County Permit SearchU.S. compliance directory
TexasLee County

Administrative overview · FIPS 48287

Lee County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Lee County Development Services Department

For a project in or near Lee County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Lee County Development Services: 979-212-8070

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Temporary physical address: Lee County Annex, 898 E. Richmond Street, Suite 203, Giddings, TX 78942; mailing address: 200 S. Main Street, Suite 203, Giddings, TX 78942

Operating hours

Operating hours not verified

Review expectation

N/A; no county review-duration target is published. The development/floodplain permit is valid for one year and must be renewed if work is not completed within that period. A complete OSSF application remains subject to the 30-day approval-or-denial period in 30 TAC Chapter 285.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Lee County

Who handles permitting for this jurisdiction?

Lee County Development Services Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Lee County Development Services: 979-212-8070 and request the current application route before preparing a final submittal.

How long might review take?

N/A; no county review-duration target is published. The development/floodplain permit is valid for one year and must be renewed if work is not completed within that period. A complete OSSF application remains subject to the 30-day approval-or-denial period in 30 TAC Chapter 285.

How are inspections scheduled?

Submit the completed development packet, survey, flood map, and—when any part of the site is in the floodplain—plans, specifications, latitude/longitude, elevation certificate, and required professional certifications to Development Services at permitting@co.lee.tx.us or call 979-212-8070. The applicant consents to county compliance inspections, must furnish any required elevation certificate within 10 business days after foundation completion, and may not occupy or use the development until a Certificate of Compliance is issued. For OSSF inspection, give at least three working days' advance notice and leave the installation uncovered until approval.

Which codes and exemptions should I review?

Lee County requires a development application for residential, commercial, oil/gas, pipeline, water, manufactured-home, and other development in unincorporated areas; individual structures over 100 square feet require a permit. Projects must receive either a floodplain exemption certificate or a permit under the Lee County Flood Damage Prevention Ordinance. In the FEMA 1%-annual-chance floodplain, residential lowest floors must be at or above BFE; nonresidential buildings must be elevated or floodproofed; foundations, materials, utilities, and backflow protection must meet the published flood standards and receive professional certification. Every OSSF must be permitted under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No general adopted county ICC code edition was found. An individual building of 100 square feet or less does not require the county development permit. County guidelines also list roofing, painting, general repair, livestock pens and fences, and remodels that do not change a structure's square footage as not requiring a development application. Development outside the mapped 100-year floodplain receives a floodplain exemption certificate rather than a floodplain permit. All septic systems must be permitted; no acreage exception is published locally.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?