County Permit SearchU.S. compliance directory
TexasHockley County

Administrative overview · FIPS 48219

Hockley County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Hockley County Septic Program / Hockley County Floodplain Administrator

For a project in or near Hockley County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Septic Designated Representative Jason Turner: 806-241-5066; County/Floodplain Administrator: 806-894-6856

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Hockley County Courthouse, 802 Houston Street, Levelland, TX 79336

Operating hours

Operating hours not verified

Review expectation

The OSSF permitting authority must approve or deny a complete permit application and planning materials within 30 days of receipt. No county-specific general-construction or floodplain review timeline was published.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Hockley County

Who handles permitting for this jurisdiction?

Hockley County Septic Program / Hockley County Floodplain Administrator is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Septic Designated Representative Jason Turner: 806-241-5066; County/Floodplain Administrator: 806-894-6856 and request the current application route before preparing a final submittal.

How long might review take?

The OSSF permitting authority must approve or deny a complete permit application and planning materials within 30 days of receipt. No county-specific general-construction or floodplain review timeline was published.

How are inspections scheduled?

For septic application and inspection instructions, contact Hockley County's designated representative Jason Turner at 806-241-5066 or hockleycountyseptic@gmail.com before construction. A permit and approved plan are required before constructing, altering, repairing, extending, or operating an OSSF, and the installation must be available for the permitting authority's required inspection. Contact the Hockley County Judge/Floodplain Administrator through the courthouse at 806-894-6856 before development in a mapped flood-hazard area.

Which codes and exemptions should I review?

Hockley County administers an OSSF program through its designated representative under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. The county also participates in the National Flood Insurance Program and administers minimum floodplain-management regulations under Texas Water Code Section 16.3145 through the County Judge as Floodplain Administrator. The official county materials reviewed do not identify a countywide ICC building-code edition or a general construction-permit program for unincorporated property. No county-specific list of cosmetic or minor general-construction exemptions was published. Under the applicable state OSSF rules, a permit may be unnecessary for a single-family system on a tract of at least 10 acres only when a licensed site evaluation is obtained, the system complies with Chapter 285, every component is at least 100 feet from the property line, effluent remains on the tract, only one dwelling is served, and no nuisance or groundwater pollution results. Qualifying grandfathered systems may remain exempt. Defined emergency repairs do not require advance permitting but must be reported in writing within 72 hours after work begins.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?