Who issues permits

Milam County Planning and Development is the county office listed for building permits in Milam County.

Also listed: Fire Marshal's Office, and Health Department.

How to get a permit in Milam County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the portal at milamcountypermits.com, or with the published application forms.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

The Fire Marshal must issue or deny a complete building-permit application within 30 days; if no decision is made, it is deemed approved for fire-code purposes. A properly requested final fire inspection must begin within ten business days. OSSF authorizations to construct are valid for one year.

Search Milam County permit records

The listing’s online portal is at milamcountypermits.com ↗. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Milam County Planning and Development at 254-627-1760. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Milam County Planning and Development publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

Milam County Fire Code adopted and effective May 26, 2025, incorporating the 2024 International Fire Code with county/NCTCOG amendments, the 2024 International Wildland-Urban Interface Code, 2024 NFPA 101 Life Safety Code, and NFPA 70 provisions identified by the county code; Milam County Flood Damage Prevention Order and Ordinance; OSSF rules under 30 TAC Chapter 285. Fire-code building permits apply to unincorporated commercial establishments, public buildings, and multifamily dwellings of four or more units.

Texas: partial statewide code. Details

Work that may not need a permit

The county development permit covers new structures, additions, alterations, replacements, relocations, clearing, fill, mining, drilling, grading, buried utilities, excavation, watercourse changes, drainage work, subdivisions, and individual water/sewer systems; no work may begin before issuance. The fire-code building permit does not cover one-to-three-family dwellings and excludes an industrial facility with an OSHA-compliant fire brigade, but these projects may still require the general development, floodplain, septic, driveway, or municipal-ETJ permits. Ordinary maintenance of an EV charging station is not treated as a modification requiring a fire construction permit.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Use MilamCountyPermits.com to request Fire Marshal inspections. The owner must submit a written final-inspection request on or before completion; the Fire Marshal must begin within ten business days. A passing project receives a Certificate of Compliance, while a failed project may not be occupied. Coordinate OSSF inspections with the Health Department at 254-697-7039; construction, alteration, repair, or extension cannot begin before written authorization, and approval follows a successful inspection.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

The development application lists a $2,500 penalty for failing to secure a permit outside the floodplain and $10,000 within the floodplain; a permit obtained through false statements may be revoked and work must cease until reissued. Fire-code violations are Class C misdemeanors punishable by up to $500, with each day after notice a separate offense; the county may also seek an injunction or a $500-per-day civil penalty. Failure to maintain or inspect an aerobic septic system as required may also be fined up to $500 per day, and OSSF reinspection costs $100.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Texas rules that apply in Milam County

These rules come from Texas law and state agencies, so they apply in Milam County on top of anything the local office requires.

Building code

Partial statewide code

Local Government Code §214.212 adopts the International Residential Code as it existed on May 1, 2012 as the municipal residential building code, applying to construction, alteration, remodeling, enlargement, and repair of residential structures in a municipality.

Read more

Cities may add, modify, or remove requirements through local amendments adopted by ordinance after a public hearing. §214.216 does the same for commercial buildings using the International Building Code (May 1, 2012). These codes do not apply to the installation and maintenance of electrical wiring (§214.213). Statewide, the residential energy code is the energy-efficiency chapter of the 2015 IRC, effective September 1, 2016 (Health and Safety Code §388.003).

Texas Legislature (Local Government Code Chapter 214); State Energy Conservation Office for the energy code ↗

Outside city limits

Outside city limits, Texas counties have limited building authority. Under Local Government Code Chapter 233, Subchapter F, a county that adopts an order opting in can require new single-family homes and duplexes (and additions that increase square footage or value by more than 50 percent) to conform to the IRC as published on May 1, 2008, or to the IRC that applies in the county seat.

Read more

The law does not require prior county approval before construction begins, and the county may not charge a fee to enforce the standards. Instead, the builder contracts for at least three inspections (foundation before concrete, framing and mechanical before drywall, and completion) by a licensed engineer, registered architect, TREC-licensed professional inspector, or other qualified inspector listed in the statute. The county may require notice before work starts and a report of the final inspection. On-site sewage (septic) permits are separate and required throughout the state.

Contractor and trade licensing

Texas abolished its Texas Residential Construction Commission on September 1, 2009, and our review of state sources found no state license for general or residential building contractors. The state does license trades: electricians and air conditioning and refrigeration contractors through TDLR, and plumbers through the Texas State Board of Plumbing Examiners.

Read more

Homeowners have state-law exemptions for some work on their own homes (see the trade section), but cities can still require permits and inspections.

Electrical, plumbing and HVAC

Electrical: TDLR says anyone who performs electrical work in Texas must be licensed, but Occupations Code §1305.003(a)(6) exempts work "not specifically regulated by a municipal ordinance" that is performed in or on a dwelling by a person who owns and lives in it.

Read more

City rules can override this exemption. Plumbing: plumbers are licensed by the Texas State Board of Plumbing Examiners, and a property owner does not need a license to do plumbing in their own homestead (§1301.051). HVAC: air conditioning and refrigeration contractors are licensed by TDLR, and the licensing chapter does not apply to work in a building owned solely by the person as their home (§1302.053). These exemptions cover state licensing only. Local permits and inspections may still be required.

State programs that can affect your permit

On-site sewage facilities (septic)

TCEQ rules require a permit and approved plan to construct, alter, repair, extend, or operate an on-site sewage facility. Permits are usually issued by a local authorized agent, often the county. Where no local authority exists, the TCEQ regional office issues them. The rules are in 30 TAC Chapter 285.

Official page: tceq.texas.gov ↗

Statewide residential energy code

The State Energy Conservation Office administers the single-family energy code: Chapter 11 of the 2015 IRC, effective September 1, 2016. Outside city limits, compliance can be shown through an accredited program, inspections by code-certified inspectors, or a builder certification form (Health and Safety Code §388.004).

