414-3426

Operating hours

Operating hours not verified

Review expectation

No county floodplain review time is published. TCEQ must approve or deny a complete state-administered OSSF application and planning materials within 30 days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Terry County

Who handles permitting for this jurisdiction?

Terry County Judge's Office (Floodplain Administration); Texas Commission on Environmental Quality Region 2 OSSF Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Terry County Judge's Office: 806-637-6421; county floodplain contact: 806-637-4547; TCEQ Region 2 Lubbock: 806-796-7092 and request the current application route before preparing a final submittal.

How long might review take?

No county floodplain review time is published. TCEQ must approve or deny a complete state-administered OSSF application and planning materials within 30 days.

How are inspections scheduled?

Contact the Terry County Judge's Office at 806-637-6421 or the listed county floodplain contact at 806-637-4547 before development in a mapped floodplain; no county online application or inspection scheduler is published. For a state-administered OSSF, submit the TCEQ application, site evaluation, planning materials, and fee to Region 2, then call 806-796-7092 to coordinate the required construction inspection before the system is covered or operated.

Which codes and exemptions should I review?

Terry County participates in the National Flood Insurance Program and regulates development in unincorporated flood-hazard areas through its county floodplain administration; the current state directory lists Chris Snapp as the county contact, while a December 2025 FEMA submission was signed by County Judge Tony Serbantez as local floodplain administrator. The county publishes no general building department and no adopted countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition. Terry does not appear in TCEQ's current report of locally authorized OSSF programs, so septic permitting falls to TCEQ Region 2 under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285 unless the state confirms a newer local delegation. Incorporated municipalities and their ETJs may impose separate requirements. Terry County publishes no general permit or exemption list for ordinary cosmetic or structural work outside regulated floodplains. State OSSF exceptions may include a qualifying system serving one single-family dwelling on a tract of at least 10 acres after a licensed site evaluation, with every system component at least 100 feet from the property line and all other rule conditions met; qualifying grandfathered systems and specified emergency repairs reported in writing within 72 hours may also be exempt.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?