Administrative overview · FIPS 06009
Calaveras County permit authority
The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.
Jurisdictional status
County
This county profile is the primary starting point for unincorporated-area permitting.
Responsible agency
Calaveras County Building Department
For a project in or near Calaveras County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.
Direct contact
(209) 754-6390; inspection line ext. 3
Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.
Permit counter
891 Mountain Ranch Road, Building E, San Andreas, CA 95249
Operating hours
Monday-Friday, 8:00 a.m.-4:00 p.m.; closed weekends and county holidays.
Review expectation
The county publishes projected review times of 15-30 minutes for in-person over-the-counter issuance, 24-48 hours online for over-the-counter permits, 20 working days for small projects, 30 working days for new dwellings/additions, 40 working days for new commercial buildings/additions, 35 working days for commercial alterations, and 10 working days for plan revisions; second reviews are generally shorter.
Compliance workbench
Choose the next project decision.
Apply online
Open the verified digital gateway, application form, and review timeline.
Open guide →Fees & penalties
Understand fee schedules, enforcement exposure, and stop-work liabilities.
Open guide →Codes & exemptions
Read the code framework, minor-work exemptions, and inspection lane.
Open guide →Agency website
Visit the primary public source for current notices and contact changes.
Open guide →Source trail
Official sources for this profile
Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.
Project questions
Frequently asked questions for Calaveras County
Who handles permitting for this jurisdiction?
Calaveras County Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.
How should I begin an application?
Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (209) 754-6390; inspection line ext. 3.
How long might review take?
The county publishes projected review times of 15-30 minutes for in-person over-the-counter issuance, 24-48 hours online for over-the-counter permits, 20 working days for small projects, 30 working days for new dwellings/additions, 40 working days for new commercial buildings/additions, 35 working days for commercial alterations, and 10 working days for plan revisions; second reviews are generally shorter.
How are inspections scheduled?
Request inspections through the eTRAKiT portal, the county's online inspection request form, or the Inspection Request Line at (209) 754-6390 ext. 3. Requests received before 3:00 p.m. are typically scheduled for the next business day; later requests are typically scheduled for the following business day. Qualifying licensed contractors may use the county's eInspect photo-documentation program for listed permit types.
Which codes and exemptions should I review?
The county's 2026 single-family submittal guide requires the currently adopted California code families: California Residential, Building, Electrical, Mechanical, Plumbing, Energy, Green Building Standards, Fire, and Wildland-Urban Interface Codes. These are the 2025 California code cycle in effect during 2026, together with applicable county amendments. Calaveras County's published R105.2 list exempts one-story detached accessory structures up to 120 square feet; fences up to 7 feet; retaining walls up to 4 feet unless supporting surcharge; qualifying ground-supported water tanks up to 5,000 gallons; sidewalks and driveways; painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; qualifying prefabricated pools less than 24 inches deep; playground equipment; qualifying window awnings; detached decks up to 200 square feet and 30 inches above grade meeting the listed conditions; limited low-voltage and minor electrical work; portable heating, cooking, cooling, and ventilation equipment; minor gas-equipment parts; and limited plumbing leak, stoppage, and toilet reinstallation work.