Official page: comptroller.texas.gov ↗

Floodplain management

Building in mapped flood hazard areas is subject to local floodplain management rules under the National Flood Insurance Program, and your community may require a floodplain development permit. The Texas Water Development Board's NFIP page notes that the state does not keep elevation certificates on file, but your local floodplain administrator should.

Official page: twdb.texas.gov ↗

Verified October 28, 2026 against Texas sources. Texas permit rules, sources and other counties

Common projects in Milam County

Texas has statewide rules on file for 5 of these projects; they apply in Milam County along with local permit requirements.

  • Roof replacement

    Texas Property Code §202.011 limits property owners' associations from prohibiting shingles designed to be wind or hail resistant, energy efficient, or solar generating, subject to conditions in the statute.

    Texas source: tcss.legis.texas.gov ↗ · Roof replacement permit guide

  • Water heaters

    A property owner does not need a state plumbing license to do plumbing in their own homestead (Occupations Code §1301.051). City permit and inspection requirements still apply.

    Texas source: tcss.legis.texas.gov ↗ · Water heaters permit guide

  • Heating and air conditioning

    State air conditioning and refrigeration licensing does not apply to work in a building owned solely by the person as their home (Occupations Code §1302.053). Other HVAC contractors need a TDLR license, and city permits still apply.

    Texas source: tcss.legis.texas.gov ↗ · Heating and air conditioning permit guide

  • Electrical work

    State law exempts electrical work on a dwelling by a person who owns and resides in it from state licensing, but only for work not specifically regulated by a municipal ordinance (Occupations Code §1305.003(a)(6)).

    Read more

    Cities can still require permits and licensed electricians. Texas Property Code §202.019 limits HOA restrictions on permanently installed standby electric generators.

    Texas source: tdlr.texas.gov ↗ · Electrical work permit guide

  • Rooftop solar

    Texas Property Code §202.010 generally prohibits property owners' associations from prohibiting or restricting the installation of solar energy devices. Exceptions allow HOAs to limit devices on common property, devices that extend above or beyond the roofline, devices in a fenced yard that are taller than the fence, and installations made without the association's prior approval, among others.

    Texas source: tcss.legis.texas.gov ↗ · Rooftop solar permit guide

Named in Milam County’s exemption summary (read it before assuming the work is exempt): Septic systems · Driveways and culverts · Floodplain development · Generators and EV chargers

Guides for other projects: Decks · Fences · Sheds and accessory buildings · Pools and spas · Accessory dwelling units · Demolition · Plumbing work · Kitchen and bathroom remodels · All 21 project guides

Other permits you may need in Milam County

These are separate from the building permit and come from the agencies named, under Texas rules.

  • Septic system

    TCEQ or its local authorized agent

    A permit and approved plan are required to construct, alter, repair, extend or operate an on-site sewage facility (OSSF) under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. Most permits are issued by a local authorized agent of TCEQ (such as a county, city or health district), and the TCEQ regional office is the permitting authority where no local program is authorized; local rules can be stricter.

    Read more

    The process starts with a site evaluation, including a soil analysis, by a TCEQ-licensed site evaluator or professional engineer, and the permitting authority must approve or deny the application within 30 days.

    Official page: tceq.texas.gov ↗ · Septic permit guide

  • Floodplain development

    Texas Water Development Board (TWDB)

    TWDB houses the state NFIP coordinator, and its Flood Community Assistance Program supports local floodplain management with training and technical help. Cities and counties in the NFIP adopt a flood damage prevention ordinance, and the local floodplain administrator issues floodplain development permits for work in the special flood hazard area.

    Official page: twdb.texas.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Texas Department of Transportation (TxDOT)

    A TxDOT permit is required before building an access connection (driveway) to a state highway, or before a change in property use or traffic that would trigger stricter access standards (43 TAC 11.52).

    Read more

    The TxDOT district engineer approves permits that meet the Access Management Manual, and an engineering study may be required. For county roads and city streets, check with the county or city.

    Official page: law.cornell.edu ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Texas Commission on Environmental Quality (TCEQ)

    Construction that disturbs 1 acre or more, or is part of a larger common plan of development or sale that will disturb 1 acre or more, needs coverage under TCEQ's Construction General Permit (TXR150000) if it discharges stormwater to surface water.

    Read more

    Operators must prepare and follow a Stormwater Pollution Prevention Plan (SWP3) before construction starts. Clearing or building in the Edwards Aquifer recharge and contributing zones may have additional requirements, handled by TCEQ regional offices.

    Official page: tceq.texas.gov ↗

  • Water well

    Texas Department of Licensing and Regulation (TDLR)

    TDLR licenses water well drillers and pump installers. Within 60 days after drilling, deepening or altering a well, the driller must send a State of Texas Well Report to TDLR, the well owner and the local groundwater conservation district, if there is one (16 TAC 76.70). Groundwater conservation districts set their own rules, so check with the district for your area.

    Official page: law.cornell.edu ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Milam County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 254-627-1760 if you are unsure.

Can I apply for a permit online in Milam County?

Yes. The listing includes an online permit portal at milamcountypermits.com. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Milam County?

Milam County Planning and Development publishes its fee schedule online (fi360-static.s3.amazonaws.com). Look up your project type there, and ask the office at 254-627-1760 for an estimate if your project is not listed.

How do I look up past permits for an address in Milam County?

Start with the portal at milamcountypermits.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 254-627-1760 for the file or send a public records request.

Can I check a contractor's license for work in Milam County?

Yes, at www2.tceq.texas.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Milam County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Milam County borders Bell County, Burleson County, Falls County, Lee County, Robertson County, Williamson County.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Milam County.