Administrative overview · FIPS 48051

Burleson County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Burleson County Environmental Department / Office of Floodplain Administration

For a project in or near Burleson County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

979-567-2360 (Environmental/OSSF); 979-567-2333 (county and floodplain office); 979-567-0076 (Road & Bridge utility permits)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Burleson County Environmental Office, 100 W. Buck St., Suite 303, Caldwell, TX 77836; Floodplain Office, 100 W. Buck St., Suite 306, Caldwell, TX 77836

Operating hours

Monday-Friday 8:00 AM-5:00 PM; Saturday-Sunday closed.

Review expectation

The Burleson County Designated Representative must approve or deny complete OSSF planning materials within 30 days. The county publishes no standard floodplain review timeline; its utility right-of-way permit materials state approval may take up to two weeks after a complete application.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Burleson County

Who handles permitting for this jurisdiction?

Burleson County Environmental Department / Office of Floodplain Administration is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 979-567-2360 (Environmental/OSSF); 979-567-2333 (county and floodplain office); 979-567-0076 (Road & Bridge utility permits) and request the current application route before preparing a final submittal.

How long might review take?

The Burleson County Designated Representative must approve or deny complete OSSF planning materials within 30 days. The county publishes no standard floodplain review timeline; its utility right-of-way permit materials state approval may take up to two weeks after a complete application.

How are inspections scheduled?

Submit the OSSF application, technical sheet, site/soil evaluation, system design, required affidavits or maintenance contract, 911 address verification, and fee to the Environmental Office; email submissions are not accepted. The Designated Representative reviews within 30 days and issues an Authorization to Construct. The licensed installer requests the construction inspection; after a successful inspection the county issues a License to Operate, which is required before use. Floodplain applications, plans, and specifications are submitted to the Floodplain Office before construction.

Which codes and exemptions should I review?

Burleson County states that it has no authority to create or enforce building codes or require building inspections in unincorporated areas; city limits are handled by the applicable city. The county does enforce subdivision regulations, county right-of-way permits, a 2008 Flood Damage Prevention Order/NFIP requirements for floodplain development, and a TCEQ-approved 2023 OSSF Order with more stringent county standards. No general cosmetic-work exemption list was published. Every septic system in Burleson County requires a permit regardless of acreage, including new, modified, and repaired systems. Floodplain development permits are required only for development within the floodplain; construction outside the floodplain does not require a county floodplain permit. County OSSF rules require at least one acre per single-family dwelling with public water and two acres with a private well under the current order, with limited grandfathered/subdivision provisions.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?