County Permit SearchU.S. compliance directory
TexasStephens County

Administrative overview · FIPS 48429

Stephens County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Stephens County Commissioners Court / County Floodplain Contact; Texas Commission on Environmental Quality Region 3 for OSSF

For a project in or near Stephens County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Stephens County floodplain contact/County Treasurer: 254-559-7333; TCEQ Region 3 Abilene: 325-698-9674

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Stephens County Courthouse, 200 W Walker Street, Breckenridge, TX 76424; TCEQ Region 3, 1977 Industrial Boulevard, Abilene, TX 79602-7833

Operating hours

Operating hours not verified

Review expectation

No county floodplain review time was published. TCEQ must approve or deny a complete state-administered OSSF application and planning materials within 30 days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Stephens County

Who handles permitting for this jurisdiction?

Stephens County Commissioners Court / County Floodplain Contact; Texas Commission on Environmental Quality Region 3 for OSSF is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Stephens County floodplain contact/County Treasurer: 254-559-7333; TCEQ Region 3 Abilene: 325-698-9674 and request the current application route before preparing a final submittal.

How long might review take?

No county floodplain review time was published. TCEQ must approve or deny a complete state-administered OSSF application and planning materials within 30 days.

How are inspections scheduled?

Contact the Stephens County floodplain contact through County Treasurer Kelsey Cornwall at 254-559-7333 before construction in a mapped floodplain; no county online application or inspection scheduler is published. For a state-administered OSSF, submit the TCEQ application, site evaluation, planning materials, and fee to Region 3, then call 325-698-9674 to arrange the required construction inspection before the system is covered or operated.

Which codes and exemptions should I review?

Stephens County's current July 27, 2026 Subdivision Rules and Regulations govern land divisions in unincorporated areas under Texas Local Government Code Chapters 232 and 242 and require floodplain compliance under Texas Water Code Chapter 16. Construction in a mapped floodplain requires a Stephens County flood permit, and subdivision plats must show flood elevations and satisfy county drainage requirements. The county publishes no general building department and no adopted countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition. Unless a local OSSF authorized-agent status is confirmed for the site, septic permitting is administered by TCEQ Region 3 under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No county permit is published for ordinary cosmetic or structural work outside regulated floodplains and subdivision development. The 2026 subdivision rules exempt qualifying divisions without a public-use dedication, including land retained for qualifying agriculture/farm/ranch/wildlife/timber use, certain transfers creating four or fewer tracts for relatives within the third degree, divisions where every lot exceeds 10 acres, and other statutory categories; a public-use dedication triggers platting regardless. State OSSF exceptions may cover a qualifying 10-acre single-family tract, a qualifying grandfathered system, and specified emergency repairs reported within 72 hours.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?