County Permit SearchU.S. compliance directory
CaliforniaEl Dorado County

Administrative overview · FIPS 06017

El Dorado County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

El Dorado County Planning and Building Department, Building Division

For a project in or near El Dorado County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(530) 621-5315 (Building); (530) 621-5377 (inspections); (530) 573-3330 (South Lake Tahoe office)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Placerville Office, 2850 Fairlane Court, Placerville, CA 95667; South Lake Tahoe Office, 924 B Emerald Bay Road, South Lake Tahoe, CA 96150

Operating hours

Placerville: Monday, Tuesday, Thursday, and Friday 8 a.m.-noon walk-ins and 1-4 p.m. appointments; Wednesday 9 a.m.-noon walk-ins and 1-4 p.m. appointments. South Lake Tahoe: Monday-Thursday 8 a.m.-noon and 1-3 p.m.; closed Friday.

Review expectation

The county FAQ says processing can range from a few days to several weeks depending on project complexity and application completeness; plans are reviewed in received order. Applications remain valid for 365 days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for El Dorado County

Who handles permitting for this jurisdiction?

El Dorado County Planning and Building Department, Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (530) 621-5315 (Building); (530) 621-5377 (inspections); (530) 573-3330 (South Lake Tahoe office).

How long might review take?

The county FAQ says processing can range from a few days to several weeks depending on project complexity and application completeness; plans are reviewed in received order. Applications remain valid for 365 days.

How are inspections scheduled?

Schedule inspections through eTRAKiT or call (530) 621-5377. Foundation, framing, rough plumbing, electrical and mechanical, insulation, lath or gypsum, and final inspections may be required depending on project scope.

Which codes and exemptions should I review?

Effective January 1, 2026, El Dorado County requires the 2025 California Building Standards Code (Title 24) for applications dated January 1, 2026 or later, including Administrative, Building Volumes 1 and 2, Residential, Electrical, Mechanical, Plumbing, Energy, Wildland-Urban Interface, Historical, Fire, Existing, Green Building Standards, and Referenced Standards Codes, plus El Dorado County Building Title 110, Zoning Title 130, grading ordinances, and applicable local requirements. Projects initiated before January 1, 2026 remain under 2022 codes during plan check and inspection as published. The county's 2025 CBC exemption sheet lists one-story detached accessory structures up to 120 square feet subject to WUI rules, fences up to 7 feet, oil derricks, retaining walls up to 4 feet unless surcharge applies, qualifying ground-supported water tanks up to 5,000 gallons, qualifying sidewalks and driveways, painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work, temporary stage sets, qualifying shallow above-ground pools, agricultural shade cloth, playground equipment, qualifying window awnings, movable fixtures and partitions up to 5 feet 9 inches, minor electrical repairs and temporary testing, portable heating, gas, and mechanical equipment and minor parts, and limited plumbing leak, stoppage, and toilet reinstallation work. Emergency repairs require a permit application by the next working business day; exempt work must still comply with other laws and zoning.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?