County Permit SearchU.S. compliance directory
CaliforniaColusa County

Administrative overview · FIPS 06011

Colusa County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Colusa County Community Development Department, Planning and Building Unit

For a project in or near Colusa County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(530) 458-0481 (Building); (530) 458-0480 (Community Development)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

1213 Market Street, Colusa, CA 95932

Operating hours

Building office Monday-Friday 7:30 a.m.-4:00 p.m.; inspections are conducted Monday-Thursday, 8:00 a.m.-4:00 p.m.

Review expectation

Plan-check review generally takes approximately 2-4 weeks depending on project size and scope. Simple reroofing, water-heater, electrical-panel, and similar repair permits may be issued over the counter.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Colusa County

Who handles permitting for this jurisdiction?

Colusa County Community Development Department, Planning and Building Unit is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (530) 458-0481 (Building); (530) 458-0480 (Community Development).

How long might review take?

Plan-check review generally takes approximately 2-4 weeks depending on project size and scope. Simple reroofing, water-heater, electrical-panel, and similar repair permits may be issued over the counter.

How are inspections scheduled?

Request inspections by phone at (530) 458-0481 at least three to five days in advance. The permit number, project location, approved stamped plans where applicable, and a posted legible address are required; cancellations must reach the office before 8:00 a.m. on the requested inspection day. The county charges a $47-per-hour re-inspection fee when the required information or site conditions are not ready.

Which codes and exemptions should I review?

Colusa County is operating under the 2025 California Building Standards Code (California Code of Regulations, Title 24), published July 1, 2025 and effective January 1, 2026, with applicable county ordinances and local fire-safety requirements. N/A. The county's public building materials identify permits as required for new buildings, additions, decks, pools, water heaters, patio covers, renovations, reroofing, electrical, plumbing, HVAC work, and structures over 120 square feet, but do not publish a complete current minor-work exemption list on the reviewed pages.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?