County Permit SearchU.S. compliance directory
CaliforniaAlpine County

Administrative overview · FIPS 06003

Alpine County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Alpine County Community Development Department, Building Safety Division and Planning Division

For a project in or near Alpine County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

530-694-2140 (Community Development / Building Safety); 530-694-2140 ext. 428 (Building Official Tony Creter)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Alpine County Community Development Department, 50 Diamond Valley Road, Markleeville, CA 96120

Operating hours

Monday-Friday, 8:00 a.m.-5:00 p.m.

Review expectation

Normal plan review is three weeks; the county warns that peak building seasons and corrections can extend the review period.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Alpine County

Who handles permitting for this jurisdiction?

Alpine County Community Development Department, Building Safety Division and Planning Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 530-694-2140 (Community Development / Building Safety); 530-694-2140 ext. 428 (Building Official Tony Creter).

How long might review take?

Normal plan review is three weeks; the county warns that peak building seasons and corrections can extend the review period.

How are inspections scheduled?

Building applications are submitted through the Alpine County iWorq portal; inspections are part of the Building Safety Division process. Contact Community Development at 530-694-2140 for scheduling and requirements. The county’s guide states normal plan review is about three weeks, with peak-season delays possible.

Which codes and exemptions should I review?

The current published Alpine County building references identify California Code of Regulations Title 24 and documents based on the 2022 California Building Code, 2022 California Residential Code, and 2022 Wildland-Urban Interface regulations; no 2026-specific local edition was published in the reviewed materials. Alpine County requires permits for new buildings over 120 square feet, tenant improvements, solar systems, patio covers, enclosed patios, EV charging stations, additions/alterations, pools/spas, carports/garages/barns, fences over 6 feet, retaining walls over 4 feet or supporting surcharge, electrical/plumbing/mechanical/structural repairs, re-roofing, temporary structures, grading of 50 cubic yards or more, demolition, erosion control, and wall/monument signs. Work below those listed thresholds may be exempt, but setbacks still apply and the Building Safety Division should confirm applicability.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?